Text
-
t RADIA* DON CENTT.R Ontcos ST4rt Usivi:nsiry RadiatWn Certer A100 Corvalls, Oregon 97331 5903
~felephone503 737 2341 l'an 503 *W 04b0 August 27, 1993 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Oregor. State University TRIGA Reactor (OSTR),
Docket No. 50-243, License No. R-106
Subject:
10 CFR 50.54(q) Report of Changes to the OSTR Emergency Response Plan Which Do Not Decrease the Effectiveness of the Plan Gentlemen:
l As a result of our annual review of the OSTR Emergency Response Plan, certain changes to the plan were determined to be necessary.
(See Attachment A.) This letter represents our formal report of the cnanges in accordance with 10 CFR 50.54(q).
Based on our evaluation of the revisions, which was conducted under the provisions of 10 CFR 50.59, we have concluded that none of the changes reduce the plan's emergency response effectiveness. A copy of this evaluation is enclosed.
All of the changes to the plan, and the 10 CFR 50.59 evaluation j
supporting the changes have been reviewed and approved by the OSTR Reactor j
Operations Committee. As you can see from information provided in the evaluation and itemized in Attachment A, all of the changes involve typographical corrections or other relatively minor modifications necessary to keep the plan current.
In addition to the plan itself, a number of conforming changes were made to the Emergency Response Plan Implementing Procedures (ERIPs) in order to keep them up to date.
To make it easy to update your copy (s) of the plan, Attachment B includes all of the current replacement pages for the plan.
If you have any concerns or questions about the reported changes to the OSTR Emergency Response Plan, please let me know.
Yours sincerely, bl y
- n A. Gi J
nson l
Direeg cc: See Page 2
- dl0D0, p
9309010191 930827 I
PDR ADOCK 05000243 h
F ppg gg 1
b cc:
Mr. Al Adams, Project Manager, Non-Power Reactor, Decommissioning, and Environmental Projects Directorate, U.S. Nuclear Regulatory Commission, M.S. 0WFN ll-B-20, Washington D. C. 20555 Regional Administrator, USNRC, Region V Mr. Lawrence Cohen, USNRC, Emergency Preparedness Branch, Washington, D.C. 20555 Oregon Department of Energy, Salem, Oregon ATTN: Mr. David Stewart-Smith i
Prof. S. E. Binney, Chairman, Reactor Operations Committee l
Prof. B. Dodd, Reactor Administrator
)
l Prof. J. F. Higginbotham, Senior Health Physicist i
l i
l l
a l
Rev.11/90 OSU TRIGA Reactor (OSTR)
Changes, Tests and Experiments Evaluated Under the Provisions of 10 CFR 50.59 NUMBER:
93-2 DATE:
August 4,1993 TITLE:
Revisions to the Radiation Center and OSTR Emergency Response Plan DESCRIPTION As a result of the annual review of the Radiation Center and OSTR Emergency Response Plan, and also as a result of the annual emergency response drill, a number l
of changes are needed to the plan and its implementing procedures. The details of these changes are given in Attachment A; however, the changes can be grouped into several areas.
I First, the closure of the Trojan Nuclear Power Plant has necessitated the deletion of all references throughout the plan and procedures to Portland General Electric (PGE) and the potential use of their whole body monitor at Trojan. Second, a reorganization of the university's administrative structure has required changes in the titles of certain positions, and a change in the organizational diagram. Third, one of the OSTR Senior Reactor Operators (who is also the Chairman of the Reactor Operations Committee) has decided not to renew his license when it expires in 1994. This has required a change in the title given to the second person in the line of succession for the Emergency Director and the Public Information Officer from Senior Reactor Operator to Chairman of the Reactor Operations Committee.
Other revisions involve updates on the Area Radiation Monitors (ARMS), changes in the allowed emergency exposure limits, the addition of new decontamination f acilities at the Good Samaritan Hospital, as well as corrections of typographical or minor grammatical errors.
-. -.. w
4 SAFETY EVALUATION I
The removal of PGE from the emergency response plan and implementing procedures l
is being made because there is no choice. The Trojan facility is closing down and j
whole body counting will no longer be available there. The inclusion of this capability l
in the OSTR Emergency Response Plan has always been regarded as a bonus rather
=
than a necessary part of the plan because it is very unlikely that an incident requiring such moritoring will occur. There are many whole body monitors now available l
i around the country and several commercial companies that can perform this service on fairly short notice. For these reasons, the removal of the PGE assistance is not i
3 regarded as a reduction in the effectiveness of the plan.
