August 24, 1993 Docket Nos. STN 50-454, STN 50-455, DISTRIBUTION and STN 50-456, STN 50-457 Docket File NRC & Local PDRs PDIII-2 r/f JRoe Mr. D. L. Farrar JZwolinski JDyer Manager, Nuclear Regulatory Services CMoore JHickman Commonwealth Edison Company RAssa BClayton, RIII Executive Towers West III, Suite 500 ACRS(10)

OCC 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Farrar:

SUBJECT:

BYRON AND BRAIDWOOD METHODOLOGY TO DISPOSITION rlA IN CLASS 2 COMPONENTS (TAC NOS. M84433, M84434, H84435, M845 m By letter dated August 25, 1993, Commonwealth Edison Company requested NRC review and approval of a methodology to disposition flaws in Class 2 components.

This methodology was to be used to evaluate the RHR heat exchanger nozzle to shell welds.

Initial review by the NRC staff indicated that before the methodology could be approved by the NRC, it would first have to be approved by the American Society of Mechanical Engineers (ASME).

This t.as conveyed to Joseph Bauer of your staff by telephone and he agreed to withdraw the request for NRC review, pending review by the ASME.

Therefore, we now consider your request withdrawn.

Pending review by ASME and subsequent review and approval by the NRC, the ASME Class I flaw evaluation criteria should be followed for the Class 2 RHR heat exchanger nozzle.

Should you have any questions or comments, please contact me at (301) 504-3017.

Sincerely, i

3:.,7:n bigun by; John B. Hickman, Project Manager l

Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation j

cc:

See next page

' 0FC

[LA;PdlII-2 PM:PDIll-2 PM;P9J1J-2,, D:PDIII-2 NAME

't.MbbRE RASSAh JMYKbN JDYER h[/'

DATE

'b [d/93

'[/h/93 r / M/93 f [N/93

/ /93

/ /93 COPY

.YES/N0

[YESN0 h NO YES/hd)

YES/N0 YES/NO i

9309090152 930824 5 y r : * ?pA a TI (

etgMTE PDR ADOCK 05000454 ehgra ei p

PDR M'

~

I f"F'#

P i

j August 24, 1993 s

Docket Nos. STN 50-454, SIN 50-455, DISTRIBUTION and STN 50-456, STN 50-457 Docket File NRC & Local PDRs PDIII-2 r/f JRoe Mr. D. L. Farrar JZwolinski JDyer Manager, Nuclear Regulatory Services CMoore JHickman Commonwealth Edison Company RAssa BClayton, RIII Executive Towers West III, Suite 500 ACRS(10)

OGC 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Farrar:

SUBJECT:

BYRON AND BRAIDWOOD HETHODOLOGY TO DISPOSITION FLAWS IN CLASS 2 COMPONENTS (TAC N05. M84433, M84434, M84435, M84436)

By letter dated August 25, 1993, Commonwealth Edison Company requested NRC review and approval of a methodology to disposition flaws in Class 2 components.

This methodology was to be used to evaluate the RHR heat exchanger nozzle to shell welds.

Initial review by the NRC staff indicated that before the methodology could be approved by the NRC, it would first have to be approved by the American Society of Mechanical Engineers (ASME). This was conveyed to Joseph Bauer of your staff by telephone and he agreed to withdraw the request for NRC review, pending review by the ASME. Therefore, we now consider your request withdrawn.

Pending review by ASME and subsequent review and approval by the NRC, the ASME Class 1 flaw evaluation criteria should be followed for the Class 2 RHR heat exchanger nozzle.

Should you have any questions or comments, please contact me at (301) 504-3017.

Sincerely,

$.:dWswooby:

John B. Hickman, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc:

See next page I

OFC (ik;PdIII-2 PM:PDIll-2 PM;FDJ1Jd._,, D:PDIII-2 NAME NRE RASSAh JkK5MY JDYER h 7

i ? '/93 I/h/93 r /n'193 f#k/93

/ /93

/ /93

/

DATE COPY kVES/NO

[YES)ND h N0 YESh YES/N0 YES/NO 1

v

,[

Mr. D. L. Farrar Byron /Braidwood Power Stations

[f

  • Commonwealth Edison Company

+

)

CC:

Mr. William P. Poirier U. S. Nuclear Regulatory Commission Westinghouse Electric Corporation Byron / Resident Inspectors Office Energy Systems Business Unit 4448 North German Church Road Post Office Box 355, Bay 236 West Byron, Illinois 61010-9750 Pittsburgh, Pennsylvania 15230 Ms. Lorraine Creek Joseph Gallo, Esquire Rt. 1, Box 182 Hopkins and Sutter Manteno, Illinois 60950 888 16th Street, N.W., Suite 700 Washington, D.C.

20006 Mrs. Phillip B. Johnson 1907 Stratford Lane Regional Administrator Rockford, Illinois 61107 U. S. NRC, Region III 799 Roosevelt Road, Bldg. #4 Douglass Cassel, Esquire Glen Ellyn, Illinois 60137 17 East Monroe Street, Suite 212 Chicago, Illinois 60603 Ms. Bridget Little Rorem Appleseed Coordinator Michael Miller, Esquire 117 North Linden Street Sidley and Austin Essex, Illinois 60935 One First National Plaza Chicago, Illinois' 60690 Mr. Edward R. Crass Nuclear Safeguards and Licensing George L. Edgar Division Newman & Holtzinger, P.C.

Sargent & Lundy Engineers 1615 L Street, N.W.

55 East Monroe Street Washington, D.C.

20036 Chicago, Illinois 60603 l

Commonwealth Edison Company i

U. S. Nuclear Regulatory Commission Byron Station Manager Resident Inspectors Office 4450 North German Church Road Rural Route #1, Box 79 Byron, Il.1nois 61010 Braceville, Illinois 60407 Illinois Dept. of Nuclear Safety Mr. Ron Stephens Office of Nuclear Facility Safety Illinois Emergency Services 1035 Outer Park Drive l

and Disaster Agency Springfield, Illinois 62704 l

110 East Adams Street 1

Springfield, Illinois 62706 Commonwealth Edison Company l

Braidwood Station Manager Robert Neumann Rt. 1, Box 84 l

Office of Public Counsel

-Braceville, Illinois 60407

)

State of Illinois Center 100 W. Randolph, Suite 11-300 Chairman, Ogle County Board Chicago, Illinois 60601 Post Office Box 357 Oregon, Illinois 61061 i

EIS Review Coordinator Environmental Protection Agency Chairman Region V Will County Board of Supervisors 230 S. Dearborn Street Will County Board Courthouse Chicago, Illinois 60604 Joliet, Illinois 60434 Attorney Generel 500 South 2nd Street Springfield, IH i:m s 62701

_ _ _ _ _ _ _ _ _ _ _