ML20056F361

From kanterella
Jump to navigation Jump to search
Forwards TS Change Request 231 to License DPR-50,adopting Provision of STS Which Allows Period of 24 H to Complete SR Upon Discovery That Surveillance Missed
ML20056F361
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/24/1993
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20056F362 List:
References
RTR-NUREG-1430 C311-93-2110, NUDOCS 9308270035
Download: ML20056F361 (1)


Text

'

i GPU Nuclear Corporation G s luclear m'n s

  • r

)

Middletown, Pennsylvania 17057-0480 (717)944-7621 s

]

Writer's Direct Dial Number:

]

(717) 948-8005 l

August 24, 1993 l

C311-93-2110 4

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 I

Dear Sir:

i t

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50, Docket No. 50-289 Technical Specification Change Request No. 231 1

In accordance with 10 CFR 50.4 (b) (1), enclosed is Technical Specification Change Request No. 231.

4 Also enclosed is one signed copy of the Certificate of Service for this request which confirms service to the chief executives of the township and county in which the facility is located, as well as the Commonwealth of 4

)

Pennsylvania, Bureau of Radiation Protection.

The proposed amendment adopts the provision of the Standard Technical Specifications (STS) which allows a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to complete a surveillance requirement upon discovery that the surveillance has been missed.

The basis for the delay period includes, among other considerations, the safety significance of the delay in completing the required surveillance and the recognition that the most probable result of any particular surveillance 1

being performed is the successful verification of conformance with the requirements.

j p2 Sincerely, i

M o.

e@$

T. G. Brough n

@g@n-Vice President and Director, THI-I g

MRK/ emf

. oo

Enclosures:

1) Technical Specification Change Request No. 231 ucau
2) Certificate of Service for Technical Specification Change 80 Request No. 231 y<

~ co cc:

Region I Administrator 0[

85 TMI-l Senior Project Manager 5

0' "

TMI Senior Resident Inspector q

{y [J U,

GPU Nuclear Corporaton is a subsidiary of General Pubhc Utihties Corporaton

\\.