ML20056G128
| ML20056G128 | |
| Person / Time | |
|---|---|
| Issue date: | 07/30/1993 |
| From: | Marcus G Office of Nuclear Reactor Regulation |
| To: | Larhette R INSTITUTE OF NUCLEAR POWER OPERATIONS |
| References | |
| NUDOCS 9309020102 | |
| Download: ML20056G128 (7) | |
Text
p July 30, 1993 4
Mr. Richard P. LaRhette Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957
Dear Mr. LaRhette:
i Enclosed for your information is a list of generic communications under development by the NRC staff. The list includes those Generic Letters (GL),
t Administrative Letters (AL), Bulletins (BL), Information Notices (IN), and Temporary Instructions (TI) reported to us by July 30, 1993. New items on the i
list or changes in the status of previously listed items are identified by a notation in brackets. A review is underway to determine if all of the listed generic communications are currently active. As a result of our review to date, we have decreased the number of listinge.
Listings which are not currently active are identified in brackets w temporarily removed.
Sincerely, c
C.;~-
Gail H. Marcus, Chief Generic Communications Branch Division of Operating Reactor Support Office of Nuclear Reactor Regulation
Enclosure:
As stated S. D. Richardson, Defense Programs (Savannah River), DOE cc:
R. W. Barber, Safety and Quality Assurance, DOE S. Scott, Office of Nuclear Safety, NS-10, DOE DISlRIBUTION w/ enclosure JTShedlosky, OCM JScarborough, OCM KAConnaughton, OCM JGuttmann, OCM WHBateman, EDO JGPartlow, NRR All NRR Division Directors All NRR Bra:2ch Chiefs All Regional Division Directors KGray, NRR RIngram, NRR CACarpenter,NRR KRamsey, NMSS FCCombs, NMSS LCShao, RES WMinners, RES JTLarkins, ACRS GHolahan, AE0D JERosenthal, AEOD PWBaranowsky, AE00
.0GCB Members PDR Central l Files DORS R/F
-CD 0GCB R/F JBirmingham R/F 3I Document Name:
INP0 LIST.LTR
'g OGCB: DORS:NRR C/0GCB: DORS:NRR 3
JBirminghamf16 GHMarcus@d 07/($/93 07/3$/93
- SI 9309020102 930730
/
F 3' P~; jfs~h PDR I&E F
4/
MISC PDR y,
Nfl0 RE CIFEi COPY q iW m a
i Page No.
1 07/30/93
{
d PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC l
]
TP SUBJECT SOURCE CONTACT PHONE NO i
GL ISI OF MARK I & II STEEL NRR DE Chen P Tan (301) l CONTAINMENTS, REFUEL CAVITIES &
ESGB 504-3315 l
DRAINAGE SYSTEMS GL LINE ITEM TS IMPROVEMENT, ACCELERATED NRR DORS Om Chopra
. (3 01)
EDG TESTING OTSB Tom Dunning 504-3150
?
I i
GL INST OF MICROPROCESSORS IN SAFETY NRR DRCH Paul Loeser (301)
SYSTEMS VIA 10 CFR 50.59 HICB 504-2825 l
GL GROUNDS IN DIRECT CURRENT NRR DE F Burrows (301)
DISTRIBUTION SYSTEMS EELB 504-2901 GL [ TEMPORARILY REMOVEO] UTILITY NRR DSSA Robert (301) l IMPLEMENTATION OF ACCIDENT MANAGEMENT SPSB Palla 504-1095 l
PLANS i
GL TS MODIFICATIONS FOR EMERGENCY &
NRR DORS Tom Dunning (301)
SECURITY PLANS OTSB 504-1189 1
GL LINE-ITEM TS IMPROVEMENTS TO REDUCE NRR DORS Tom Dunning (301) l SURVEILLANCE REQUIREMENTS FOR TESTING OTSB 504-1189 DURING POWER OPERATIONS GL TS MODIFICATION, REQUIREMENTS FOR NRR DORS Bob Tjader (301)
{
j MOVABLE CONTROL ASSEMBLIES OTSB 504-1187 l
GL REMOVAL OF TS TABLES FOR RESPONSE NRR DORS Tom Dunning (301)
TIME LIMITS OTSB 504-1189 j
IN RVW OF MFR's INFO ON COMPUTERIZED NMSS IMNS Cathy Haney (301)
. THERAPY PLANNING SYSs IMOB 504-2628 GL INSERVICE LEAK AND HYDROSTATlc NRR DORS Tom Dunning (301)
}
TESTING TS BACKFIT APPEAL OTSB 504-1189
)
GL INTERFACING SYSTEMS LOCA IN LIGHT RES RPSIB Gary (301) l WATER REACTORS Burdick 492-3812 BL [BL 91-01 SUP 1, 7/27/93] REPORTING NMSS IMNS Mary (301)
LOSS OF CRITICALITY SAFETY CONTROLS IMSB Snodderly 504-3424 GL NRC POSITION ON EPRI OBE CRITERIA &
NRR DE Goutam (301) d EPRI GUIDE FOR EARTHQUAKES ECGB Bagchi 504-2733 j
i GL EMERGENCY CLASSIFICATION DURING NRR DRSS Scott (301)
{
CONTAINMENT VENTING PEPB Boynton 504-2919 l
1 f
I
4
~
Page No.
