AMENDMENT OF SOLICITATION /MODIFICAT(ON OF CONTf1ACT
- s. ur ecuve onz e
- e. scoun< uoNamacHAsc Rea No,
- s. eRonct uo. <u e,,m, w eu o n e m inou<, sea v on n o.
Seven (7) 6/1/93 RFPA RES-90-085 dtd 4/2/o'
- 1. ao-iNisu.Rc0 ov cr ou.<, m.n ei<n. si cooc [
- e.,ssoco.y g
Document ID #RES-C93-031 tl.S. Nuclear Regulatory Commission Washington, DC 20555
]-
Division of Contracts & Property Management
+
l S.ftAME AND ADORLSS OF CONT P. ACTOR (Ne strved, cessaty, sasse end JJP C Hief y)
DA. AMLNN-'tT OF &OLsCET At tOtt No, Westinghouse Electric Corp.
Science & Technology Ctr., Contracts Mgmt. Dept.
Va.OATLOf5KZZTLM22]
1310 Beulah Road l
Pittsburgh, PA 15235-5098 noA.goirecanON OF COca RACTf0 roc 8 l PrieN__1 Investigator /Tehnh1 NRC-04-90-085 Contac't:
Emilie Roth y
aca. o^2 Co ssss em' **J 91ophw No. (412) 256-2753 9/18/90 lFACluTY CODE CODE 11.THis ITEM ONLY APPLIESTO AMENDMENTS OF SOLICfTATIONS O u.se.nd.i. O is O 7t..e e-ee s ecocheoonis.,nonded esset orshini.emi4.The h r.nddete s,sc ri.dior.o.ipi.<O,,e,.
Offers snust W ' '.= esceipt of this amendment prior so the hcurand deer specIGed la the souchsenon oras amend tended.
I
- aa8a*efthe z--i-
- T dbl By acknow4 edging seasipt of thle amendment on each copy of die offer 8:NOWLEDG.
outentteed: or ict ey esperses letter er telegramwhich truentan a seierence to the soGcitetion and amendment ensu (el Oy completing items 8 erd 15.end retuming -
a#D(T70 BE RECfJYED AT THE PLACE DESIGNATED FOR THE RECEIPTOF OFFER Ord REJECTION OF YOUft OFFCR. If tg wirees of this amendment you deelte to chen0s an effer already subehe lead le secahed prior to the epenify hour and date speelGod.
seteers s2'=' each telegram or letter enskee seierence to the solicitation ard this.- -f 12 ACCOUNT 4teG At40 APPROf*R&Al EON CA1 A (If segradred)
N/A
- 13. THIS (TEM APPLIES ON LY TO MODIFICATIONS OF CONTRACTS / ORDERS.
(T MOD (FiESTHE CONTR$/ ORDER HO. AS DESCRIBED IN ETEM 14.
(spHerf euekorief it4C CHANGCS SET FORTH LN 8 TEM 14 ARC MADC IN Y HC CON %
45 455000 PUR$UANT 10:
U,A.7Ha$CHANGCOROCRTRACT ORDER NO. IN 8TCM 10A.
1THE A80VC NUMBERCO CONTRACT /OROCR 15 eAOOtFrCD TO REFLECT THC ADMINtSTRATfvC CHANGCS
,,. ;-;; dos deae.edeJ ECT FORTH GN ITCM 14. PURSUANT TO THE AUTHORITY OF FAR 43.103(t$.
C.1Has sue +t LMENT AL AGRCEMCNT 45 Ctf1LRLD $NTO PUR$UANT TO AUTHORtT X
FAR 52.243-2, 0.01HLR t$ptetty type of enodtficetion and auUserky) b is requiredto sian tNs document and return 2 copies to the issuing office.
E.(MPORTANT: Cordractor is not, sc OtsCamnoN or AucNOucNrfuoOiricaitON (Orrenared ary 4;cr.rce.a he.daats.sn ' dN teciseaiea/coner.es.utii.cs uer here tee.<taeJ Continued on page 2 e
9308250299 930729 i)
PDR CONTR
[
NRC-04-90-085 PDR ed and in fuu (One Eg(provided hmin, aff terrns and condiflom of tt e document referenced in item SA or 10A, as heretofore clunge If.A. NAldC AND T IT LE OF CONT RAC1 tNG Or r 4CCR (Type or prinD 15,4. NAMC ANO l t1 LE OF StGNCR (Type or ptsa ff M. Zaharoff Mary Lynn Scott, Contracting Officer Manager, STC Contracts 16C.OATC StGNU A SC. DAlt' LIGNc0 It,0. UNt1 EO ST ATLS Of A LR1CA N16gioR/oeip.oR,,
A b f Contractant O//scer) m 22 sa 35 m
l 6-30
?
T 3ab M
($snetsre o
'fssrytur,e mpW.een evoorued so s(snf I
..-..-,. d. I...../
30105 n.
.n,i e., c u
)
k Contract No. NRC-04-90-085 Modification No. 7 Page 2 of 2 The purpose of this modification is to (1) provide for within scope changes in accordance with the attached statement of work and the contractor's technical proposal dated May 26,1993,(2) decrease the total estimated cost ceiling by
$730.00 as a result of redirection of work, (3) extend the period of performance, and (4) revise the indirect cost rates. Accordingly, the contract is modified in accordance with the following:
(1)
Section B, subsection B.3 - CONSIDERATION AND OBLIGATION--COST PLUS FIXED FEE, paragraph a. is hereby modified to read as follows:
B.3 CONSIDERATION AND OBLIGATION--COST PLUS FIXED FEE (JUNE 1988)
ALTERNATE I (JUNE 1988) a.
