w f
kn ur F
L 4
UNITED STATES p
.{
j NUCLEAR REGULATORY COMMISSION t
's WASHINGTON, D.C. 2055M1001 l
APR 2 21993 i
b Science & Engineering Associates, Inc.
Attn:
Ilene Colina, Contract Administrator SEA Plaza 1
6100 Uptown Blvd., NE Albuquerque, New Mexico 87110 l
Subject:
Task Order No. I entitled, " Computer Program to Process Strong
.[
Ground Motion Data", Under Contract No. NRC-03-93-030 r
E
Dear Ms. Colina:
In.accordance with Section G.4, Task Order Procedures, of the subject contract, this letter definitizes task o: der number I with an established ceiling of $80,615.00. This effort shall be performed in accordance with the enclosed statement of work, the contractor's proposal dated March 1, 1993, and best and final offer dated 3/25/93, incorporated herein by reference.
The period of perfornance for task order number 1 is May 3,1993 through l
November 3,.1993. The total cost ceiling is $80,615.00 of which the sum of l
i
$75,777.00 represents the estimated reimbursable. cost, the sum of $140.00 represents facilities capital cost of mor,ey, and the sum of $4,698.00 represents the fixed fee.
[
Funds in the amount of $55,000.00 for this task order have been obligated on the basic contract, of which $51,643.00 represents the estimated cost, and of which $3,?57.00 represents the fixed fee.. It is anticipated that the amount currently allotted will cover performance of the contract through October 21, i
1993. For further provisions on funding, see the clause FAR.52.232-22, Limitation of Funds, incorporated in the contract.
Thet following individusls are considered to be essential to the successful
. performance of the work hereunder: Mr. Gilbert Zigler, Mr. William Bernahl, and Dr. Kenneth Campbell. The contractor agrees that such personnel shall not be removed from the effort under the task order without compliance with j
contract clause H.1, Key Personnel.
1 Your contacts during the course of this task o: der are:
Technical Matters:
Lawrence Ruth, Project Off. :er Telephone:
(301) 504-1211 Contractual Matters:
Catherine Hiltner, Contract Administrator Telephone:
(301) 492-4291 3,
k,jl-9308250012 930422
,f
l 4
The issuance of this task order does not amend any terms or conditions of the subject contract including the contract ceiling amount of $649,734.00.
Please indicate your acceptance of this task order by having an official authorized to bind your organization execute three copies of this document in the space provided and return two copies to the Contract Administrator at the following address:
U. S. Nuclear Regulatory Commission Division of Contracts and Property Management Contract Administration Branch No.1, P-902 Attn: Catherine Hiltner 7920 Norfolk Avenue Bethesda, Maryland 20814 You may retain the third copy for your records.
Sincerely, m% %M Mary Lynn Scott, Contracting Officer Contract Administration Branch No. 1 Division of Contracts and Property Management Office of Administration
Enclosure:
As stated ACCEPTED:
L4.)
"batu a L a se u u Title 6/a/93
~
Date t
r
j,.....,
STATEMENT OF WORK TASK ORDER 93-01 UNDER FIN E-2073 TITLE:
Computer Program to Process Strong Ground Motion Data Project Manager:
Larry Ruth, PMSB (301) 504-1211 Technical Monitor:
Phyllis Sobel, ECGB/DE (301) 504-2738 FIN:
E-2073 B&R No.:
320-19-15-09-0 Tac No:
M84860 NRR Priority No:
2 BACKGROUND Significant amounts of strong ground motion data have become avai?able in recent years.
In the eastern U.S. these ground motion data sugges? that for moderate size nearby earthquakes the Regulatory Guide 1.60 spectral shape may be too conservative at low frequencies and not conservative enough at high frequencies. The NRC staff needs a software package to i
process ground motion recordings to obtain response spectra for comparison to the tegulatory Guide 1.60 spectra and other standard i
spectral shapes. The staff can then recommend possible changes in Regulatory Guide 1.60.
OBJECTIVE The objective of this task order is to obtain technical assistance from SEA in the field of processing ground motion data to develop a software package for use on NRC computers to process stre.1g ground motion recordings. The products will be a data base of sample strong ground motion recordings and a software package to read, correct and analyze the data.
