ML20056E899

From kanterella
Jump to navigation Jump to search
Forwards Zion Station Units 1 & 2 Updated FSAR 1993 Annual Update & Zion Nuclear Power Station 10CFR50.59 Summary Rept 920101-930222
ML20056E899
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/19/1993
From: Simpkin T
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20056E900 List:
References
NUDOCS 9308250277
Download: ML20056E899 (2)


Text

Commonwealth Edison

' 1400 Opus Pi ca g

Downers Grove, Illinois 60515 l-c August 19,1903 Dr. Thomas E. Murley, Director Office of Nuclear R.eactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

[

Subject:

Zion Station Units 1 and 2 Annual FSAR Update / Submittal.of Periodic Safety Evaluation Summary Report.

NRC Docket Nos. 50-295 and 50-304

Dear Dr. Murley:

In accordance with the requirements of 10CFR50.71(e), Commonwealth Edison hereby submits the Annual FSAR Update for Zion Station Units 1 and 2. Also attached is the Periodic Zion Station Summary Safety Evaluation Report. These reports address the period from January 1,1992 to February 22,1993 (end of the Unit 2 refueling outage), and have been prepared in accordance with the requirements of 10CFR50.59(b) and 10CFR50.71(e).

Attachment A describes changes made to the plant or procedures which were in effect as of February 22,1993 and provides a summary of the safety evaluation for each change. Attachment B is a Change Log which describes the individual changes made to the UFSAR~duc to analyses and changes to the plant or procedure which were in effect as of February 22,1993. Attachment C provides instructions for replacement of UFSAR pages as well as actual revised USFAR pages.

Commonwealth Edison certifies that the information provided accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to NRC or prepared pursuant to NRC requirements.

bv@

f f'

s ((

c ::t n r.* n 9308250277 930819 gfp i

L-

PDR-ADOCK 05000295 W

[

K PDR b

k;\\nla\\ tr-nrez.wpt/12

._ i

.~..

i Dr. Thomas E. Murley August 19,1993 l

4 e

Pursuant to 10CFR50.4(b)(6), one signed original and ten (10) copies.of the l

updated FSAR are being provided to the Document Control Desk, plus one (1) copy to i

the NRC Region III office and one (1) copy to the Zion Resident Inspector Office.

i i

i Respectfully, t

i a*

a T. hb

(

T.W. Simpkin Nuclear Licensing Administrator Attachments:

l (A)

Safety Evaluation Summaries (B)

UFSAR Change Log (C)

UFSAR Replacement Pages cc:

Document Control Desk - NRR (10 copies)

{

J.B. Martin, Regional Administrator - RIII C.Y. Shiraki, Project Manager - NRR l

J.D. Smith, Senior Resident Inspector - Zion j

i I

f l

[

i f

I i

{

l k:\\nla\\1tr-nrcz.wpf/13

.... ~. _

.... ~~

l 1,

(

i

]

I i

8 3

k f

f 8

ATTACHMENT A l

i i

4 f

50.59 SAFETY EVALUATION SUMMARIES i

i t

i i

h i

6 i

?

I a

}

1 i

i t

i 1

1

(

i i

a.

zcorrra-59sarlet.93 2 l

t

.