+W Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 August 11, 1993 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report July. 1993 Attached is the Monthly Operating Report for July,1993 for the Monticello Nuclear Generating Plant.
)
/
](
b
%4%
er O Anderson Director Licensing and Management Issues Director, Office of Resource Management c:
Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment
/
I l-9308170406 930731 PDR R.
ADOCK 05000263 "i
h PDR Q
- - - - - - - - - - - - - - - - - - - ~ _ _ _. _ _ _ _ - -
q
~ OPERATING DATA' REPORT DOCKET NO.
50-263 DATE 8-2-93 l
l COMPLETED BY H. H. Paustian-TELEPHONE 612/295-5151
]
OPERATING STATUS
] Notes
.. ]
j 1.. Unit Name :
Monticello
]
]
- 12. Reporting period:
July
_]
]
- 13. Licensed Thernal Power (MNt):
1670
]
]
~4. Nameplate Rating (Gross MWe):
569
]
]
- 5. Design Electrical Rating (Net MWe):
545.4. ]
]L 16-, Maximum-Dependable Capacity (Gross MWe): __564
]
-]
f
- 7. Maximum Dependable Capacity (Net MWe):
536
]
]-
- 8. If Changes Occur in Capacity Ratings (Itens Number 3 Through 7) Since Last j
Report, Give Reasons:
r
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVEJ 11.. Hours In Reporting. Period 744 5087 193608':
l
- 12. Number Of Hours Reactor Was Critical 722.6 3728.6
'155713.3 1
- 13. Reactor Reserve Shutdown Hours-0.0
- 0. 0_
940.7-
-14. Hours' Generator On-Line 722.6
.3678.4 152954'.6'
- 15. Unit Reserve Shutdown Hours 0.0' O.0 0 :01' 16.-Gross Thermal Energy. Generated (MWH)'
1188523-5818873
_235212286:
i
- 17. Gross Electrical Energy GeneratedL(MWH)- 400179 1972684-79503484 f
- 18. Net Electrical Energy Generated-(MWH) ~ 382388 1889610 76045497 i
- 19. Unit Service Factor 97.1%
72.3%-
79:0%
20.. Unit Availability Factor-97.1%
72.3%
79.0%
2:1. Unit Capacity Factor (Using MDC Net) 95.9%
69.3%
73.3%:
- 22. Unit' Capacity Factor-(Using. DER Net) 94.2%
68.1%-
72.0%
- 23. Unit Forced Outage Rate 2.9%
2.2%
_3.7%'
124. Shutdowns Scheduled Over Next 12. Months (Type,-Date, and Duration of.Each)
{
- None
)
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A-3
- 26. Units'In Test Status (Prior.to Commercial Operation): N/A Forecast Achievedf 1
INITIAL _ CRITICALITY y
INITIAL ELECTRICITY-COMMERCIAL-OPERATION i
j 1
AVERAGE DAILY-UNIT POWER LEVEL
- i e.
DOCKET NO.
50-263 UNIT Monticello__
DATE 8-2 COMPLETED BY H. H.
Paustian i
TELEPHONE. 612/295-5151 MONTH OF July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.
(MWe-Net)
(MWe-Net) 1 546.
17 534.
2 544.
18 532.
3 545.
19 533.
4 545.
20 533.
5 543.
21 535.
6 542.
22.
535.
7 --
542.21-537 8
-543.
24 454.
9 542.25-361.
10' 540.
26 537.
'11 542.
27' 527.12-536.
28 536.
13 535.
29 536.
14 538.
30 535.
~15 539.
31 48.
16 535.
' INSTRUCTIONS On this' format, list the average. daily' unit' power level in'MWe-Net'for each
-day in the reporting month.
Compute-to the nearest-whole megawatt.
F-
. 4
' NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO, 50-263 DATE 8-2-93 COMPLETED BY H. H. Paustian L
TELEPHONE 612/295-5151 MONTH JUL 7-1-93 to Power operation.
7-24-93 7-24-93 to Power reduced to 30% to clean condenser tubesheets.
7-25-93 7-25-93 to Power operation.
7-31-93 7-31-93 Reactor scram on level due to condensate pump trip.
Note: Power. operation defined as essentially 100%'of rated' power except for weekend-load _ drops.for
-specified surveillance testing.
-)
e
8 UNIT SHiTID0VNS AND POWER REDUCTIM4S D00GT NO.
50-263-UNIT BAME 'lionticello DATE -1)8-05-93 COMPLETED BY -11. H. Pauscian REPORT MONTH July TELEPHONE 312/295-5151 ~~
I No.
-Date Type Duration Reason Method-LER System Comp.
Cause & Corrective (1)
(hours)
(2) of No.
Code Code Action to Shutdown (4)
'(5)
Prevent Recurrence (3) 5 07-24-93 S
0.0 B
4 N/A-SG COND Power reduction to 30% to clean condenser tube
. sheets.
6 07-31-93 F
21.4 A-3 93-008 SD 50 Automatttic reactor scram on level after conden-sate pun p trip via ground fault relay.
- 2 3
4 1
. Forced Reason:
Method:
Draft IEEE Standard F:
S: Scheduled A-Equipment Failure (Explain)-
1-Manual-805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)