MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217H6341999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for Kh Curran,Lm Gerlach,Rc Weber & Bt Rhodes Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC Form 396 Encl.Proprietary Info Withheld ML20217H6251999-10-15015 October 1999 Requests Renewal of Operator Licenses for Listed Personnel. Current Licenses for MR Kahn,Aj Mclaughlin,De Montgomery & Kr Murphy Will Expire in Nov 1999.Proprietary NRC Form 398 & NRC from 396 Encl.Proprietary Info Withheld ML20217F4301999-10-14014 October 1999 Responds to 991012 Rai,Based on 991001 Telcon Re Suppl to Request for TS Change to Revise MCPR Safety Limit & Add Approved Siemens Topical Rept for LaSalle County Station, Unit 1 ML20217D3191999-10-12012 October 1999 Submits Request for Addl Info Re Licensee 990707 Proposed License Amend to Revise Min Critical Power Ratio.Listed Questions Were Discussed with Util in 991001 Telcon ML20217C1671999-10-0808 October 1999 Provides Suppl to RAI for Approval of Unreviewed Safety Question Re Assessment of Certain safety-related Concrete Block Walls at LaSalle County Station,Units 1 & 2 ML20217A7601999-10-0606 October 1999 Forwards Insp Repts 50-373/99-15 & 50-374/99-15 on 990729-0916.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20212M0931999-10-0404 October 1999 Refers to 990922-23 Meeting Conducted by Region II at LaSalle Nuclear Power Station.Purpose of Visit,To Meet with Licensee Risk Mgt Staff to Discuss Util Initiatives in Risk Area & to Establish Dialog Between SRAs & Risk Mgt Staff 05000373/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl1999-10-0404 October 1999 Forwards LER 99-003-00 IAW 10CFR50.73(a)(2)(iv).Commitments for Submittal Also Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20217A6201999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issue Matrix & Insp Plan Encl ML20212E7171999-09-22022 September 1999 Forwards RAI Re Requesting Approval of License Amend to Use Different Methodology & Acceptance Criteria for Reassessment of Certain Masonry Walls Subjected to Transient HELB Pressurization Loads 05000374/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl1999-09-20020 September 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Encl ML20212C0591999-09-17017 September 1999 Informs That NRC Reviewed Licensee Justifications for Deviations from NEDO-31558 & Determined That Justifications acceptable.Post-accident Neutron Flux Monitoring Instrumentation Acceptable Alternative to Reg Guide 1.97 ML20212A3581999-09-13013 September 1999 Confirms That Fuel MCPR Data for LaSalle County Station,Unit 1,Cyle 9,sent by Ltr Meets Condition 2,as Stated in 970509 NRC Ltr ML20211Q9911999-09-10010 September 1999 Informs That License SOP-4048-4,for Wp Sly May Be Terminated Due to Individual Retiring ML20212A1141999-09-10010 September 1999 Forwards RAI Re Licensee 990519 Amend Request,Which Proposed to Relocate Chemistry TSs from TS to licensee-controlled Documents.Response Requested by 990930,so That Amend May Be Issued to Support Upcoming Unit 1 Refueling Outage ML20211P2211999-09-0808 September 1999 Forwards Insp Repts 50-373/99-14 & 50-374/99-14 on 990809- 13.No Violations Noted.Insp Concluded That Emergency Preparedness Program Maintained in Good State of Operational Readiness ML20212A8571999-09-0707 September 1999 Informs That Proprietary Document, Power Uprate SAR for LaSalle County Station,Units 1 & 2, Rev 2,Class III, NEDC-32701P,submitted in ,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20211Q6861999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant License Applicants During Wks of 001113 & 20. Validation of Exam Will Occur at Station During Wk of 001023 05000374/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Encl1999-09-0303 September 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Encl ML20211M1151999-08-31031 August 1999 Requests That Following Eleven Individuals Take BWR Gfes of Written Operator Licensing Exam to Be Administered on 991006 ML20211G1831999-08-27027 August 1999 Provides Addl Clarification of Proposed Refueling Practices Under Proposed Core Alterations Definition Re 990813 Application for Amend to TS ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F8731999-08-25025 August 1999 Forwards Insp Repts 50-373/99-13 & 50-374/99-13 on 990804-06 & 09-11.No Violations Noted.Fire Protection Program Strengths Includes Low Number of Fire Protection Impairments & Excellent Control of Transient Combustibles ML20210U3201999-08-17017 August 1999 Forwards