2 07/30/93
(
PROPOSED GENERIC COMMUNICATIONS l
IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO l
GL LONG TERM ACTIONS FOR THERMAL NRR DSSA Laurence E (301) j HYDRAULIC STABILITY SRXB Phillips 504-3232 l
1 GL TS MODIFICATION, REQUIREMENTS FOR NRR DORS Tom Dunning (301)
ACCIDENT MONITORING INSTRUMENTATION OTSB 504-1189 i
IN APPLICABILITY OF 10 CFR 70.24, NRR DRPW L Kokajko (301)
" CRITICALITY ACCIDENTS" PD5 504-1369 IN [IN 93-57,-7/23/93] NON-POWER REACTOR NRR DORS Marvin (301)
'j SOFTWARE VERIFICATION AND VALIDATION ONDB Mendonca 504-1128 REGULATORY EXPERIENCE IN REPORTING FUEL CYCLE AND MATERIALS NMSS IMNS Kevin (301)
INCIDENTS TO THE NRC OPS CENTER IMOB Ramsey 504-2534
)
l i
IN [IN 93-50, 7/8/93] EXTENDED STORAGE NMSS IMNS Kevin (301) l OF SEALED SOURCES IMOB Ramsey 504-2354 GL MODEL TECHNICAL SPECIFICATIONS TO NRR DRSS SP (301)
INCORPORATE THE REVISED 10 CFR PART PRPB Klementowic 504-1084 20 z
j l
IN IN 92-51 SUP: MISAPPLICATION AND NRR RVIB Steve (301)
]
INADEQUATE TESTING OF MCCBs DRIL Alexander 504-2995 i
TI SHUTDOWN RISK AND OUTAGE MANAGEMENT NRR DRIL Don Norkin (301)
INSPECTION RSIB 504-2954 GL AVAILABILITY AND ADEQUACY OF DESIGN NRR DRIL Eugene (301)
BASES INFORMATION RSIB Imbro 504-2967
)
j GL [ CANCELED] PLANT OPERATION DURING NRR DSSA Mark Caruso (301)
I j
SHUTDOWN AND LOW POWER SRXB 504-3235 i
IN [IN 93-55, 7/21/93] POTENTIAL PROBLEM REGION II Nancy (301)
WITH MAIN STEAMLINE BREAK ANALYSIS Campbell 504-2836 i
3 1
FOR MAIN STEAM VAULTS / TUNNELS l
IN FAILURES OF WESTINGHOUSE 7300 PROCESS REGION II T J Kim (301) l CARDS FROM INCORRECT FUSING 504-2841 IN POTENTIAL FAILURES OF EDGs CAUSED BY REGION I Vern Hodge (301)
COLD FUEL OIL 504 1861 IN [ CANCELED] INDETERMINATE SOLENOIDS IN NRR DRIL Kamal Naidu (301)
THE MSIV AIR-MANIFOLD OPERATORS RVIB 504-2980 IN WESTINGHOUSE REACTOR COOLANT PUMP REGION III Rick Roton (815)
SHUTDOWN PROCEDURES FOR NO. 1 SEALS 458-2852 i
n
~.