The reorganization of the university's administrative structure is the subject of a request to change the OSTR Technical Specifications submitted to the USNRC on July 7,1993 and, therefore, need not be addressed further here. The emergency plan changes ensure conformity to the proposed changes in the Technical Specifications.
i 3
The change in the title of the person second in the line of succession for the Emergency Director and Public information Officer does not have any negative safety implications, because while the title will change, the person filling the position will not. The Senior Reactor Operator and the Chairman of the Reactor Operations l
Committee are one and the same.
Furthermore, anyone qualified to serve as Chair. man of the Reactor Operations Committee will be qualified to fill these positions l
in the emergency response plan.
i 1
The changes to the ARMS have been addressed in the 10 CFR 50.59 Safety Analysis i
numbered 92-9 arid, therefore, the conforming changes to the emergency plan need not be evaluated further here.
Revisions to EPA guidance on allowable emergency doses for various situations l
l prompted the reduction of the lifesaving dose from 75 rem to 25 rem and the non-lifesaving dose from 25 rem to 10 rem. Clearly, these reductions follow federal l
guidance and result in a potential cancer risk decrease and an overall increase in safety.
l 1
l Good Samaritan Hospital (GSH) has purchased a portable decontamination table and a portable shower. This provides more flexibility as to where injured, contaminated
{
4 patients will be initially treated. The GSH Standard Operating Procedure relating to 1
d such emergencies has been revised and the changes to the OSTR Emergency Response Plan make allowance for use of these facilities. This change increases the l
effectiveness of the plan by providing flexibility to cope with a greater variety of l
situations.
Typographical and grammatical changes increase the plan ef fectiveness by making it more accurate and easier to read.
4
The changes described above were reviewed and approved by the Reactor Operations Committee (ROC) prior to being implemented. ROC approvalincluded a review of this evaluation and the Committee's conclusion that the changes do not require a change in the OSTR Technical Specifications (except as already applied for) and do not constitute an unreviewed safety question as defined in 10 CFR 50.59(a)(2) (see over).
L This evaluation also included a review of applicable radiation protec* ion aspects and was found to be consistent with the Radiation Center's commitment to ALARA.
CONFORMING PROCEDURAL CHANGES The above emergency plan revisions require several changes to the ERIPs. These changes are also included in Attachment A. In addition, a few other modifications to the ERIPs have been made to bring them up to date, to make them clearer, or to make them more effective. ERIP changes do not require a formal 10 CFR 50.59 safety analysis.
APPROVALS The following signatures indicate review and approval by the Reactor Operations Committee and review by licensed operators.
If any ROC member does not completely concur with or understand the proposed change / test / experiment then that member should hold this form unsigned and notify the ROC Chairman. The matter will then be discussed at the next meeting of the Committee. If any individual ROC member is unable to sign the sheet due to absence or illness this will be so noted.
S. E. Binney * +
A. G. Johnson
- h D. L. Amort' J. C. Ringle*
Chna k
s 1
T. V. Anderson * +
A. H. Robinson
- N 4
B. Dodd * +
\\b R. A. Schmitt'
/
^
.n
.A. D. Hall +
[ W. H. Warnes*
- C~,
mO y
J. F. Higginbotham* +
h
- Chairman, Reactor Ope /
iv rations Committee (Signs Last)
- Member, Reactor Operations Committee
+ Licensed Operator
7 I
. i f
Extracted from 10 CFR 50.59 (a) (2) i A proposed change, test or experiment shall be deemed to -involve an unreviewed safety question:
l (i) if the probability of occurrence or the consequence of an accident or l
malfunction of equipment important to safety previously evaluated in the safety 3
analysis report may be increased; or (ii) if a possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or r
(iii) if the margin of safety as defined in the basis for any technical specification is reduced.
I t
i t
i
- i
- I i
l I
I i
,.,...w-
i Attachment A:
Revisions to the OSU Radiation Center and TRIGA Reactor Emergency Response Plan - August 1993 l
Cover Page Change the last revision date to " August 1993".
All Changed Pages t
Add or change the revision date to "8/93".
Page 3-1, Section 3.1 Change the last paragraph to read:
To ensure a clear understanding of the emergency support responsibilities of key support organizations, written support agreements have been obtained from the City of Corvallis Police and Fire Departments, and the Good Samaritan Hospital.
Page 3-4 j
Delete the paragraph headed " Portland General Electric Company (PGE)".
