ML20056G505
| ML20056G505 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/26/1993 |
| From: | Rogers J MASSACHUSETTS, COMMONWEALTH OF |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| Shared Package | |
| ML20056G506 | List: |
| References | |
| CON-#393-14247 93-678-03-OLA, 93-678-3-OLA, OLA, NUDOCS 9309030204 | |
| Download: ML20056G505 (1) | |
Text
/ 2Y t
A "Z4e LwwmaeaK cf fassacAuses
- aghm, mu
?
f2 c{'!lbe.S//twittVf YP11Entl e hi(s' ;yg,!
/d/./temail.h.tcr{
T3 c7
~
]
P-SCOTT HARSHBARGER anon =cv ctutrat August 26, 1993 Office of the Secretary Attn: Docketing and Service Branch U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 Re: Boston Edison Conpany (Pilgrim Nuclear Power Station)
Docket No. 50-293-OLA (Spent Fuel Pool)
ASLB No. 93-678-03-OLA i
I
Dear Sir / Madam:
Enclosed for filing in the above entitled matter is the Massachusetts Attorney General's Withdrawal of Motion to Intervene and Request for Hearing.
Thank you for your prompt attention to this matter.
Sincerely,
, Joseph W.
, ers bAssistant Attorney General i
enclosures cc: Per enclosed Certificate of Service l
9309030204 930826 PDR ADOCK 05000293 l
0 PDR O]
b l