PHILADELPIIIA ELECTRIC COMI%NY j
NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD.
WAYNE. PA 19087-5691 (215) 6404K10 l
August 27, 1993 STATION SUPPORT DEPARTMENT Docket Nos. 50-277 50-278 50-352 50-353 License Nos. DPP.-44 DPR-56 NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 Fitness-for-Duty Program Performance Data for the Period January 1993 through June 1993 Gentlemen:
As required by 10 CFR 26.71(d), this letter submits the performance data for our Fitness-for-Duty program for the period January 1993 through June 1993.
The data for our Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and Limerick Generating Statioa (LGS), Units 1 and 2, sites are provided in Attachments 1 and 2.
Data for our Corporate Office and Nuclear Group Headquarters specimen collection sites (i.e., 2301 Market Street, Philadelphia, PA and 955-65 Chesterbrook Boulevard, Wayne, PA respectively) are also provided in Attachment 3.
The data are reported on the January 1992 revision of the Fitness-for-Duty (FFD) Performance Data form provided by the Nuclear Management and Resources Council (NUMARC), and include the following.
Drugs tested for and cut-off levels.
Workforce population tested.
Numbers of tests and results by population and type of test (i.e, pre-access, for-cause, random, follow-up, and other types of tests.)
Substances identified.
)
j l
030 N 9309030244 930827 k
/
PDR ADOCK 05000277 w
R PDR f
I
~...
Fitness-for-Duty Program Performance August 27, 1993 Data - Period 1/93 through 6/93 Page 2
\\
Attachments 1, 2, and 3 also include the following.
Summary of management actions.
Analysis of the data and appropriate actions that have been taken.
Random testing rate.
Note that there were no events that were reportable in accordance with 10CFR26.73 during this period.
i If you have any questions or require additional information, please contact Very truly yours,
. d.
.d G. A. Hunger, Director Licensing Section Attachments cc:
T. T. Martin, Administrator, Region I, USNRC w/ attachments USNRC Senior Resident Inspector, PBAPS w/attahcments N. S. Perry, USNRC Senior Resident Inspector, LGS w/ attachments
~
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 j
I Philadelphia Electric Company 01/01/91 - 06/10/01 Company s Ldonra EnW Peach Bottom Atomic Power Station Lecanon David M. Carley (215) 8hl-5703 Contaci Name Fhow (Mee t ea c::ce}
Cutoff s: Screen / Confirmation (ng/ml)
O Appendix A to 100FR 26 Marijuana 100 /
15 Amphetamines 1000 f 500 f
/
/
Cocaine 300 150 Phencyclidine 25 /
25 Opiates 300 / 300 Alechol(% BAC) 0.06 %
/
1 Leng-Term Short-Term Testing Results Licensee Employees Centractor Personnel Contracter Personnel Average Number wilt 2865
- 1924
- Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 11 259 4
[
Post accident 2
1 0
Observed behavior 3
5 1
Random 590 1
462 1
Follow-up 21 6
Other 4
1 1
Total 631 1
734 7
REv.1/92
- Includes individualn with dual-site access at PEAPS & ICS.
ATTACHMENT 1 Attachmenti Page1 Summary of Data Analysis and Management Actions Peach Bottom Atomic Power Station i
January - June 1993 I. Initiatives Taken The following summarizes the results of sweeps conducted by the Philadelphia Electric Company's (PEco's) drug sniffing canine teams at Peach Bottom Atomic Power Station (PBAPS) during the Period.
A.
January 27, 1993 - General team search of the Nuclear Quality Assurance Section. Results: Ten (10) activations. No drugs found or forensic samples taken.
B.
February 26, 1993 - General team search of the Nuclear Training Section. Results: Eight (8) activations. No drugs found or forensic samples taken.
C.
March 30, 1993 - General team search of the Site Support Office and the Protection Technology, Inc. office trailer. Results: Two (2) activations. No drugs found or forensic samples taken.
D.
April 12, 1993 - For-cause team search of private vehicle.
Results: Two(2) activations. No drugs found or forensic samples taken.
E.
April 23, 1993 - For-cause team search of private vehicle.
Results: Three (3) activations. No drugs found or forensic samples taken. Alcoholic Beverage found in vehicle. Contractor's plant access denied.
F.
April 29, 1993 - General team search of the PBAPS parking lot.
Results: Three (3) activations. No drugs found or forensic samples taken.
G.
