Forwards Rept on Status of Replacement of Wellesley Reception Ctr.Advises That Ma Emergency Mgt Agency (MEMA) Directing Replacement Efforts,Since Responsibility for Emergency Preparedness in Ma Rests W/Mema
ML20056G273
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/13/1993
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To: De Agazio A
NRC
References
NYN-93113, NUDOCS 9309020343
Download: ML20056G273 (4)


Text

.

i Seab oo NH 03874 Telephone (603)474-9521 J[h

[

Facsimile (603)474-2987

=

y,__

Energy Service Corporation Ted C. Feigenbaum Senior Vice President and Chief Nuclear Officer i

l NYN-93113 August 13,1993

]

Uni:d States Nuclear Regulatory Commission

~

Washington, D.C. 20555 Attention:

Mr. Alben W. De Agazio

References:

(a)

Facility Operating License No. NPF-86, Docket No. 50-443 (b)

Letter dated July 7,1993 from Albert W. De Agazio (USNRC) to Ted C.

Feigenbaum (North Atlantic) regarding the replacement of the Wellesley reception center

Subject:

Repon on Status of the Replacement of the Wellesley Reception Center

Dear Mr. De Agazio:

By your letter of July 7,1993, you requested Nonh Atlantic Energy Service Corporation (North Atlantic) to provide a report on the present status and the future schedule of efforts to establish a replacement for the Massachusetts Highway Department's Wellesley reception center. Nonh Atlantic will submit monthly status reports until the replacement reception center is established.

North Atlantic lelieves that the replacement facility will be established by December 31,1993.

The date for the establishrrmt of the replacement facility is, however, dependent upon obtaining an

,N agreement for the use of the selected facility within a timely manner. The Massachusetts Emergency i

Management Agency (MEMA) has developed a schedule which shows a September 17, 1993 date for obtaining such an agreement. Attachment A to this Icter describes the progress made to date in

)

establishing the replacement for the Wel'esley facility. Attachment B provides the MEMA schedule and i

listing of the activities that remain to be carried out.

j MEMA is directing the efforts to replace the Wellesley facility, since the authority and responsibility for emergency preparedness in Massachusetts rests with MEMA. North Atlantic is fully supporting MEMA's efforts. In panicul-. M--S Atlantic will be supplying planning assistanceto MEMA in the development of the revisions to the plans and procedures necessitated by the change in reception

)

center location. While it is expected that much of the equipment needed at the new facility will be rolocated from the Wellcsley facility, North Atlantic will fund the purchase of ndditional equipment, as needed.

310085 ob gs member of the Northeast Utilities system 9309020343 930813 o

A\\

@bt PDR ADOCK 05000443

\\

F PDR i

i

+

l eab ok NH 03874 Telephone (603)474-9521

=

j[h

(

Facsimile (603)474-2987 Energy Service Corporation Ted C. Feigenbaum Senior Vice President and Chief NuclearOfficer NYN-93113 August 13, 1993 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Mr. Albert W. De Agazio

References:

(a)

Facility Operating License No. NPF-86, Docket No. 50-443 1

(b)

Letter dated July 7,1993 from Albert W. De Agazio (USNRC) to Ted C.

Feigenbaum (North Atlantic) regarding the replacement of the Wellesley reception center

Subject:

Report on Status of the Replacemeni of the Wellesley Reception Center

Dear Mr. De Agazio:

By your letter of July 7,1993, you requested North Atlantic Energy Service Corporation (North l

Atlantic) to provide a report on the present status and the future schedule of efforts to establish a j

replacement for the Massachusettsliighway Department's Wellesley reception center. North Atlantic will j

submit monthly status reports until the replacement reception center is established.

i North Atlantic believes that the replacement facility will be established by December 31,1993.

Die date for the establishment of the replacement facility is, however, dependent upon obtaining an l

agreement for the use of the selected facility within a timely manner. The Massachusetts Emergency l

Management Agency (MEMA) has developed a sch:xiule which shows a September 17, 1993 date for l

obtaining such an agreement. Attachment A to this letter describes the progress made to date in -

establishing the replacement for the Wellesley facility. Attachment B provides the MEMA schedule and l

listing of the activities that remain to be carried out.

