Informs of Plans for Expanding on-site Spent Fuel Storage Capacity at Plant & Util Recently Contracted W/Pacific Nuclear to Provide Certified NUHOMS Dry Fuel Storage Modules for Use,Per 10CFR72
ML20056F826
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/25/1993
From: Storz L
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2169, NUDOCS 9308310168
Download: ML20056F826 (2)


Text

+

CENTERIOR ENERGY 300 Madsor Avenue Lours E storz Toeda OH 43652-0001 Vice Presadem-Naciect 4!9 2G2300 Does Eesse r

Docket Number 50-346 License Number NPP-3 Serial Number 2169 L

August 25, 1993 P

United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C.

20555

Subject:

Spent Fuel Storage Plans for the Davis-Besse Nuclear Power Station Gentlemen:

The purpose of this letter is to inform the NRC staff of Toledo Edison's plans for expanding on-site spent fuel storage capacity at the Davis-Besse Nuclear Power Station (DENPS).

As of the end of the recently completed eighth refueling outage, four hundred and fifty-six fuel assemblies are stored in the DBNPS spent fuel pool, which has a licensed capacity of 735 fuel assemblies. The ability to completely offload the reactor core into the spent fuel pool vill be' lost during the tenth refueling outage vhich is planned for early 1996.

Toledo Edison believes that it is prudent to maintain complete core offload capability in the spent fuel pool beyond the tenth refueling outage.

Toledo Edison has recently contracted with Pacific Nuclear to provide certified NUHOMS dry fuel storage modules for use at the DENPS under the 10CFR72 Subpart K General License for Storage of Spent Fuel at Power Reactor Sites. Toledo Edison understands that the NRC staff review of Pacific Nuclear's application for 10CFR72 Subpart L certification of the NUHOMS system is nearing completion.

t NUHOMS modules vill be added as needed to maintain complete core offload capability in the spent fuel pool at the DBNPS. Toledo Edison f'

is planning to load the first two NUHOMS modules as early as mid 1995.

Toledo Edison expects that the NRC vill complete certification of the NUHOMS system on a schedule which vill permit fabrication of NUHOMS

,cj components for loading of the first two modules in mid 1995. Toledo Edison understands that your staff and Pacific Nuclear have discussed

,q the fabrication schedule based on prompt completion of the remaining l

(3 NUHOMS certification activities.

f(g) ) { l

().

o ommma compames-9308310168 930825 I+

v cwetanc tieene menemg PDR ADOCK 05000346 4, bodo Eir.on PDR D,4 p

5

-.,.. = - -

t Docket Number 50-346 j

License Number NPF-3 Serial Number 2169-Page 2 Should you have any questions regarding this letter, please contact Mr. William T. O'Connor, Manager - Regulatory Affairs, at j

(413) 249-2366.

Very tinly yours, j

m v'

i N#

O PVS/dle C. J. Haughney,' Branch Chief, NRC Storage and Transportation i

l cc:

Systems Branch J. B. Hopkins, NRC Senior Project Manager J. B. Martin, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior Resident Inspector j

Utility Radiological Safety Board I

i

[

l

-f i

i 5

t l

' l

' l l

t i

i l

t l

w

W

---r

--9 e

+w.

.y y

%,s

-.U-

. g