June 16, 1993 - General team search of the new, site management building. Results: Seven (7) activations. No drugs found or forensic samples taken.
i II. Manaaement Actions During the period, one (1) PEco employee tested positive at PBAPS, as a j
result of a random test. The employee was provided treatment / rehabilitation through PEco's Employee Assistance Program (EAP). Unescorted access has not been reinstated.
During the period, seven (7) contractor employees (i.e.,
four (4) pre-access, one (1) for-cause/ observed behavior, one (1) random, and one (1) "other") tested positive at PBAPS. Unescorted access has been denied for those contractor employees in accordance with PECo's Fitness-for-Duty (FFD) Specification for Contractors.
)
Page 2 III. Events Reported Under 10 CFR 26.73 There were no events reported to the NRC under 10 CFR 26.73 during the period January - June 1993.
IV. Nuclear Quality Assurance Audit During the period, the annual performance based audit of the Fitness-for-Duty program was initiated.
V. Random Testina Rate PEco conducts random testing at the annualized rate of 100%. The
" average number with unescorted access" includes personnel badged at both PBAPS and Limerick Generating Station. PEco maintains separate testing " pools" for employees and contractors.
L 1
i
4 Fitness for Duty Program
~
Performance Data Personnel Subject to 10CFR 26 Philitdelphia Electric Comynny 01/01/93 - 06/30/91 cunpany 4 Lents Ending l
Limerick Generating Station tocamen David M. Sarley (215) Shl-5703 contae t ame Pre
- pct.ee tea exe)
Cutoff s: screen /Confirmatio n (ng/mi)
O Appendix A to 10CFR 26 Marijuana 100 /
15 Amphetamines 1000 f 500 f
Cocaine 300 150 Phencyclidine 25 /
25 I
/
Opiates 300 / 300 Alechol(% B AC) 0.0h %
/
r Leng-Term Short. Term Testing Results Ucensee Empicyees Contractor Personnel Contracter Personnel Average Number witt Unescorted Access 2865
- 1924
- Categories Tested Pestive Tested Positive Tested Positive Pre-Access 30 1
559 4
A Post a:cident 8
5 O
h Observed behavior 3
1 2
1 Random 596 2
492 1
1 1
i Follow-up 29 5
2 C"her 9
Total 675 4
1065 6
REv.1/92
- Includes individuals with dual--site access at PEAPS & LGS.
I e
A I
I 5
m 4
w e
3 w
v
+
2 v
'w e
w 1
D e
9 lat s
s
+
e uT e
fe o Rt lo M
s h
a t
s e
o 2
2 4
e c
c lA
-w w
n w
a 1
4 w
t s
yo b
c n e
y ni e
m u
ed w
i 1
1 S
hl c P
c i
f i
- s c
e e W
h n e
e
-p 1
1
+
pi p
mm r
e a
S At W
e u
r o
f s
w e
s t
w t
ia s
s p
r n
e O
T e
=
e o
w n
v i
ia g
t c
3 3
w s
i o
e s
F C
l h
o P
s h
a n
e d
a
=
u e
j 2
2 m
ira e
r M
r i
a f
n
-m s
s o
r r
A s
to o
C t
e c
c f
e a
a w
y r
r o
lo t
tn n
n p
o o
w m
C C
E o
m m
r w
e r
a d
e e
e k
s T-T-
n g
r la t
a e
n o
t e
c o
h o
r U
L S
T B
k i
l{,
c
ATTACHMENT 2 Page1 Summary of Data Analysis and Management Actions Limerick Generating Station January - June 1993 I. Initiatives Taken 4
The following summarizes the results of sweeps conducted by Philadelphia Electric Company's (PECo's) drug sniffing canine teams at Limerick Generating Station (LGS) during the period.
A.
January 15, 1993 - General team search of the Technical Support Center, Turbine Building (Elevation 217), Radwaste Control Room, and Units 1 and 2 Turbine Building (Elevation 239). Results: No activations. No drugs found or forensic samples taken.
B.
February 19, 1993 - General team search of the third and forth floors of the John S. Kemper Office Building. Results: No
+
activations. No drugs found or forensic samples taken.
C.
March 15, 1993 - General team search of the first and second floors of the John S. Kemper Office Building. Results: One (1) activation. No drugs found or forensic samples taken.
D.
May 18, 1993 - PECo employee purchased a used vehicle and requested search for drugs prior to reporting for work. Results:
No activations. No drugs found or forensic samples taken.
E.
June 17, 1993 - General team search of the Site Management Building. Results: One (1) activation. No drugs found or forensic samples taken.