Insp Repts 50-373/99-12 & 50-374/99-12 on 990623-0728.No Violations Noted ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed 05000373/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Listed1999-07-23023 July 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i).Commitments Made by Util Are Listed ML20210E0501999-07-22022 July 1999 Submits Summary of 990630 Management Meeting Re Licensee Performance Activities Since Start Up of Unit 2.List of Attendees & Matl Used in Presentation Enclosed ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209H5171999-07-15015 July 1999 Discusses 990701 Telcon Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at LaSalle County Nuclear Generating Station for Weeks of 990913,1018 & 1129 ML20209G4031999-07-14014 July 1999 Forwards Insp Repts 50-373/99-11 & 50-374/99-11 on 990614-18.No Violations Noted ML20209E1211999-07-14014 July 1999 Submits mid-cycle Rev of COLR IAW LaSalle County Tech Spec 6.6.A.6.d.Rev to COLR Was Necessary Due to Implementation of TS Change Approved by Ltr Dtd 990212,which Changed Turbine Stop Valve & Turbine Control Valve Scram ML20209F6931999-07-13013 July 1999 Forwards Insp Repts 50-373/99-04 & 50-374/99-04 on 990513-0622.No Violations Noted.Determined That Multiple Challenges to Main Control Room Operators Occurred During Insp Period Due to Human Performance Weaknesses ML20210C1521999-07-0909 July 1999 Forwards Post-Outage (90 Day) Summary Rept for ISI Examinations & Repair/Replacement Activities Conducted from Beginning of First Insp Period of Second ten-yr Insp Interval Through L2R07 Refueling Outage ML20209G3901999-07-0909 July 1999 Informs NRC of Status of Commitments & Requests NRC Concurrence for Use of ASME Section III App F Acceptance Criteria to Permanently Qualify Units 1 & 2 Penetrations M-49 & M-50 ML20209E0341999-07-0909 July 1999 Provides NRC with Siemens Power Corp (SPC) Fuel & GE Fuel MCPR Data for LaSalle Unit 1 Cycle 9.LaSalle Unit 1 Is Currently Scheduled to Start Cycle 9 in 991101 ML20209E0361999-07-0808 July 1999 Forwards LaSalle County Station Unit 2 Cycle 8 Startup Test Rept Summary,Iaw TS NPF-18,Section 6.6.A.1.Startup Test Program Was Satisfactorily Completed on 990501 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196J4711999-06-30030 June 1999 Discusses Closure of GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Units 1 & 2 ML20212J0311999-06-21021 June 1999 Informs of Actions Taken to Close Remaining Open Items in .Attachment Provides Detailed Justification for Closure of Open Items in Sections 5.2.2 & 5.2.8 ML20196B1951999-06-18018 June 1999 Informs NRC That Do Werts,License OP-30373-2,no Longer Requires Use of NRC License for LaSalle County Station. License May Be Terminated ML20195J7761999-06-15015 June 1999 Submits Request Relief CR-23,requesting Relief from Code Required Selection & Examinations of Noted Integral Attachments & Proposes to Utilize Alternative Selection & Examination Requirements Similar to Code Case N-509 ML20196G8021999-06-15015 June 1999 Requests Renewal of SRO License for Vv Masterson.Current License for Vv Masterson Will Expire Jul 1999.NRC Forms 398 & 396,encl.Without Encls ML20195G7101999-06-11011 June 1999 Informs That Effective 990514,GH Mccallum,License SOP-31412, No Longer Requires Use of NRC License for LaSalle Station. License Should Be Terminated ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20207D2821999-05-27027 May 1999 Requests That Implementation Date for Unit 1 Be Changed Prior to Startup for L1C10 to Allow Best Allocation of Resources to Implement Unit 1 Amend Prior to Startup for Either L1C9 or L1C10.Unit 2 Will Implement Mod IAW Request 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217D3191999-10-12012 October 1999 Submits Request for Addl Info Re Licensee 990707 Proposed License Amend to Revise Min Critical Power Ratio.Listed Questions Were Discussed with Util in 991001 Telcon ML20217A7601999-10-0606 October 1999 Forwards Insp Repts 50-373/99-15 & 50-374/99-15 on 990729-0916.