Beaer Valley Power Station SNppmgport, PA 15077-0004 5
JOHN D. StEBER (412) 393-5255 Senior Vice President and Fax (412) 643-8069
[
Chief Ntc4 ear Officer Nuckar Pover Dmsion I[#7!
U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
.t
Subject:
Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Emergency Core Cooling Systems Reanalysis Schedules t
?
In a
letter dated July 13, 1993, we were requested to provide a schedule for reanalysis of several limiting Loss-of-Coolant Accidents (LOCA) or to provide clarification justifying compliance with the requirements of 10 CFR 50.46(a).
The requested clarification was provided in a
meeting. with NRC staff on August 5, 1993.
- However, f
1 since_ LOCA reanalyses have been in progress during the time period of
- interest, the following additional information is provided in response to your letter.
The BVPS-1 Small-Break LOCA reanalysis has been completed.-
+
The BVPS-2 Small-Break LOCA reanalysis is in progress and will be completed during 1993.
The BVPS-2 Large-Break LOCA reanalysis is in progress and will be completed during 1993.
Results of these analyses will' be provided through idle appropriate reporting methods.
' Sincerely,
- 3. D.
Sieber cc:-
'Mr.
L. W.
Rossbach,'Sr.-Resident Inspector Mr.
T. T. Martin, NRC Region I Administrator Mr. G.
E.
Edison, Project Manager ELECTRK l
UTtuTYof 93081704o1 930817 NE YEAR
=
DR ADOCK.05000334 flgb PDR y
\\