Text
e de, hat Ale.
l.
3"
~
UNITED STATES o
E O,
.E NUCLEAR REGULATORY COMMISSION l
WASHINGTON. D.C. 20555
- o 1
% * * +' /
July 8,1993 i
Project No. 672 i
Mr. Peter M. Williams, Director l
HGTR Division 1
Office of Advanced Reactor Programs U.S. Department of Energy Washington, D.C.
20585
Dear Mr. Williams:
SUBJECT:
REVIEW REQUESTED OF NRC CONTRACTOR DOCUMENT POSSIBLY CONTAINING APPLIED TECHNOLOGY MATERIAL ON THE MODULAR HIGH-TEMPERATURE GAS-COOLED REACTOR (MHTGR) DESIGN Enclosed is Technical Evaluation Report (TER) 2-2-93, " Evaluation of Computer Codes Used to Calculate MHTGR Accidents Dose Consequences" on the General Atomics codes used to evaluate the radiological consequences of accidents for the MHTGR design. This document was developed for the Nuclear Regulatory 1
i Comission (NRC) by a contractor.
We are preparing to issue this document to the public and the NRC service list i
I for the MHTGR design for comments; however, the contractor relied on informa-tion submitted by the Department of Energy (DOE) and classified " Applied Technology " The Applied Technology label states that " distribution by any l
holder of this Document or of Other Data Herein to Third Parties Representing foreign Interests... Shall be Approved by" DOE.
Because public access to this document may include foreign interests, we request that you have this document reviewed to determine if there is any " Applied Technology" informa-tion on the MHTGR design which should not be provided to the public. The request for such a review of any NRC document was discussed and agreed to in l
the meeting of July I,1993, between NRC and DOE. The summary for this meeting will be issued by NRC in the near future.
To meet our schedule to complete the final Preapplication Safety Evaluation Report (PSER) for the MHTGR design, you are requested to review this document and provide comments concerning the " Applied Technology" information in the document within two weeks of receipt of this letter. We also request that you provide these comments by letter listing the specific sentences and paragraphs in the document that should not be provided to the public. This is not a request for your review of the technical merits and conclusions of the report.
You will be provided an opportunity at a later date to provide such comments I
when we issue the document to the public.
This document is only being provided to you at this time and will not be sent y g to the NRC public document room as part of this letter.
jp
}
d ru n o 3m m:
up5
-/ y,), g,,
\\
IVtl 6 H.L Diu beLi; uL h 9309020019 930708 k f f y.>,.y J' c:.,9 )
l PDR PROJ
/
j 672A PDR
Mr. Peter M. Williams July 8,1993 i
This reporting requirement affects nine or fewer respondents and, therefore, is not subject to Office of Management and Budget review under P.L.96-511.
If you have any questions regarding this request, please contact me at (301) 504-3128.
Sincerely,
(
Jack N. Donohew, ject Manager Advanced Reacters Project Directorate Associate Dir..ctorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
Enclosure:
TER 2-2-93 cc w/o enclosure:
See next page Distribution: (all without the enclosure)
Central File' PDR PDAR R/F MHTGR R/F DMCrutchfield RCPierson EThrom JNDonohew OGC 15/B/18 ACRS (10)
P315 LShotkin NLN353 FEltawila NLN344 EChR OFC PM:PDAFL LA:PDST SC:PDAR_
/
PD:
NAME JDonohek\\'bt PSheaOd EThrom pYv(
RPihygon DATE 07/ 7 /93 07/9/h3 07/ 7 /93 07/h/h3 051CIALRECORDCOPY OfCUMFN~ NAME: APPTECH.JND
Mr. Peter M. Williams July 8,1993 MHTGR Project No.672 l
cc: Jerry D. Griffith, Director Dave A. Dilling Office of Advanced Reactor Programs Bechtel National, Inc.
U.S. Department of Energ;, NE-45 50 Beale Street Washington, D.C.
20545 P.O. Box 193965 San Francisco, California 94119 Sterling Franks Technical Director Office of MHTGR Walter J. Parker
~
New Production Reactor Program Stone and Webster Engineering U.S. Department of Energy, NP-61 Corporation Washington, D.C.
20545 245 Summer Street Boston, Massachusetts 02107 l
J. David Nulton, Associate Deputy i
Assistant Secretary for Reactor Sten Caspersson
]
Systems, Development, and Technology Combustion Engineering i
U.S. Department of Energy, NE-40 100 Prospect Hill Road Washington, D.C.
20545 Windsor, Connecticut 06095 Salma El-Safwany Henry Jones U.S. Department of Energy Oak Ridge National Laboratory 1
Nuclear Energy Division P.O. Box 2009 1333 Broadway Building 9102-1, Mail Stop 8030 j
Oakland, California 94612 Oak Ridge, Tennessee 37831-8030 j
i Dr. Daniel L. Mears Steve Goldberg Gas-Cooled Reactor Associates Budget Examiner 10240 Sorrento Valley Road, Suite 300 Office of Management and Budget San Diego, California 92121-1605 725 17th Street, NW Washington, D.C.
20503 Lloyd Walker Modular HTGR Plant Design Dr. Lee S. R hroeder Control Office - West Assistant D wector for Physical P.O. Box 85608 Sciences and Engineering San Diego, California 92186-9784 Office of Scicnce and Technology l
OE0B Ray R. Mills Washington, D.C.
20503 Modular HTGR Plant Design Control Office - East Peter M. Williams, Director 3226 Tower Oaks Boulevard HTGR Division Suite 300 Office of Advanced Reactor Programs Rockville, Maryland 20852 U.S. Department of Energy, NE-451 Wathington, DC 20585 George C. Bramblett, Director MHTGR-NE Project Division General Atomics P.O. Box 85608 San Diego, California 92186-9784 i
i
-