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20212M0931999-10-0404 October 1999 Refers to 990922-23 Meeting Conducted by Region II at LaSalle Nuclear Power Station.Purpose of Visit,To Meet with Licensee Risk Mgt Staff to Discuss Util Initiatives in Risk Area & to Establish Dialog Between SRAs & Risk Mgt Staff ML20217A6201999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issue Matrix & Insp Plan Encl ML20212E7171999-09-22022 September 1999 Forwards RAI Re Requesting Approval of License Amend to Use Different Methodology & Acceptance Criteria for Reassessment of Certain Masonry Walls Subjected to Transient HELB Pressurization Loads ML20212C0591999-09-17017 September 1999 Informs That NRC Reviewed Licensee Justifications for Deviations from NEDO-31558 & Determined That Justifications acceptable.Post-accident Neutron Flux Monitoring Instrumentation Acceptable Alternative to Reg Guide 1.97 ML20212A3581999-09-13013 September 1999 Confirms That Fuel MCPR Data for LaSalle County Station,Unit 1,Cyle 9,sent by Ltr Meets Condition 2,as Stated in 970509 NRC Ltr ML20212A1141999-09-10010 September 1999 Forwards RAI Re Licensee 990519 Amend Request,Which Proposed to Relocate Chemistry TSs from TS to licensee-controlled Documents.Response Requested by 990930,so That Amend May Be Issued to Support Upcoming Unit 1 Refueling Outage ML20211P2211999-09-0808 September 1999 Forwards Insp Repts 50-373/99-14 & 50-374/99-14 on 990809- 13.No Violations Noted.Insp Concluded That Emergency Preparedness Program Maintained in Good State of Operational Readiness ML20212A8571999-09-0707 September 1999 Informs That Proprietary Document, Power Uprate SAR for LaSalle County Station,Units 1 & 2, Rev 2,Class III, NEDC-32701P,submitted in ,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20211Q6861999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant License Applicants During Wks of 001113 & 20. Validation of Exam Will Occur at Station During Wk of 001023 ML20211F8731999-08-25025 August 1999 Forwards Insp Repts 50-373/99-13 & 50-374/99-13 on 990804-06 & 09-11.No Violations Noted.Fire Protection Program Strengths Includes Low Number of Fire Protection Impairments & Excellent Control of Transient Combustibles ML20210U3201999-08-17017 August 1999 Forwards Insp Repts 50-373/99-12 & 50-374/99-12 on 990623-0728.No Violations Noted ML20210E0501999-07-22022 July 1999 Submits Summary of 990630 Management Meeting Re Licensee Performance Activities Since Start Up of Unit 2.List of Attendees & Matl Used in Presentation Enclosed ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209H5171999-07-15015 July 1999 Discusses 990701 Telcon Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at LaSalle County Nuclear Generating Station for Weeks of 990913,1018 & 1129 ML20209G4031999-07-14014 July 1999 Forwards Insp Repts 50-373/99-11 & 50-374/99-11 on 990614-18.No Violations Noted ML20209F6931999-07-13013 July 1999 Forwards Insp Repts 50-373/99-04 & 50-374/99-04 on 990513-0622.No Violations Noted.Determined That Multiple Challenges to Main Control Room Operators Occurred During Insp Period Due to Human Performance Weaknesses ML20196J4711999-06-30030 June 1999 Discusses Closure of GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Units 1 & 2 ML20195B6031999-05-24024 May 1999 Ack Receipt of Which Transmitted Changes Identified as Rev 60 to LaSalle Nuclear Station Security Plan,Submitted Per Provisions of 10CFR50.54(p) ML20206U3641999-05-19019 May 1999 Confirms Plans to Conduct Routine Mgt Meeting on 990630 in Lisle,Il Re Recent Plant Performance & Lessons Learned from Unit 2 Restart ML20206T0081999-05-19019 May 1999 Forwards Insp Repts 50-373/99-03 & 50-374/99-03 on 990401-0512.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations.One Violation Re Two Operators Failure to Log Suppression Pool Temp as Required ML20206S5291999-05-14014 May 1999 Forwards Insp Repts 50-373/99-10 & 50-374/99-10 on 990419-23.Violation Noted:Nrc Determined That Previously Unresolved Item Involving Failure to Adequately Implement fitness-for-duty program,non-cited Violation ML20206K7401999-05-0303 May 1999 Informs That as Result of April 1999 Senior Mgt Meeting, LaSalle Identified as Routine Oversight Plant.Summary of NRC Discussion Related to LaSalle Listed.Meeting Scheduled for 990506 to Discuss Latest Meeting of NRC Senior Managers ML20206G6631999-05-0303 May 1999 Forwards Insp Repts 50-373/99-07 & 50-374/99-07 on 990329- 0402.NRC Determined That Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206G7511999-05-0303 May 1999 Forwards Insp Repts 50-373/99-09 & 50-374/99-09 on 990406-09.No Violations Were Identified.Insp Focused on Actions Recently Taken to Identify Common Causes for Previously Identified Programmatic Radiation Staff Problems ML20205S8101999-04-20020 April 1999 Forwards Insp Repts 50-373/99-08 & 50-374/99-08 on 990311- 26.No Violations Noted.Overall,Insp Results Indicated That Unit 2 Mods Properly Installed & That Plant Matl Condition of Unit 2 Acceptable ML20205R5461999-04-16016 April 1999 Forwards