ML20056E874

From kanterella
Jump to navigation Jump to search
Mod 4,increasing Contract Ceiling,Incorporating within Scope Changes to SOW & Extending Period of Performance Through 930630,to Procedures for Evaluating Aging Effects on Plant Risk
ML20056E874
Person / Time
Issue date: 04/30/1993
From: Muzio B, Michael Scott
NRC OFFICE OF ADMINISTRATION (ADM), SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
References
CON-FIN-L-2388, CON-NRC-04-92-063, CON-NRC-4-92-63 NUDOCS 9308250254
Download: ML20056E874 (4)


Text

.

3.CONIRACT 40 Coot ~

6 % C C & g. g "

4 j

NAENDMENT OF SO LICITATION / MODIFICATION OF CONTRACT 1 l 3

a.unct ivc o^2 c

4. ncovisn ione vaceiasc ua. no.
5. eao4cci no. %%7-

,,umouueooa.cauou r<o.

APR 3 0 luJ33 RES-92-063, dtd 4/19/63 RES-C93-330

' Four (4)

7. AouthesT nc y direchersheatseni st l
6. essuco esY Ej U.S. fluclear Regulatory Commission Division of Contracts & Property Management Washington, DC 20555 waE ANo AoonEss ce coNTRACwR ave.,so.re.

o.ss.ue-4 za C.so q,g.A. AMENoMmT or souC TATeoM %

Science Applications International Corporation AlTH: Betty J. Muzio onTw 4xsmwm j

1710 Goodridge Drive P.O. Box 1303 a.A.Mooer CANON oc coNTRm

~

McLean, Viriginia 22102 f=-inal Investigator /Tadmical I

NRC-04-92--063 stact:

W1114= E. Veselv

      • .oRTEof*88 a " m fenhema No. (614) 793-7600 Maria 6,1992 j

ce iFACIUTYCODE 11.THtS fTET.t ONLY APPUES TO AMENDMENTS OF SOUCfTATIONS l TemabovesmanbsvedseEdesdonkemended.assetfersin seem14.31mhouranddoesspeaanar( remesistofOtters

~

d.d.

  • re snust admoudados seestpt of shls amendsnent prior to che hourand does spedGed In the seEdesden er as amended,tr one of the foEoulas anseheds:

e esples et she

  • ehe er Neessiptof shishe'nesseesteresener ensudsdes semas e and 15.end seawakiser Gi$ er esperses esteer er tesesrent emedde Indudas e esserence to Wie seEdessen strTO 8E HECGIVED ATTHE Pt. ACE DESIGNATED POR TIE ftECEIPTOF OfTGtS Pet 00RTO THE HOUR AfD DATESPEC REJECT 3ON OF YOUR OfEEIt. If br tirons of shls W wnsdedse tochases enefter m ma6egenesenertoesadel'ircelayasser er,peesededens esseremier tsaaranskes suEmones to Was =am ea a8a= and 9ds== e==.* end as pdores ese apenho tourendeses oposited.

ACODUNTING AND Ca- -".TvGH DATA fEra __ _ "J AMINI OBLI(:A'l1m: $16,755 B&R #:36019201200 FIN #:L2388 APPN i:312D200.360 BOC #:2542 13.THIS ITEM APPUES ONLY TO MODIFICATIONS OF CONTRACTSDROEftS, f7 M00fFIESTHE CONTRA @OftOER NO. AS DESCR18ED IN ITEM 14.

A.YHis CHANGE OnDER R$ 855UED PUR$UANT TOs WW ^^ ) THE C:'"~S SET FOftTH 484 ITEM 14." ** " """ 8N THE --- -

l g

TRACT ORoER NO. ON ITEM SSA.

e SET ITE 4.PU TOTHE 43.3e3(el.

~

C.Yn45 &UPPLEMENTA4. AGRrmradT e5 ENTEREO 8NTO PURSUANT TO AUTHORfTY OFa o.oTueR tsrum are (awsuseeae ene ouemerun N"fm1 agasinent of the parties.

