AUG 2 51993 l
Docket 70-1257 I
License SNM-1227 l
Mr. L. J. Maas, Manager Regulatory Compliance Siemens Power Corporation 2101 Horn Rapids Koad l
Richland, Washington 99352-0130
Dear Mr. Maas:
SUBJECT:
FINAL AGENDA FOR SEPTEMBER 8, 1993, MEETING Enclosed is a final agenda for the meeting at the Nuclear Regulatory Commission headquarters on September 8, 1993. The two topics of license renewal schedule and waste management have been deleted from the agenda because of time constraints; however, we hope to address these two issues in detail at a later date.
If you have any questions about the agenda or other items concerning the meeting, please call me at 301-504-2505.
Sincerely, WN S@ed BT Mary Thoma Adams Licensing Section 2 Licensing Branch Civision of Fuel Cycle Safety and Safeguards, NMSS
Enclosure:
As stated DISTRIBUTION w/encls.
(Control No. )
Docket No. 70-1257 PDR NRC File Center NMSS R/F FCLB R/F Region V CHooker, RV FCSS R/F ETenEyck JReese, RV RScarano, RV RMilstein MK1asky MLamastra RPierson 0FC FCLB r FCLB 6
FCLB_
6 Madams)/hN VTharpe 4TMk NAME DATE 08/)5/93 D
08/Afi 93 08atl93
/
C = COVER E = COVER & ENCLOSURE N = NO COPY
[G:\\ agenda.spc]
3100:
g 9309020211 930825 I
PDR ADOCK 07001257
\\(\\
C PDR i
\\
j,..
I
.r l
I AGENDA FOR SIEMENS POWER CORP MEETING SEPTEMBER 8, 1993 OWFN, Conference Room 4-B-11 I
8:00 INTRODUCTIONS - Mary Adams, Licensing Project Manager f
8:15 CRITICALITY SAFETY ANALYSES UPDATE PROGRAM Report from SPC - R. Vaughan, Manager, Safety, Security, and Licensing
- Program Plan Summary
- Progress to date
- Findings i
- Obstacles
- Program Plan Changes l
- Schedule for future program efforts l
10:15-11:30 - BREAK Discussion - Region V; R. Pierson, FCLB; C. Smith, FCOB 11:45 - 12:45 LUNCH 12:45 DRY CONVERSION EXPANSION PLANS Report from SPC - M. Valentine, Manager, Manufacturing Engineering
- I.J. Urza, Manager, Manufacturing Technology
- Description of dry conversion process
- Experience at Richland and Lingon Plants
- Safety provisions:
radiation, fire, criticality, environmental protection, emergency response 2:15-2:30 - BREAK
- Design and construction schedule
- Anticipated start-up date
- License amendment application schedule NRC discussion - R Pierson, M. Tokar, M. Adams, FCLB 4:00 - ADJOURN
.