1 Page No.
3
~
07/30/93 j
PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO 4
IN NRC STUDY ON PRESSURE LOCKING &
. Tom (301)
THERMAL BINDING OF GATE VALVES EMEB Scarbrough 504-2794
{
GL VERIFICATION OF PLANT RECORDS NRR DRCH Vern Hodge (301) 3 '
HOLB 504-1861 j
GL RESOLUTION OF GSI 106 PIPING & USE OF-RES Vern Hodge (301)
COMBUSTIBLE GASES IN VITAL AREA 504-1861 IN [IN 93-52, 7/14/93] DRAFT NUREG-1477, NRR DSSA Bill Long (301)
" VOLTAGE BASED INTERIM PLUGGING SCSB 504-3026 CRITERIA FOR STEAM GENERATOR TUBES" j
I GL RVW GUIDANCE ON TEMP CORRECTIVE NRR DE Don (301)
MEASURES FOR MEDIUM ENERGY ASME-3 EMEB Kirkpatrick 504-1849 i
PIPE IN TEMPER EMBRITTLEMENT OF BYRON JACKSON NRR DE J Davis (301)
PUMP COUPLINGS EMCB 504-2713 IN DUAL UNIT REACTOR TRIP DURING REGION II G MacDonald (404)
I SWITCHYARD BREAKER TESTING 331-5576 j
IN TESTING OF BACKUP EMERGENCY RESPONSE NRR DRSS Edwin Fox (301) l FACILITIES PEPB 504-2908 l
[
IN DEGRADATION OF SR SYSTEMS DURING REGION II P Kim (704) f VALVE STROKE SURVEILLANCE TESTING VanDoorn 875-1681 l
t AL [AL 93-01, 7/9/93] ANNOUNCING A NEW NRR DORS Dick (301) l TYPE OF NRC GENERIC COMMUNICATION OGCB Kiessel 504-2840 IN [IN 92-06 SUP 1, 7/1/93] IMPROPER NRR DORS Eric Benner (301) f INTEGRATION OF SOFTWARE INTO OEAB 504-1171
.j 4
OPERATING PRACTICES i
f t
IN [IN 93-58, 7/26/93] NONCONSERVATISMS NRR DORS Tom Koshy-(301)
-f IN LOW-TEMPERATURE OVER PRESSURE OEAB 504-1176 PROTECTION FOR PRESSURIZED-WATER i
REACTORS l
IN [IN 93-48, 7/6/93] FAILURE OF NRR DORS Tom Greene (301)
TURBINE-DRIVEN MAIN FEEDWATER PUMP TO OEAB 504-1175 TRIP BECAUSE OF CONTAMINATED OIL IN THERMAL STRATIFICATION IN BWR REACTOR NRR DORS Jerry (301)
VESSEL OEAB Carter 504-1153-
[
IN IN SUP: FALSIFICATION OF PLANT NRR DORS Tom Greene (301) f RECORDS OEAB 504-1175
}
L
_~
Page No.
4 l
07/30/93 PROPOSED GENERIC COMMUNICATIONS I
IN PREPARATION WITHIN THE NRC j
TP SUBJECT SOURCE CONTACT PHONE NO I
GL USE OF THERMOLAG 331 FIRE-SYSTEM NRR DSSA Dick (301)
SPLB Kiessel 504-2840 i
IN [IN 93-59, 7/26/93] UNEXPECTED NRR DORS Jerry (301)
OPENING OF BOTH DOORS IN AN AIRLOCK OEAB Carter 504-1173 r
TI INSPECTION OF IMPLEMENTATION OF NRR DE Amar Pal (301) t STATION-BLACKOUT RULE EELB 504-2760 IN POTENTIAL BREACH OF PRIMARY NRR DORS Tom Greene (301)
CONTAINMENT OEAB 504-1175 IN TURBINE OVERSPEED AND RCS COOLDOWN NRR DORS Eric Benner (301) l DUE TO RELATCHING OF MAIN TURBINE OEAB 504-1171 1
IN [IN 93-49, 7/8/93) IMPROPER NRR DORS Eric Benner (301)
[
INTEGRATION OF SOFTWARE INTO OEAB 504-1171 OPERATING PRACTICES j
GL THERMAL GROWTH AND STRUCTURAL DESIGN NRR DE Vern Hodge (301)
ECGB 504-1861 IN [IN 93-56, 7/22/93) WEAKNESS IN REGION V Dennis (510)
[
EMERGENCY OPERATING PROCEDURES FOUND Kirsch 975-0290 i
AS A RESULT OF STEAM GENERATOR TUBE RUPTURE IN TIME DELAYS NOT INCLUDED IN TS TIME REGION IV Bill (817)
RESPONSE LIMITS
' Johnson 860-8148 IN FIRE EVENT AT CHERNOBYL PLANT NRR DORS Eric Benner (301)
OEAB 504-1171 l
1 IN [IN 93-51, 7/9/93) REPETITIVE REGION IV Peter Wen (301)
OVERSPEED TRIPPING OF TURBINE-DRIVEN 504-2832 AUXILIARY FEEDWATER PUMPS IN POTENTIAL CHARGING PUMP MALFUNCTIONS NRR DSSA Don (301) l SRXB Kirkpatrick 504-1849 IN PROBLEMS WITH SWITCHOVER TO HOTLEG NRR Nancy (301)
INJECTION AFTER A LOCA Campbell 504-2836 IN 1E BUS AND LOAD VULNERABILITY TO NRR DE C Morris (301)
UNEXPECTED BUS TRANSFER EELB 504-2776 j
IN CERTIFYING OFFICIALS ON NRC FORM 313, NMSS IMNS Scott W (301)
" APPLICATION FOR MATERIAL LICENSE" IMOB Moore 504-2514
)
1
~
Page No.