1 II. Manaaement Actions During the period, four (4) PEco employees (i.e., one (1) pre-access, one (1) for-cause/ observed behavior, and two (2) random) tested positive at LGS. The pre-access test was conducted for a temporary PECo employee.
Unescorted access was denied and the temporary employee was discharged.
The three (3) other employees were provided treatment / rehabilitation through PECo's Employee Assistance Program (EAP). Unescorted access was reinstated for one (1) of the employees. The remaining two (2) employees were denied unescorted access and were subsequently discharged.
In accordance with PEco's Fitness-For-Duty (FFD) Specification for Contractors, escorted access was denied for the six (6) contractor employees (i.e., four (4) pre-access, and one (1) for-cause/ observed behavior, one (1) random) who tested positive during the period.
l Page 2 III. Events Reported Under 10 CFR 26.73 There were no events reported to the NRC under 10 CFR 26.73 during the period January - June 1993.
IV. Nuclear Quality Assurance Audit During the period, the annual performance based audit of the Fitness-for-Duty program was initiated.
t V. Random Testina Rate PECo conducts random testing at the annualized rate of 100%. The
" average number with unescorted access" includes personnel badged at both Peach Bottom Atomic Power Station (PBAPS) and LGS. PEco maintains separate testing "paols" for employees and contractors.
)
J j
l
Fitness for Duty Program
~
Performance Data Personnel Subject to 10CFR 26 Philadelphia Electric Company 01/01/93 - 06/30/9"4 Cempany 5 lertN Ert6ng Corporate and Nuclear Headquarters Locanon David M. Sarley (215) 8hl-5703 Conac ha ne N ie (,ncho tea exe)
CutoMs: Screer/ Confirmation (ng/mi)
O Appendix A to 100FR 26 Marijuana 100 /
15 Amphetamines 1000 f 500 f
Cocaine 300 150 Phencyclidine 25 1 25
/
/
Opiates 300 / 300 Alcohol (% BAC) 0.0h %
/
Leng-Term Short-Term Testing Results Utensee Employees Contractor Personnel Contractor Personnel i
Average Number witt-2865
- 1924
- Unescorted Access Categories Tested Postive Tested Poshive Tested Positive Pre-Access 20 12 A
Post a:cident 8
2 0
h Obser.ed behavior I
j Random 304 1
62 1
-l Follow up 19 Other 8
Total 360 1
76 1
- Includes individuals with dual-site access at PBAPS & IES.
Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal Marijuana Coca!no Opiates tamines clidino Ncohof to Test 1
2 3
4 5
Ucensee Employees 1
Long-Term Contractors Short-Term Contractors 1
A 2
Total 1
l 1
eo e e t
4 e
I e
.m--.
_.,_u-
.y...,... +
...vm
= -
.-w..:
e
...9,,
...g.
s,._
I ATTACHMENT 3 Page1 i
Summary of Data Analysis and Management Actions Corporate and Nuclear Group Headquarters January - June 1993 I. Initiatives Taken The following summarizes the results of sweeps conducted by Philadelphia Electric Company's (PEco's) drug sniffing canine teams at Corporate and Nuclear Group Headquarters (i.e.,2301 Market Street, Philadelphia, PA and 955-65 Chesterbrook Boulevard, Wayne, PA respectively) during the period.
A.
March 25, 1993 - General team search of the 955 Building, "B" Wing, first floor. Results: No activations. No drugs found or forensic samples taken.
B.
June 22, 1993 - General team search of the 965 Building, "A"
and "B" Wings, second floor. Results: Two (2) activations. No drugs found or forensic samples taken.
II. Manaaement Actions During the period, one (1) PECo employee tested positive as a result of a random test. The employee was provided treatment / rehabilitation through PECo's Employee Assistance Program (EAP). The employee's unescorted access was subsequently reinstated.
During the period, one (1) contractor employee tested positive as a result of a random test. The contractor employee had not been granted unescorted access, but was working as a collection site person. The contractor employee was discharged in accordance with PEco's Fitness-For-Duty (FFD) Specification for Contractors.
Ill. Events Reported Under 10 CFR 26.73 There were no events reported to the NRC under 10 CFR 26.73 during the period January - June 1993.
3 IV. Nuclear Ouality Assurance Audit During the period, the annual performance based audit of the Fitness-for-Duty program was initiated.
V. Random Testina Rate l
PECo conducts random testing at the annualized rate of 100%. The " average number with unescorted access" includes personnel badged at both Peach Bottom Atomic Power Station (PBAPS) and Limerick Generating Station. PEco maintains separate testing " pools" for employees and contractors.
l