TECHNICAL AND OTHER SPECIAL OUALIFICATIONS REOUIRED SEA is to provide up to two experts with background and experience in 4
processing strong ground motion data and developing computer software.
It is the responsibility of the contractor to assign technical staff, employees, subcontractors, or specialists who have the required educational background, experience, or combination thereof to meet both the technical and regulatory objectives of the work specified in this 50W. The NRC will rely on representations made by the contractor concerning the qualifications of the personnel assigned to this task order including assurance that all information contained in the technical and cost proposals, including resumes, is accurate and truthful.
1
e WORK REOUIREMENTS AND SCHEDULE Tasks Scheduled Completion 1.
f.ollection of strona around motion data I
a.
Prepare for and travel to NRC Four weeks from headquarters to discuss the types initiation of work l
of recordings to be collected and on this task order.
e deta is of the software to oe b.
Collect samples of North American Within four weeks accelerometer data from all available after completion sources (i.e. U.S. Geological Survey, of task order la.
Canadian Geological Survey, California Division of Mines and Geology).
c.
Prepare a technical letter report l
summarizing the sample data base and detailing the proposed software package.
(1)
Prepare draft report.
Within three weeks after completion of task order Ib.
(2)
Incorporate NRC comments Within one week in final report, after completion of task order Ic(1).
2.
Software Packaae
{
a.
Develop a software package to Within eight weeks read the strong motion recordings, after completion correct the recordings for instrument of task order Ic.
response and any other appropriate i
corrections, generate response spectra (at 0, 2, 5 and 7 percent damping) i and statistically analyze the data (i.e. produce the 15th, 50th and 84th percentiles of a subset of data).
Test the performance of the software package and make any adjustments needed to ensure its operability.
b.
Prepare a technical letter report (1)
Prepare draft report.
Within three weeks after completion of task order 2a.
2
1 l
(2)
Incorporate NRC comments Within one week in final report.
after completion of task order 2b(1).
t 3.
Install Software Packaae c.
Travel to NRC headquarters to Within two weeks i
provide, install and demonstrate on after completion NRC computers the software package of task order 2b.
and to provide the User's Manual for the software package.
l t
LEVEL OF EFFORT The level of effort is estimated at 50 professional staff days, i
apportioned among the tasks for planning purposes as follows:
l h
Task level of Effort (dayst i
- 1. a.
6
- 1. b.
6
- 1. c.
6 Total task 1.
18 1
1
- 2. a.
20
- 2. b.
9 j
Total task 2.
29 h
3.
3 i
TOTAL 50 days PERIOD OF PERFORMANCE l
The period of performance is projected to be seven months from initiation of work.
DELIVERABLES Technical Reportina Reouirements All draft reports are to be submitted to the Technical Monitor 'with a copy provided to the Project Manager and all final reports are to be submitted to the Project Manager with four copies to the Technical 1
Monitor.
1.
At the completion of task 1.
c., submit draft and final technical letter reports that contain a summary of the sample data base and a description of the proposed software package.
3 1
l ** $
4 h
2.
At the completion of task 2.
b., submit draft and final technical letter reports that contain (1) the original accelerometer records, the i
corrected records, and associated response spectra and (2) a User's Hanual containing a description and printout of the software program.
l 3.
At the completion of task 3, provide the software package.
j MEETINGS AND TRAVEL l
i for task 1.
a., two one-person two-day trips to NRC headquarters.
.l For task 3, one one-person three-day trip to NRC headquarters.
NRC FURNISHED MATERIALS None.
1 OTHER APPLICABLE INFORMATION The work specified in this 50W is not license fee recoverable.
Development of the computer program must be in compliance with NRC
~
Bulletins 0904-1, 0904-2 and 0904-4 and NUREG/BR-0161.
4
...;r MILESTONES FOR REPORTING PROGRESS IN THE MONTHLY BUSINESS LETTER REPORT-Tasks Planned Revised Actual Completion Completion Completion Date Date Date la. Meet with NRC lb. Collect samples of data Ic.(1) Draft report Ic.(2)
Final report 2a. Develop software package 2b.(1) Draft report 2b.(2)
Final report 3.
Install software 5