Monthly Operating Rept for July 1993 for Waterford 3.W/
ML20056D655
Person / Time
Site: Waterford 
Issue date: 07/31/1993
From: Burski R, Wiegert E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-93-0168, W3F1-93-168, NUDOCS 9308170274
Download: ML20056D655 (7)


Text

. - - _ - - -_-

9 ENTERGY ETA """ " '"*'

M ona LA 70060

' 6 5M 739 6774 1

R. F. Burski n,. :n r+ wv94ev l

Aut rtt7rd 3 W3F1-93-0168 A4.05 PR August 12, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of July,1993. This report is submitted per Section 6.9.I.6 of the Waterford 3 Technical-Specifications for Facility Operating License No. NPF-38.

Very truly yours, t

R.F. Burski l

Director Nuclear Safety RFB/TSB/ssf Attachment-cc:

J.L. Milhoan, (NRC Region IV), D.L. Wigginton (NRC-NRR),

R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data-Institute, Inc.), J.T. Wheelock (INP0 Records Center),

NRC Resident Inspectors Office

/1 lf I

9308170274 930731

~ II PDR. ADDCK 050003G2 E

R, PDR

i 1y n

-)

I NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS

^1 WATERFORD 3 i

JULY 1993 The unit operated at an average reactor power of 99.65% and experienced. no shutdowns or significant power reductions during the period.

-i r

q i

I t

1 4

I i

.J I

.:2 -

a'.

1 t

i 1

..i PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 q

t During the month of July 1993, there were no pressurizer safety valve failures or challenges.

4 h

ij i

)

l l

.l i

-i 1

I

-~

r, OPERATING DATA REPORT c.

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: AUGUST,1993 COMPLETED BY:

E. G. WlEGERT TELEPHONE: 504-739-6446 OPERATING STATUS 1.

Reporting Period: July,1993 Gross Hours in Reporting Period: 744

.2.

Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 3.

Power Level to which Restricted (if any) (Net MWe): N/A

.t 4.

Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE 5.

Number of Hours Reactor was Critical 744.0 5,034.0 57,427.0 6.

Reactor Reserve Shutdown Hours 7.

Hours Generator was On-line 744,0 5,019.0 56,615.2' 8.

Unit Reserve Shutdown Hours -02 9.

Gross Thermal Energy Generated (MWH) 2,513,308 16,936,141 186,603,194 j

10. Gross Electrical Energy Generated (MWH) 813.490 5,532,860 62,394,330
11. Net Electrical Energy Generated (MWH) 775.798 5,289,091 59,460,708-

-l

12. Reactor Service Factor

-100.0 99.0 83.4 i

13. Reactor Availability Factor 100.0 99.0 83.4 14; : Unit Service Factor 100.0' 98.'7 82.3
15. Unit Availability Fector 100.0 98.7 82.3
16. Unit Capacity Factor jusing MDC) 97.0-96 7 80.4 G ~

1 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: AUGUST,1993

=

COMPLETED BY:

E. G. WlEGERT TELEPHONE: 504-739-6446 QPERATING DATA REPORT (Con't)

17. Unit Capacity Factor (Using DER) 94.5 94.2 78.2
18. Unit Forced Outage Rate 1.3

' 3.7 19.

Shutdowns Scheduled over next 6 Months (type, date and duration of each):

N/A 20.

If Shutdown at end of report period, estimated date of startup: N/A 21.

Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE

22. Hours in Reporting Period 744.0 5,087.0 68,832.0 I
23. - Unit Forced Outage Hours 0.0 68.0 2,178.7

?

'b 24.

Nameplate Rating (Gross MWe): 1200 25.

If Changes Occur in Capacity Ratings (ltems Number 2 and 24) Since Last Report, Give Reasons: N/A 1

l l

?

r 1

i AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3

-l DATE OF REPORT: AUGUST,1993 COMPLETED BY:

E. G. WlEGERT l

TELEPHONE: 504-739-6446

{

l MONTH JULY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

. MWe-Net)

(

1 1051 17 1047 2

1043 18 1048 i

3 1036 19 1047 4

1029 20 1046 5

1036 21 1046 6

1045 22 1003 7

1050 23 1026 j

r 8

1049 24 1043 9

1048 25 1043 10 1048 26 1045 i

11 1048 27 1044 12 1049 28 1035 13 1048 29 1041 14 1049 30 1043 15 1045 31 1044 16 1049 INSTRUCTIONS I

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

1 I

^b u

, :p

. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME:' WATERFORD 3 DATE OF REPORT: AUGUST,1993 COMPLETED BY:

E. G. WlEGERT TELEPHONE: 504-739-6446 REPORT FOR JULY.1993 Type Method of Shutting F = Forced Duration Down the Reactor or Cause, Comments and Number D. ale S....= Scheduled (Hours)

Reason (1)

Reducino Power (2)

Corrective Actions

~

NONE (1) REASON (2) METHOD Equipment Failure (explain) 1 Manual A

=

=

Maintenance or Test.

2 Manual Scram B

=

=

C=

Refueling 3=

Automatic Scram Continuation from Previous Period D=

Regulatory Restriction 4

=

~E=

' Operator Training and 5

Power Reduction

=

License Examination 6=

Other (explain)-

F=

Administrative Operational Error (explain)

G

=

Other (explain)

-H

=

1

_,..w.--

+.. -,

. $.w.-, -,,

.-,s

..m-.

mm s.m-..m %.

..m

.m' m..