Insp Repts 50-373/99-02 & 50-374/99-02 on 990217- 0331.Non-cited Violation Re Failure of Operator to Follow Procedure Which Resulted in Surveillance Procedure Acceptance Criteria Being Evaluated ML20205R4171999-04-16016 April 1999 Forwards Summary of 990406 Meeting Re Readiness for Restart of Plant,Unit 2 & Dual Unit Operation & Recent Plant Performance Review Issued by NRC ML20205J2381999-04-0505 April 1999 Submits Summary of 990322 Meeting with Util to Discuss Experiences & Performance of Plant Since Startup of Unit 1 Status of Matl Condition & Unit 2 Outage.Associated Meeting Summary & Handouts Provided by Util Encl ML20205D5801999-03-29029 March 1999 Refers to Insps 50-373/98-17 & 50-374/98-17 & Subsequent OI Investigation 3-98-032 Into Info Reported to NRC by Comed on 980518,that Deliberate Violation of NRC-required FFD Program May Have Occurred at LaSalle & Forwards NOV ML20205D6971999-03-29029 March 1999 Discusses Insp Repts 50-373/98-17 & 50-374/98-17 & OI Rept 3-98-015 Completed on 981119 & Forwards Nov.Apparent Deliberate Violation of NRC-required Comed Fitness for Duty Program Noted ML20205G5411999-03-26026 March 1999 Advises of Completion of Plant Performance Review on 990204 to Develop Integrated Understanding of Safety Performance. Overall Performance at Plant Improved as Discussed.Insp Plan & Plant Issues Matrix Encl ML20205A6411999-03-25025 March 1999 Refers to Investigation Conducted by OI (Investigations Rept 3-1998-028) to Determine If Employment Discrimination Occurred After Contract Worker Raised Radiation Safety Concerns Re Plant.Synopsis from Subj Rept Encl ML20204J8411999-03-24024 March 1999 Submits Summary of 990226 Meeting Re Performance of LaSalle Since Startup of Unit 1,status of Matl Condition of LaSalle & Status of Unit 2 Outage.List of Attendees & Matl Used Encl ML20205A6211999-03-24024 March 1999 Discusses 990226 Mgt Meeting with Util Re Performance of LaSalle Since Startup of Unit 1,status of Matl Condition of LaSalle & Status of Unit 2 Outage.Associated Meeting Summary & Handout Provided to NRC by Util Encl ML20204J7021999-03-22022 March 1999 Confirms Plans to Conduct Mgt Meeting on 990406 at Mazon Emergency Operations Facility to Discuss Readiness for Restart of Unit 2 ML20204E0751999-03-18018 March 1999 Discusses Review of Rev 6M to Portions of Plant Emergency Plan Site Annex ML20207J8901999-03-10010 March 1999 Forwards Insp Repts 50-373/99-01 & 50-374/99-01 on 990106- 0216.No Violations Identified.Personnel Errors Occurred During Insp Period.Overall Performance of Plant Personnel Acceptable ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203C9811999-02-0808 February 1999 Ack Receipt of ,Which Transmitted Changes Identified as Rev 59 to Security Plan.No NRC Approval Required ML20203A1981999-02-0202 February 1999 Forwards Insp Repts 50-373/98-23 & 50-374/98-23 on 981121-990105.No Cited Violations Identified.Two Equipment Problems Identified During Shutdown for Planned Outage Were Not Effectively Addressed to Preclude Problem Recurrence ML20198N4531998-12-18018 December 1998 Confirms Plans to Conduct Routine Mgt Meeting on 990119 at Mazon Emergency Operations Facility to Discuss Lasalle,Unit 1 Performance & Status of Lasalle,Unit 2 Restart Activities ML20198E9281998-12-17017 December 1998 Forwards Insp Repts 50-373/98-22 & 50-374/98-22 on 981010- 1120.No Violations Noted.Overall Performance of Plant Personnel Was Acceptable ML20198F2891998-12-16016 December 1998 Forwards Insp Repts 50-373/98-25 & 50-374/98-25 on 981102-06.No Violations Noted.Insp Was Evaluation of Operator Workaround Program ML20198B3741998-12-14014 December 1998 Forwards SE Accepting one-time Request for Relief from Certain Provisions of Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a for Certain Plant Safety/Relief Valves ML20197H3561998-12-0404 December 1998 Final Response to FOIA Request for Docments.Records in App a Encl & Will Be Available in PDR ML20198B1531998-12-0202 December 1998 Forwards Insp Plan for Next 6 Months & Plant Issues Matrix. Info Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite ML20196F7361998-12-0202 December 1998 Informs That Document GE-NEDC-31531P,Suppl 1, ARTS Improvement Analysis for Lscs,Units 1 & 2,Removal of Direct Scram Bypassed Limits, Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196G4601998-11-27027 November 1998 Forwards FEMA Correspondence, Transmitting FEMA Final Evaluation Rept for 980318 Emergency Preparedness Exercise at LaSalle Nuclear Generating Station 1999-09-08
[Table view] |
Text
.