MEMA is directing the efforts to replace the Wellesley facility, since'the authority and responsibility for emergency preparedness in Massachusetts rests with MEMA. North Atlantic is fully supporting MEMA's efforts. In particular, North Atlantic will be supplying planning assistance to MEMA in the development of the revisions to the plans and procedures necessitated by the change in reception center location. While it is expected that much of the equipment needed at the new facility will be relocated from the Wellesley facility, North Atlantic will fund the purchase of additional equipment, as needed.

310005 d

merrber of the Northeast Utilities system 9309020343 930813 ySj n\\

PDR ADDCK 05000443

\\

F PDR

l United States Nuclear Regulatory Commission August 13,1993 Attention:

Mr. Albert W. De Agazio Page two i

Insofar as this report describes the activities of MEMA, North Atlantic has reviewed the i

information contained in this letter with MEMA and they have concurred that it accurately reflects the

)

status and schedub of their efforts.

Should you have any questions regarding the information contained in this letter, or require additional information, please contact Mr. Anthony M. Callendrello at (603) 474-9521, extension 2751.

Very truly yours, Ted C. Feige aum TCF:AMC/act Attachments cc with attachments:

Mr. Thomas T. Martin Mr. Robert A. Erickson Regional Administrator Chief, Emergency Preparedness Branch U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Region 1 Washington, DC 20555 475 Allendale Road King of Prussia, PA 19406 Mr. Ebe McCabe Mr. David Rodham U.S. Nuclear Regulatory Commission Director, MEMA Region I 400 Worcester Road 475 Allendale Road P.O. Box 1496 King of Prussia, PA 19406 Framingham, MA 01701-0317

)

l Mr. Noel Dudley Document Control Desk NRC Senior Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 1149 Washington, DC 20555 Seabrook, Nil 03874 i

l l

l

i ATTACHMENT A STATUS OF ACTIVITIES i

REPLACEMENT OF WELLESLEY RECEPTION CEN n'ER As of August 3,1993, the following progress has been made in the establishment of a replacement for the Wellesley reception center.

The staff of the Massachusetts Emergency Management Agency (MEMA) has identified ten potential sites as replacements for the Wellesley facility. These candidates have been selected i

based on distance from Seabrook Station (at least 5 miles beyond the 10 mile EPZ boundary),

location with respect to the EP7. communities of Newburyport and Newbury, ease of access from major highways, parking capacity for evacuee vehicles, and other criteria.

MEMA stafT has conducted on-site surveys of the potential sites to determine their suitability as

]

a reception center. Futors considered in the surveys include facility layout, number and size of rooms, availability of shower facilities and overall traffic flow. These surveys have included initial contact with the parties (or their representatives) responsible for the administration of the facilities. A summary of the survey results and recommendations for sites to be considered further was completed on August 11,1993. Seven of the potential sites received positive evaluations and three were eliminated from further consideration.

I l

l l

l i

1 I

I l

l 1

r, ATTACilh1ENT B SCliEDULE OF ACTIVITIES REPLACEhiENT OF WELLESLEY RECEPTION CENTER l

l 4

Site Selection 6/1/93 - 9/17/93 Identify potential sites Inspect potential sites Select finalists Obtain agreement

)

Plan / Procedure Revision 9/20/93 - 11/30/93 Develop reception center procedures i

Revise h1ARERP Revise State EOC procedures l

Revise EBS messages / news releases Revise Area I plan / procedures Revise notification procedures Revise local plans / procedures Revise bus route maps Revise trafiic management manual (if needed)

-l Revise ETE (if needed) 2 1

i Facilities 8/l8/93 - 12/31/93 Determine equipment needs

[

Procure new equipment Install new equipment Transfer balance of equipment i

Revise inventory list Revise Area I administrative manual Public Information hiaterial 9/27/93 - 12/10/93 Revise public information material Print public information material Distribute public infonnation material Staffing / Training 9/20/93 - 12/17/93 Finalize stafling for new facility Develop / revise tmining material Conduct training hiiscellaneous Planning 9/27/93 - 11/30/93 Identify new host schools (if needed)

Identify new mass care shelters (if needed) i

.... ~.,

_,.. _ _.- _,