ML20056F806

From kanterella
Jump to navigation Jump to search
Forwards Semiannual Monitoring Rept,Jan-June 1993 for Pbnp, Units 1 & 2. Rept Contains Info Re Plant Releases,Solid Waste Shipments,New & Spent Fuel Shipments,Environ Monitoring,Cws Operations & Leak Testing of Sources
ML20056F806
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/26/1993
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20056F807 List:
References
CON-NRC-93-094, CON-NRC-93-94 VPNPD-93-147, NUDOCS 9308310124
Download: ML20056F806 (1)


Text

j e

l Wisconsin c

1 Elecinc i

' POWER COMPANY t

231 w uchoort Po em 2az. w.ojee, va 532rA Mu) 22o2345 f

VPNPD 14 7 NRC 094 August 26, 1993 l

1 i

Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 l

Washington, DC 20555 l

Gentlemen:

i DOCKETS 50-266 AND 50-301

}

SEMIANNUAL MONITORING REPORT I

POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Enclosed is the Semiannual Monitoring Report for Point Beach Nuclear Plant, Units 1 and 2, for the period January 1,

1993,

'l through June 30, 1993.. This report is submitted in accordance

.I with Technical Specification 15.7.8.4A and contains information regarding plant releases, solid waste shipments, new and spent.

fuel shipments, environmental monitoring, circulating water system operations, leak testing of sources, and other miscellaneous

{

reportable items from this reporting period.

Three copies of

~

this report are provided for your convenience.

j l

Sincerely,

{

s Bob Link Vice President Nuclear Power DAW /$g i

Enclosures i

cc:

NRC Resident Inspector NFC Regional Administrator.

l I

't i

9308310124 930826 f

l PDR ADOCK'05000266 G

. T.

R pog y

p.

-l i

Asubs&ryafHhwnsinDem Ge;watkw.

I i