5 07/30/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO I
IN UNDERVOLTAGE RELAY SETTINGS NRR DSSA Nancy (301)
EELB Campbell 504-2836 IN SHUTDOWN EVENTS, RCS CONFIGURATION NRR DORS Eric Benner (301)
CONTROL OEAB 504-1171 IN MELTED INSULATION ON RELAYS AT ST NRR DORS Tom Koshy (301)
LUCIE OEAB 504-1176 IN MISAPPLICATION OF FUSES IN SAFETY NRR DORS Nick Fields (301)
RELATED SYSTEMS (STP)
OEAB 504-1173 1
1 IN MATERIAL CONTROL NRR DORS Eric Benner (301)
OEAB 504-1171 l
GL LOW-TEMPERATURE OVER PRESSSURE NRR Tony Gody (301)
SETPOINT METHODOLOGY PDIII-3 Jr 504-1387 IN POTENTIAL FAILURE OF LONG-TERM N2 NRR DSSA David Shum 1301)
SUPPLY FOR ADS AT FITZPATRICK SPLB f]4-2860 IN COMMON DEPENDENCIES IN CCW SYSTEMS REGION II JL (401)
Shackelford 331-0338 IN [IN 93-53, 7/20/93] EFFECT OF REGION II Marc Harper (301)
HURRICANE ANDREW ON TURKEY POINT 504-2915 NUCLEAR GENERATING STATION AND l
LESSONS LEARNED IN QUAD CITIES HPCI RUPTURE DISC FAILURE NRR DORS Peter Wen (301)
OEAB 504-2832 IN POTENTIAL PROBLEMS WITH FIRE BARRIER REGION I Dick (301)
PENETRATIONS Kiessel 504-2840 IN [NEW) IMPROPER USAGE OF SOLUBLE WELD REGION II Marc Harper (301)
DAM MATERIAL 504-2915 IN (NEW) INADEQUACIES IN PREDICTION OF REGION II Tom Koshy (301)
TORQUE REQUIREMENTS FOR BUTTERFLY 504-1176 VALVE OPERATORS IN [NEW] OBSERVATIONS ON SHUTDOWN RISK NRR DRIL J D Wilcox (301)
AND OUTAGE MGT RSIB 504-1262 IN [IN 93-54, 7/20/93] MOTOR-OPERATED REGION II Francis (301)
VALVE ACTUATOR THRUST VARIATIONS Jape 504-5607 j
MEASURED WITH A TORQUE THRUST CELL AND A STRAIN GUAGE MONITOR
r Page No.
6 07/30/93
}
PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO i
IN [NEW) CRIMINAL PROSECUTION OF NUCLEAR NRR DRIL Steve (301) l SUPPLIER FOR WRONGDOING RVIB Alexander 504-2995 IN [NEW) POTENTIAL ERRORS IN AIR FLOW NRR DRIL Steve (301)
INSTRUMENTS MANUFACTURED BY FLUID RVIB Alexander 504-2995 COMPONENTS INC THAT WERE NOT DETECTED BY LICENSEE AUDITS IN [NEW) DEGRADATION OF MEDIUM VOLTAGE REGION V Bill Ang (510)
CABLE IN UNDERGROUND APPLICATIONS 975-0310
.[
IN [NEW] FAILURE OF WILCO FIRE HOSE NRR DRIL W Orders (803) l NOZZLES RVIB 383-4571 IN [NEW) DEGRADATION OF OFFSITE POWER REGION II R Schin (404)
SOURCE FROM SALT BUILDUP ON 331-5561 INSULATORS IN [NEW) LOSS OF SHUTDOWN COOLING FROM NRR DORS Tom Koshy (301)
UNRELIABLE LEVEL MONITORING OEAB 504-1176 GL [NEW] VOLUNTARY REPORTING OF RES C Raddatz (301)
ADDITIONAL RADIATION EXPOSURE DATA 504-1717 IN [NEW) CORE SUPPORT SHROUD CRACKS NRR DORS Tom Greene (301)
OEAB 504-1175 vn
~
,--e e-.
--,,