Y d REG e
?
.~ -t UNITED STATES j
j f
NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20065-0001 L
\+...+/ APR 2 91993 Science & Engineering Associates, Inc.
ATTN: Ms. Ilene Colina SEA Plaza 6100 Uptown Boulevard, N.E.
Albuquerque, New Mexico 87110
Dear Ms. Colina:
SUBJECT:
TASK ORDER NO. 5, ENTITLED " EMERGENCY OPERATING PROCEDURE - LA SALLE" UNDER CONTRACT NO. NRC-03-93-036 In accordance with Section G.5(c) of the subject contract, entitled
" Task Order Award," this letter definitizes the subject task order and confirms the verbal authorization provided to you on April 5, 1993 by Amy Siller of my staff, to commence work under the subject task order ef fective April 7, 1993. This effort shall be performed in accordance with the enclosed Statement of Work, and the Contractor's proposal dated April 6, 1993. '
Task Order No. 5 shall be in effect from April 7, 1993 through '
May 21, 1993, with a cost ceiling of $11,146.00. This amount is inclusive of the temporary ceiling of $8,000.00 that was verbally ,
authorized pending definitization of this task order. The amount of $10,766.00 represents the total estimated reimbursable costs, the amount of $375.00 represents the fixed fee, and the amount of
$5.00 represents the facility's capital cost of money.
Funding for this task order has been obligated on the basic contract under Job Code No. J-2012-3.
The following individual is considered to be essential to the successful performance of the work hereunder: James Lynch.
The Contractor agrees that such personnel shall not be removed from the effort under the task order without compliance with Contract Clause H.1, Key Personnel.
Your contacts during the course of this task order are:
Technical Matters: Ms. Karen Pulsipher Project Officer (301) 504-1216 Contractual Matters: Ms. Amy Siller Contract Administrator (301) 492-8027 The issuance of this task order does not amend any terms or conditions of the subject contract.
A I 9308250314 930429 l , h f' PDR CONTR l NRC-09-93-036 PDR U
9 Contract No. NRC-03-93-036 Task Order No. 5 Please indicate your acceptance of this task order by having an official, authorized to bind your organization, execute three (3) ,
copies of this document in the space provided and return.two (2) copies to the Contract Administrator, Ms. Amy Siller. You should retain the third copy for your records. -
Sincerely, -
LM & '
Mary Lynn Scott, Contracting Of ficer Contract Administration Branch No.1 Division of Contracts and ;
Property Management l Office of Administration l
Enclosure:
As stated !
I ACCEPTED:
i L. A/
Njme Contract Administrator Title 1 May 4, 1993 l Date 1
i
- w. - ..
Statement of Work For Task Order No. 5 Under FIN J 2012-3 Contract No. NRR-93-036
Title:
Emergency Operating Procedure - La Salle NRC Project Manager: Karen Pulsipher, NRR (301-504-1216)
Technical Monitor: Jesse Arildsen, NRR (301-504-1026)
Team Leader: Gregory Nejfelt, RIII (708-790-5528) ,
Inspection Report: 50-373/93-009 NRR Priority Number: 2 J
BACKGROUND SEA assists NRR in the conduct of regionally led inspections .
related to human performance. Assistance is provided in the areas of training and qualification effectiveness, emergency l t
operating procedures, and investigation of events identified as having a potential human performance root cause. The NRC staff has selected La Salle County Station as a site to conduct an emergency operating procedure follow-up inspection. The inspection will be performed in accordance with Inspection Procedure 42001.
