Forwards Insp Repts 50-245/93-22,50-336/93-16 & 50-423/93-18 on 930802-06.Very Good Radiological Controls Implemented for Unit 3 Outage & Work Activities Reviewed for Units 1 & 2
ML20056G961
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/27/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20056G962 List:
References
NUDOCS 9309080009
Download: ML20056G961 (3)


See also: IR 05000245/1993022

Text

. . _

_

_

___ _ _ - - _ - _ _ _ _ - - - - -

,

i

.

.

O 2 1 1993

t

Docket Nos. 50-245

50-336

50-423

l

Mr. John F. Opeka

Executive Vice President - Nuclear

j

Northeast Nuclear Energy Company

l

P. O. Box 270

l

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

Subject:

NRC Combined Inspection Nos. 50-245/93-22; 50-336/93-16;

!

l

50-423/93-18

'

P

An unannounced radiological controls inspection was conducted on August 2-6,1993, by Mr.

R. L. Nimitz at the Millstone Nuclear Power Station Units 1, 2, and 3. The findings of the

inspection were discussed with Mr. R. Factora and others at the conclusion of the inspection on

l

August 6,1993.

l

Areas reviewed during the inspection were important to health and safety and are discussed m

!

the enclosed inspection report. The areas reviewed included program changes, organization and

i

staffing, training and qualifications, audits and assessments, efforts to maintain radiation

exposures as low as is reasonably achievable (AIARA), external and internal exposure controls,

instrument calibrations, control room ventilation system testing, radioactive material and

contamination controls, process monitor testing, and station housekeeping. The inspection

principally focused on the planning and preparation for, and the adequacy and implementation

of, radiological controls for the refueling outage at Millstone Unit 3.

The inspector also

reviewed activities at Units 1 and 2 including the entry of personnel into Unit 2 containment,

with the reactor at power, to perform leak repair activities on a letdown valve.

The inspection revealed that, overall, very good radiological controls were implemented for the

Unit 3 outage and the work activities reviewed at Units 1 and 2. Areas that were particularly

noteworthy included planning and coordination of work activities for the outage, the general

material condition of the station, and control of radioactive and contaminated material. The

radiological controls provided for the repair of the Unit 2 letdown valve were considered good.

Your efforts to maintain the conditions inside the Unit 3 reactor containment to allow personnel

entry with street clothing was commendable. Also, station efforts in the ALARA area continued

to be very good.

!

93090B0009 930827

ggg

I

PDR

ADOCK 05000245

>b.

m

O,;. g(f*

l'

O

PDR"

gn

pe

if $*zs

b

.

.

.

.

..

.

,

.

1

AU3 2 7 1953

Northeast Nuclear Energy Company

2

s

One unresolved item was identified. The item involved the training and qualification of

personnel performing instrument calibrations or using instruments. The inspector identified

three individuals for whom complete records of training and qualification to perform their

assigned tasks were not available. Your staff took immediate actions to evaluate this matter and

,

assure personnel had or would be pmvided appropriate training. Discussions with your staff

i

indicated on-the-job training had apparently been provided for the individuals but records were

3

not available. We will review this matter during a future inspection.

No response to this letter is required. Your cooperation with us is appreciated.

Sincerely,

odoinalsigned Br

James H.Joyner

James H. Joyner, Chief

,

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

i

Enclosure:

NRC Combined Inspection Report Nos. 50-245/93-22; 50-336/93-16; 50-423/93-18

cc w/ encl:

W. D. Romberg, Vice President-Nuclear, Operations Se; vices

i

S. E. Scace, Vice President, Millstone Station

H. F. Haynes, Nuclear Unit Director

J. S. Keenan, Nuclear Unit Director

F. R. Dacimo, Nuclear Unit Director

,

R. M. Kacich, Director, Nuclear Licensing

G. H. Bouchard, Director of Quality Services

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

,

K. Abraham, PAO (2)

'

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut SLO Designee

3

OFFIGiAL RECORD COW

,

_.

..

-

-

. .

- .

-.

.

...

.

..

-

.

-

. . _ . . _ .

-

- - . _ _ _ _ _ _ _ _ .

.

i

l

.l

-

l

!

(

!

l

!

l

I

t

!

,

l

Northeast Nuclear Energy Company

3

AUG 2 71993

i

l

i

i

'

bec w/ encl:

l

Region I Docket Room (with concurrences)

?

bec w/ encl: (Via E Mail)

i

D. Jaffe, PM, NRR

l

J. Andersen, NRR

l

G. Vissing, PM, NRR

l

V. Rooney, PM, NRR

j

V. McCree, OEDO

j

J. Stolz, NRR/PD I-4

l

!

i

!

!

l

!

1

!

,

f

f

l

.!

!

i

i

i

'

i

i

RI:DRSS

RSS

RI:DRSS

Nim tz

Pasciak

08/2d93

h/93

08/21 /93

OFFICIAL RECORD COPY

-

.-.

.-

.

.

.

. _ . .

- , - . . . - - - , . , , -

, - . - . , , . -