Page 3-6 l
Change the second box in the line of succession for the Emergency Director from l
" Senior Reactor Operator" to " Chairman of the Reactor Operations Committee",
j and delete the footnote at the bottom of the page.
l Page 3-10, Public Information Officer Change " Assistant V.P. for University Relations" to " Director, University Relations" in both the text and the first line of succession box.
Change the second box in the line of succession for the Public Information Officer from " Senior Reactor Operator" to " Chairman of the Reactor Operations
. Committee" and delete the footnote at the bottom of the page.
Page 3-13 Revise Figure 3.1 to conform to the new university organization structure.
Page 3-14 Revise Figure 3.2 to remove the Portland General Electric box.
l l
i t
Page 7-2, Area Radiation Monitor Alarm and Pages 7-12, 7-13, High Radiation Levels at the Site Boundary
]
i Change " currently 14 continuous" to "several". Revise the last sentence to read:
j "All of these ARMS may be read in the reactor control room and most of them may also be read near the remote detector location. In addition, the ARM outside the j
control room can be read in A100."
Page 7-16, Section 7.4.1 I
r Page 7-16, Section 7.4.2 Change "25 rem" to "10 rem".
i Page 7-16, Section 7.5 b) l Change "by NRC Regulatory Guide 1.86" to "in current regulatory guidance.
{
J Page 8-1, Section 8.1 a)
Add to the last sentence: "and the dose rate measured by the ARM outside of the control room can be read there."
Page 8-2, Section 8.2.1 a) iv)
Correct the typographical error to read: "(BF detectors and rem meters)."
3 Page 8-6, Section 8.3.2 e) i Correct the typographical error in the word "necessary".
Page 8-8, Section 8.3.5 a) lii)
Add the following sentence to the end of the paragraph. "As an alternative, the portable decontamination table or the portable decontamination shower may be set up outside of the Emergency Department."
Page 8-8, Section 8.3.5 a) iv)
Replace the word " room" with " area".
Page 8-9, Section 8.4 a) iv)
Correct the typographical error in the spelling of the word " Radiation".
i
L L
i
-)
i Page A-3
- f't Update Figure A.2 i
Page A-4
~!
Update Figure A.3 t
i
-l a
i l
l t
i I
t 4
i
?
i r
7 e
d
.o 6
3 h
I 8
i t
o
~i 1
d t
i l
9 9
f
b i
Revisions to the OSU Radiation Center and TRIGA Reactor Emergency Response l
Plan Implementing Procedures (ERIPs)- August 1993 i
Cover Page Change the last revision date to " August 1993".
l i
All Changed ERIPs l
i Cover Pages l
Increase the revision numbers by one and change the latest revision dates to "8/93".
L All changed pages Add or change the revision date on the page to 8/93.
i i
r ERIPs 0,1 and 2 i
Pages H-0-15, H-1-17 and H-2-12 Add the following duty:
"2.
Check with the Senior Health Physicist for the appropriate location to observe the incident.
r ERIP 0 Page E-0-2 Delete PGE from the diagram.
Page EC-0-5 Delete 3 c) relabel d) and e) to c) and d) respectively.
i Page SHP-0-7 Change the last phrase of 1. a) to from "any radiation field" to "the radiation field of concern".
i 4
I a
a
4 Page SHP-0-8 Delete the last phrase of tre 'ast sentence so that the sentence now reads: "If deemed necessary, arrange for in vivo (whole body) counting.
i Pages SHP-0-10 and SHP 0-11 Delete the last phrase of 7. so that the sentence now reads: "If deemed necessary, arrange for in vivo (whole body) counting."
ERIP 1 Page EC-1-8 Delete the phrase "and the Public Information Officer" from 5.
.l t
i Page SHP-1-11 l
Delete the last phrase of 8. so that the sentence now reads: "If deemed necessary, arrange for in vivo (whole body) counting."
\\
Page SHP-1-13 i
Delete the last phrase of 7. so that the sentence now reads: "If deemed necessary, arrange for in vivo (whole body) counting."
i ERIP 2 Page SHP-2-7 Delete the last phrase of 7. so that the sentence now reads: "If deemed necessary, j
arrange for in vivo (whole body) counting."
I i
ERIP 4 i
Page E-4-1 i
Update telephone numbers.
[
[
I t
ERIP 5 hppendix A l
Revise the last bullet and add a new penultimate bullet, so that the last two bullets now read:
IF POTENTIALLY CONTAMINATED STAND IN AN ISOLATED LOCATION.
AWAIT FURTHER INSTRUCTIONS."