The total estimated cost to the Government for full performance of this contract is $619,430, of which $601,469 represents the estimated reimbursable costs, and of which $18,067 represents the fixed fee.
(2)
Section C, subsection C.1 STATEMENT OF WORK is hereby revised as reflected in Attachment I and the contractor's technical proposal dated May 26, 1993, incorporated herein by reference.
(3)
Section F.6 DURATION OF CONTRACT PERIOD is deleted in its entirety and substituted with the following:
F.6 DURATION OF CONTRACT PERIOD This contract shall commence on September 18, 1990 and will expire on November 30, 1993.
(4)
Section G, subsection G.1 INDIRECT COST RATES is hereby d'eleted in its entirety and substituted with the following:
G.1 INDIRECT COST RATES a.
Pending the establishment of final indirect rates which shall be negotiated based on an audit of actual costs, the contractor shall be reimbursed for allowable indirect costs as follows:
Rate Base Period Overhead - 133.2%
Direct Labor 1/1/93 - 12/31/93 G & A - 19.71%
Total Direct Costs Same as above Facilities Capital Cost of Money:
Direct Labor Same is above CoC - CORP
.107%
Total Direct Costs Same as above i
l J
j ATTACHMENT 1 Statement of Work Proposed Modification No. 7, Contract No. NRC-04-90-085 Task 5:
Implement the CES System Conversion Add the following language at the end of Task 5:
Backaround Concernina Data From Licensees 1.
The observations of licensee crews during simulated exercises is being conducted for research purposes, and the results are not intended to be used in regulatory appraisal, including as a basis for enforcement of licensee staff, particular crews, or individual operators.
Nevertheless, should the NRC observe during the course of this research project any actions by the licensee (s) or any of its personnel that requires action to protect the public health and safety, nothing in this contract precludes the NRC from taking such action.
2.
NRC may send a draft of the NUREG/CR and other papers and reports to the licensee (s) participating in the research for comment t
i before they are published, in order to assure accuracy of the contents.
Provisions Concernina Data From Licensees 1.
Results of the analysis will take the form of descriptions of the performance of crews and summary statistics that describe performance across crews. Descriptions of crew performance may include verbatim transcripts of crew communication and actions (with names of crew members replaced by the crew position), and decision traces. A decision trace is a time chart of the cognitive activities and performance of a crew; it summarizes the plant data and crew examined, the hypotheses the considered, the discussions they held, the actions they took, and the rationale they provided for the actions. Except for these results, data or-results, or transcripts of the videotapes or surveys will only be provided to NRC should the NRC need such information to take i
action against the licensee or its employees to protect the public i
health and safety.
2.
These provisions also apply to subcontractor (s) for this project.
i l
b i
1
Task 7: Document and Present Results Modification No. 3 (p. 3-5) added "A one-day introduction / tutorial" and "A five-day workshop."
Eliminate the work added in Modification No. 3, and incorporate the following:
o Prepare transcripts of all sections of all videotapes that deal with the detection, diagnosis, or response to the major event (ISLOCA or loss of heat sink), and include these transcripts in an appendix to the final report.
Evaluate the team performance (communication and coordination) of o
each crew using behaviorally anchored rating scales.
o Develop a classification scheme for actions taken by operators in (1) actions that follow procedures verbatim, (ght be For example, one classification mi relation to procedures.
2) as follows:
actions that are procedurally based, or (3) actions that are extra-procedural.
+
o Using the classification scheme for actions, classify actions directly related to the operators' response to the major event (ISLOCA or loss of heat sink) taken by all crews for both scenarios.
Task 8: Develop Videotape Demonstrating the CES Capabilities Delete this task in its entirety.
Section 6.2 Travel Three additional trips to Rockville, Maryland are to be added -- two trips for 3
two people to discuss and present results to NRC headquarters staff; and, one trip for one person to make a presentation at the NRC Water Reactor Safety Meeting in October, 1993.
Section 4.
Schedules and Deliverables Table 4.1, " Revised Task Schedule" (incorporated in Modification No. 3, p.12) is modified as follows:
Task 5, Implement Conversion June 30, 1993 Task 6, Test / Demonstrate June 30, 1993 Task 7, Document Results September 30, 1993 Table 4.2, " Revised Deliverables List" (incorporated in Modification No. 3, p.
- 12) is hereby replaced with the following:
2
0 Schedule for Task 7:
Final Report, first draft, send to licensees by June 1,1993.
Licensee comments due to Westinghouse by July 15, 1993.
finai Report, second draft, sent to NRC ten days after receiving licensee comments (i.e., by July 26 at the latest).
NRC to send comments to Westinghouse within 50 days (i.e., by September 14 at the latest).
Final Report, camera-ready copy for publication as a NUREG/CR submitted to NRC 30 days after receiving NRC comments (i.e., by October 14 at the latest).
Debriefing of cooperating licensees to be conducted by July 31, 1993.
Presentation on Ta,k 7 Report at the annual NRC Water Reactor Safety Conference, October 25-27, 1993.
Presentation on Task 7 Report to NRC staff by November 1,1993.
a y
3
.