OBJECTIVE I
The objective of this task order is to obtain expert technical expertise to assist the NRC inspection team in the performance of the subject emergency operating procedure follow-up inspection at the La Salle County Station and to provide input to the !
inspection report based on the inspection findings in a format i specified by the NRC inspection team leader. j I'
TECHNICAL AND OTHER SPECIAL OUALIFICATIONS REOUIRED One human factors specialist with expertise in the review and assessment of EOPs is required for this inspection. Eligibility for unescorted access at the La Salle County Station-is required l for this inspection. It is the responsibility of the contractor j to assign technical staff, employees, subcontractors, or i consultants who have the required educational background, l experience, or combination thereof to meet both the technical and regulatory objectives of the work specified in this SOW. The NRC will rely on representations made by the contractor concerning the qualifications of the personnel assigned to this task order including assurance that all information contained in the technical and cost proposals, including resumes, is accurate and truthful.
l WORK REOUIREMENTS AND SCHEDULE The contractor shall provide qualified specialists to assist the ;
NRC staff in preparing for and conducting the La Salle County l' Station emergency operating procedure follow-up inspection and documenting inspection activities and findings. This inspection i is scheduled to begin on or about April 5, 1993. Specific tasks under this task order are:
Task Scheduled Completion l
- 1. Prepare for the inspection by One working day prior reviewing inspection-related to the on-site background documentation and inspection efforts. ;
records as directed by the Technical Monitor or Team Leader and prepare input for the i l
inspection plan.
- 2. Assist the NRC inspection team Completion coincident during the on-site EOP inspection with the end of the j time by providing human factors inspection. !
engineering expertise as related to j the review of the development, .
implementation, and maintenance of !
the EOPs. The activities performed during the inspection shall be in l accordance with Inspection {
Procedure 42001, " Emergency ;
Operating Procedures" and the ;
inspection plan. ;
- 3. Provide the Team Leader-with a Input to the Team written report detailing the Leader coincident with .
inspection findings. The Team the end of the on-site '!
Leader shall use the contractor's inspection effort. j i
input to prepare the NRC inspection report. Complete appropriate portions of a Human Factors Information System (HFIS) Plant Status Data Collection Form. ,
- 4. Provide the Human Factors One week after the Assessment Branch of NRR with a completion of the on-copy of the written report of the site inspection ,
inspection findings which was effort. !
privided to the Team Leader and the l HFIS Plant Status Data Collection -I Form completed in task 3.
t l
?
~
LEVEL OF EFFORT The level of effort is estimated at 8.5 professional staff days, apportioned among the tasks for planning purposes:
Tasks Level of Effort (days) 1 Technical effort 1.0 Project management 0.5 2 Technical effort 5.0 3 Technical effort 1.0 4 Project management 0.5 Clerical 0.5 PERIOD OF PERFORMANCE The period of performance is projected to be 45 days from initiation of work.
DELIVERABLES
- 1. At the completion of task 1, the contractor shall provide inspection plan input to the Team Leader.
- 2. At the completion of Task 2 and prior to the inspection team's exit meeting with the licensee, the contractor shall>
submit a summary of written notes, major observations, and findings pertinent to the inspection as specified by the Team Leader.
- 3. At the completion of Task 3, the contractor shall provide a final inspection report input to the Team Leader. The format and scope of this input shall be specified by the Team Leader. This input will serve as documentation of the contractor's inspection activities, efforts, and findings, and will be used by the NRC Team Leader for the preparation of the NRC's inspection report.
- 4. At the completion of Task 4, the contractor shall provide the Human Factors Assessment Branch of NRR with_a copy of the final inspection report input which was provided to the Team Leader and the HFIS plant Status Data Collection Form completed in task 3.
MEETINGS AND TRAVEL one, one-person, five day trip to the La Salle County Station in the Ottawa,-IL area.
The contractor specialist will attend all coordination, planning, entrance, and exit meetings as specified by the Team Leader. The
. - = - . . .
contractor specialist will coordinate all travel arrangements with the Team Leader.
i NRC FURNISHED MATERIALS Documents required to prepare for the emergency operating procedure follow-up inspection at the La Salle County Station will be provided by the Team Leader. ,
APPLICABLE SPECIAL PROVISIONS t i
The work specified in this task order is licensee fee recoverable. .The contractor shall provide fee recovery information in the monthly progress reports in accordance with ;
the requirements of the basic contract..
i
.I
?
i f
-5
(
i r
4 l
I l
i
~
!