ERIP 7 Page E-7-3 Update the call list with current phone numbers.
Page E-7-4 i
Update this page with the current Radiation Center Directory.
Page E-7-5 Delete the Portland General Electric phone numbers, insert the Oregon area code (503) on all Oregon long distance calls.
Page E-7-6 Add E. G. Torne and M. J. Streck to the Radiological Assessment Team. Replace J. F. Hopkins with C. L. Phillips.
I i
Page E-7-7 Revise the headings of the table for Agency Notified to "NRC-V, NRC-EOC, ODOE, and ANI".
ERIP 8 Page E-8-2 Under " Step Number One" change " Senior Reactor Operator" to " Chairman of the Reactor Operations Committee",
i 1
I i
Page E-8-5
~
t'l Replace "Betsy Krause" with " Ellen Saunders" and replace "752-6726" with "745-
.i 1062". Update Dr. Higginbotham's home phone number to 745-3958..
s 5
i t
I
)
i i
I
- t
'h 4
1 1
h 1
i
[
5
'h e
I f
i
.l i
Attachment A:
Revisions to the OSU Radiation Center and TRIGA Reactor Emergency Response Plan - August 1993 l
i Cover Page Change the last revision date to " August 1993".
j All Changed Pages Add or change the revision date to "8/93".
Page 3-1, Section 3.1 Change the last paragraph to read:
f To ensure a clear understanding of the emergency support responsibilities of key j
support organizations, written support agreements have been obtained from the
^
City of Corvallis Police and Fire Departments, and the Good Samaritan Hospital.
j Page 3-4 l
Delete the paragraph headed " Portland General Electric Company (PGE)"
Page 3-6 Change the second box in the line of succession for the Emergency Director from
" Senior Reactor Operator" to " Chairman of the Reactor Operations Committee",
and delete the footnote at the bottom of the page.
Page 3-10, Public Information Officer Change " Assistant V.P. for University Relations" to " Director, University Relations" in both the text and the first line of succession box.
Change the second box in the line of succession for the Public Information Officer from " Senior Reactor Operator" to " Chairman of the ' Reactor Operations Committee" and delete the footnote at the bottom of the page.
Page 3-13 1
i Revise Figure 3.1 to conform to the new university organization structure.
Page 3-14 i
Revise Figure 3.2 to remove the Portland General Electric box.
i
Page 7-2, Area Radiation Monitor Alarm and Pages 7-12,7-13, High Radiation Levels at the Site Boundary J
1 Change " currently 14 continuous" to "several". Revise the last sentence to read.
"All of these ARMS may be read in the reactor control room and most of them may l
~
also be read near the remote detector location. -In addition, the ARM outside the control room can be read in A100."
Page 7-16, Section 7.4.1 f
I i
Page 7-16, Section 7.4.2 Change "25 rem" to "10 rem".
l t
Page 7-16, Section 7.5 b) j i
Change "by NRC Regulatory Guide 186" to "in current regulatory guidance".
Page 8-1, Section 8.1 a)
Add to the last sentence: "and the dose rate measured by the ARM outside of the control room can be read there."
l l
Page 8-2, Section 8.2.1 a) iv)
Correct the typographical error to read: "(BF detectors and rem meters)."
3 Page 8-6, Section 8.3.2 e)
{
Correct the typographical error in the word "necessary".
l Page 8-8, Section 8.3.5 a) iii) a
]
Add the following sentence to the end of the paragraph. "As an alternative, the portable decontamination table or the portable decontamination shower may be set l
up outside of the Emergency Department."
Page 8-8, Section 8.3.5 a) iv)
]
Replace the word " room" with " area".
Page 8-9, Section 8.4 a) iv)
.)
y Correct the typographical error in the spelling of the word " Radiation".
i
~
~
I l
f 4
i l
e-j Page A-3 i
4 l.'
Update Figure A.2 t
a j
Page A-4 l
1 1
i Update Figure A.3 l
t e
E l
I E
t
.f f
j
- ?
i l'
(
l k
I I
i j
'e e
- f 1
i e
(
3 1
i.
a 4
I e
1 o
)
- i
. t
. 4 i
I tt I
t 4
3 4
i I
r i
d I
l' i
4 6
6 I
}
a i
.I 1
l i
I l
I
!c
{'-
8 i
- l 1
1~
-i l-t I..-.
., _ _, =. - -.. -. - - - -,.. -... -
f i
Attachment B i
OSTR Emergency Response Plan i
i Replacement Dages 3
a J
\\
i i
J k
4 4
1 4
1 i