~

IMPORTANT: Contr=w is not, is required to sign tids docxament and retum copies to theissuineOffio8.

-- ' 1' DESCRifHON OF AMENoMENT/MOOIFeCATtoN (Orreed 47 UCFad.e "_ - "'-. '- "W -aude""---*-a*seafect ~'*- eshagg.-

~

See attached.

t 9308250254 930430 l

PDR CONTR NRC-04-92-063 PDR w -

..R.

_e 36A.NAME AND TITLE OF CONTRACTSNG OFFtCER (rype orprinC 15A. NAME ANO 18TLE OF 46GNER (Type orp6nt/

i ficer Mary L t, Coaai.1 1.h -

Betty J. Muzio, Senior Contract Representative n

&4C.OATE aSC.oATE s4GNED 168.

CD ATES

)

APR 3 0 j

15e.

Enon

[

Td) 4/30/93 (s4;nsesse.e(perse eschertsed de etsid,

j gy d ~ U e(comencGw O(tiser#

c STANDARD gM 30 TREY.16421

- =a a* M' sotes

'b

9 i

NRC-04-92-063 Modification No. 4 Page 2 of 3 The purpose of this modification is to 1.) increase the contract ceiling by

$16,755 from $204,087 to $220,842, 2.) incorporate within scope changes to the Statement of Work and 3.) extend the period of performance through June 30, 1993. Accordingly, the contract is hereby modified as follows:

1.

Section B.3. CONSIDERATION AND OBLIGATION--COST PLUS FIXED FEE (JUN 1988) is revised as follows:

a. The total estimated cost to the Government for full performance of this contract is $220,842, of which the sum of $203,541 represents the estimated reimbursable costs, and of which $17,301 represents the fixed fee.
b. The amount obligated by the Government with respect to this contract is $220,842, f

2.

Section C.1.3. SCOPE OF WORK is hereby revised to include Tasks 7 through 10 below:

Task 7.

Relationship of Aoina Information Specific data related to aging shall be identified for active components.

These components and associated aging mechanisms identified in the NPAR 7

reports shall be tied in with the aging data. Demonstrations of these relationships on specific components shall be made including justifications supporting the relationships.

Task 8.

Analytical Effort i

limited analyses shall be performed to demonstrate the effects of these relationships on plant risk. The effects of single and multiple component -

aging consistent with observed aging mechanisms shall be considered. Common i

mode, time dependent aging is an acceptable approach for showing these effects.

Task 9.

Evaluation of Results The results of the analyses shall be evaluated to determine the risk significance of aging associated with components under study. The technical basis for the findings shall be clearly identified and defensible based on l

data, operating experience, and NPAR information used in this effort. Also,

{

to be included, as appropriate, are the effectiveness of test and maintenance intervals for components involved.

j

4 NRC-04-92-063 Modification No. 4 Page 3 of 3 Task 10.

Report Preparation j

Assemble the work of the previous tasks into a letter report. The draft letter report shall be transmitted for NRC review by May 28, 1993.

Following NRC review, a decision will be made by the NRC project manager as to whether the information shall be included in the NilREG/CR containing the Aging Data Analysis Methods and Demonstrations.

If the information will be included in the NUREG/CR, the chapter including the information and NRC comments shall be transmitted to the NRC by June 30, 1993. Otherwise, the final letter report shall be transmitted to the NRC by June 30, 1993.

TRAVEL One trip for one day in early May 1993 - round-trip from Columbus, Ohio, to NRC headquarters to discuss. status and accomplishments of this program.

3.

Section F.6 is deleted in its entirety and replaced with the following:

The coritract period shall commence on March 6,1992 and shall expire on June 30, 1993.

A summary of obligations for this contract, from award date through the date of this action is given below:

Iotal FY92 Obligation Amount $204,087 Total FY93 Obligation Amount $ 16,755 Cumulative total of NRC obligations $220,842 This modification obligates $16,755 in FY93 funds.

All other terms and conditions remain the same.