ML20056D923
| ML20056D923 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/02/1993 |
| From: | Hood D Office of Nuclear Reactor Regulation |
| To: | Mccoy C GEORGIA POWER CO. |
| References | |
| IEB-93-002, IEB-93-2, TAC-M86630, TAC-M86631, NUDOCS 9308190015 | |
| Download: ML20056D923 (2) | |
Text
c August 2, 1993 v
o Docket Nos. 50-424 DISTRIBUTION and 50-425
-Docket File OGC NRC/ Local PDRs ACRS(10)
Mr. C. K. McCoy PDII-3 Reading E.Merschoff, RII Vice President - Nuclear S.Varga J.Hickman Vogtle Project G.Lainas R.Barrett Georgia Power Company D.Matthews R. Woodruff P. O. Box 1295 D. Hood Birmingham, Alabama 35201 L. Berry
Dear Mr. McCoy:
SUBJECT:
RESPONSE TO NRC BULLETIN 93-02, " DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. M86630 AND M86631)
This letter acknowledges receipt of your response dated June 3, 1993, to NRC Bulletin 93-02 (Bulletin).
The Bulletin was issued May 11,1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment not designed to withstand a LOCA, take any necessary compensatory measures, and remove any such material.
Your response stated that no fibrous filter material, such as described in the Bulletin, was identified as being used or stored in your containment.
Your conclusion is based upon a review of the data sheets from associated procedures that require thorough inspections inside containment before returning to power after a refueling outage.
These data sheets were reviewed for the most recent outages for both Vogtle units and confirmed the removal of debris from the containments.
Based on your conclusion, we consider your actions to be i
complete.
Please retain any records of your actions in response to this Bulletin, as subscquent inspection activities may be conducted in regards to this issue.
'Should you have any questions, please contact me at (301) 504-3049 or the lead Project Manager for this issue, John B. Hickman, at (301) 504-3017.
Sincerely, ORIGINAL SIGNED BY:
Darl S. Hood, Project Manager Project Directorate II-3 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation cc:
see next page PDII-3/(A )
PDII-3/PM LPfr)75F/65Ih33D OFFICE L.BERRf D. HOOD.MN J3ICKMANJ.MTTkEWS 7/N93 7 /2.0 /93 7 /2 7/93 I 7/28/93 N
0FFICIAL RECORD COPY FILE NAME: G:\\V0GTLE\\V0G9302.LTR 9308190015 930802 PDR ADOCK 05000424 h
p
( (4J I.
u.
it Mr. C. K. McCoy Georgia Power Company Vogtle Electric Generating Plant LL cc:
Mr. J. A. Bailey Harold Reheis, Director Manager Licensing Department of Natural Resources Georgia Power Company 205 Butler Street, SE. Suite 1252 P. O. Box 1295 Atlanta, Georgia 30334 Birmingham, Alabama 35201 Attorney General ~
Mr. J. B. Beasley Law Department General Manager, Vogtle Electric 132 Judicial Building Generating Plant Atlanta, Georgia 30334 P. O. Box 1600 Waynesboro, Georgia 30830 Mr. Alan R. Herdt Project Branch #3 Regional Administrator, Region II U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 101 Marietta Street, NW., Suite 2900 Atlanta, Georgia 30323 i
Atlanta, Georgia 30323 Mr. Dan H. Smith, Vice President Office of Planning and Budget Power Supply Operations Room 615B Oglethorpe Power Corporation 270 Washington Street, SW.
2100 East Exchange Place Atlanta, Georgia 30334 Tucker, Georgia 30085-1349 Office of the County Commissioner Charles A. Patrizia, Esquire Burke County Commission Paul, Hastings, Janofsky & Walker Waynesboro, Georgia 30830 12th Floor 1050 Connecticut Avenue, NW.
Mr. J. D. Woodard Washington, DC 20036 Senior Vice President -
Nuclear Operations Art Domby, Esquire Georgia Power Company
_Troutman Sanders P. O. Box 1295 600'Peachtree Street Birmingham, Alabama 35201 NationsBank Plaza Suite 5200 Atlanta, Georgia 30308-2210 Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 572 Waynesboro, Georgia 30830 u
.