ML20056G802
| ML20056G802 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/26/1993 |
| From: | Taylor J NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Cottle W HOUSTON LIGHTING & POWER CO. |
| References | |
| NUDOCS 9309070185 | |
| Download: ML20056G802 (6) | |
Text
,
j..'
. ?.
. y aau n,q$*$
rf%
i FNf E
UNITED STATES l
56 j!
' NUCLEAR REGULATORY COMMISSION
' %,{ cr4/
WASHINGTON, D.C. 2055 4 0001 August 26, 1993 r
1 Dockets: 50-498 50-499 Licenses: NPF-76 NPF-80 i
L Houston Lighting & Power Company i
l ATTN: William-T. _Cottle, Group Vice President, Nuclear l
P.O. Box 1700-
. Houston, Texas: 77251-l t
Dear Mr. Cottle:
~
Thank'you for your letter of August 5,1993, which provided an initial response to our letter of June-10,1993, which forwarded the Diagnostic
. Evaluation Team (DET) report for the South Texas Project Electric Generating Station.
i We understand that;a more complete response that will outline specific actions
-you_ plan to take to assure timely resolution of performance deficiencies and I
address root causes will be submitted in two. documents. The first document, which you intend to address the issues in'the DET report, the Confirmatory Action Letter and its supplement, and other NRC inspections will be provided in the form of an Operational Readiness Plan, that will address near-term issues requiring resolution prior to either unit's restart. The Business F
- Plan, the secend document which you~ intend to submit, will address longer-term i
issues. We understand that the Operational Readiness Plan will be provided to NRC on August 27, 1993, and the Business Plan on October 15, 1993. We find your proposed schedule for ' submission of these plans to be acceptable.
~.To assure.that the relevant' issues-have been identified and adequately i '
- addressed, NRC plans to review both the Operational Readiness Plan and the Business Plan prior to the publ_ic neeting that will be conducted to discuss the readiness'of either unit to restart.
Sincerely, s
a es
.T or jp{0M f 9e r p ra s
v a
M L
~
I
-cc:
See next page
z Houston Lighting & Power Company j i
1 cc:
Houston Lighting & Power Company ATTN: James J. Sheppard, General Manager Nuclear Licensing P.O. Box 289 Wadsworth, Texas 77483 City of Austin Electric Utility Department ATTN:
J. C. Lanier/M. B. Lee 721 Barton Springs Road Austin, Texas 78704 1
City Public Service Board ATTN:
K. J. Fiedler/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296 l
Newman & Holtzinger, P. C.
I ATTN: Jack R. Newman, Esq.
I 1615 L Street, NW I
Washington, D.C.
20036 Central Power and Light Company ATTN:
D. E. Ward /T. M. Puckett P.O. Box 2121 Corpus Christi, Texas 78403 INPO I
Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957 j
Mr. Joseph M. Hendrie 50 Bellport Lane Bellport, New York 11713 Bureau of Radiation Control i
State of Texas 1100 West 49th Street Austin, Texas 78756 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street l
Bay City, Texas 77414 l
l Houston Lighting & Power Company l Licensing Representative j
Houston Lighting & Power Company Suite 610 Three Metro Center Bethesda, Maryland 20814 Houston Lighting & Power Company ATTN: Rufus S. Scott, Associate General Counsel P.O. Box 61867 Houston, Texas 77208 I
i 1
s Houston Lighting & Power Company <
a bec to DMB (IE01) bec distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/A)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File Project Engineer (DRP/A)
R. Bachmann, OGC, MS: 15-B-18 Section Chief (DRP/TSS)
H. Bailey, AE00, MS: MNBB 5219 S. Rubin, AE00, MS: MNBB 5219 S. Black, NRR, MS: 13-H-15 AI 93-244 I
- RIV:DRP/A
- C:DRP/A
- D:DRS
- ADD:DRP *D:DRP DRA 1;
MASato df WDJohnson SJCollir.3 ATHowell ABBeach J omery M lhoan 8/ /93 8/ /93 8/ /93 8/
/93 8/Q/,93 8/g/93 ED0 JMT[f ylor 84
/93
- phaviouslyconcurred
nr r, Lp ;;
i,t~ p r'q :,^; p y - y, p r O
..v.. u v a suw u a-avC i
[
Houston' Lighting & Power Company' ;
bec to DMB (IE01) l bec distrib. by RIV J. L..Milhoan-Resident Inspector Section Chief (DRP/A)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS i
RIV File Project Engineer (DRP/A)
. R. Bachmann, OGC, MS: 15-B-18 Section Chief-(DRP/TSS) l H. Bailey, AE00, MS: MNBB 5219 l
S. Rubin, AEOD, MS: MNBB 5219 S. B1ack, NRR, MS: 13-H-15' t
i I
l i
i 5
E i
i i:
L AI 93-244 I l-g:
D:DR h RA RIV:DRP/A CiD /A D IS$
' ADD:DR ABBeic'fRA 1-MASatoriusidf WDJohnson JColljd ATHowell JMMontgomery JLMilhoan 8 4 /93 8/#/93 8 40 3-8/10/93 8/p9 8/ /93 8/ /93 J
i I
l Houston Lignting & Power Company bec to'DMB (IE01).
bec distrib. by RIV:
J. L. Milhoan
- esident Inspector Section Chief-(DRP/A)
_ sa Shea, RM/ALF, MS: MNBB 4503 MIS' System
- RSS-FIPS RIV File
- aject Engineer (DRP/A)
R. Sachmann. 0GC, MS: 15-B-15 isction Chief (DRP/TSS)
H. Bailey, AE00, MS: MNBB 5219 S. Rubin. AE0D, MS: MNBB 5219
- 5. Black. NRR. MS: 13-H-15
~
s
-03007G AI 93-244 I
~
, -.