Text

-

1 1

J WOLF CREEK

~

' NUCLEAR OPERATING CORPORATION Otto L Maynard August 11, 1993 l

Vce President Plant Operatrcins WO 93-0149 U.

S. Nuclear Regulatory Commission

]

ATTN: Document Control-Desk 1

Mail Stat!.on P1-137 "i

Washington, D. C.

20555

Subject:

Docket No. 50-482:

July, 1993, Monthly Operating Report 1

l Gentlemen:

1 Attached is the July, 1993, Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accordance with the i

requirements of Technical Specification 6.9.1.8.

q Very truly yours, l

4-

/

i Otto L. Maynard i

Vice President Plant Operations OLM/jan Attachment cc:

W. D. Johnson (NRC), w/a-J. L. Milhoan _ (NRC), w/a G. A. Pick (NRC), w/a W. D. Reckley. (NRC), w/a -

.. j

1.

I 4

1 ii h,l PO. Box 411/ Burhngton, KS 66839 / Phone. {316) 364-8831 I

9308170215 930731 i

' An tavat opportunny cmpiover u T/scevn

('I

- DR ADOCK 05000482 k

_ g PDR j-

.j

i Attachnent 1 to NO 93-0149

-1 l

I I

1.

1 l

l NOLF CREEK NUGEAR OPERATIIG CORPORATION i

NOLF CREEK GENERATIIG STATION

}OmILY OPERATIIG REPORT 1

Matmi:

JULY YEAR:

1993 j

Docket Ib.: 50-482 1

1 Facility Operating License No.: IFF-42 j

Report 16.101 1

4 1

l Prepan3d b :

f Merlin G. Williams

'l I

-1 1

I

L 1

Attachnnnt'l to No 93-0149 i

SUMVM Y

'1he follcwing report highlights the operating experience of Wolf Creek Generating Station for the nanth of July,1993. 'Ihis report is being provided pursuant to 'Dechnical Specification 6.9.1.8.

I.

SLFFARY OF OPERATIIG EXPERIDCE l

'1he unit operated at or near 100% guer throughout the nonth of July.

II. MAJOR SAFETI REATED MAINIDWCE ACTIVITIES No unjor safety related nalntenance activities were perfonted during the nonth of July.

I l

l l

l s

i I

i l

i 1

Wolf Creek Generating Station Monthly Operating Report July 1993 Page-1 of 5 l

\\

l

'I

3 Attachnent 1 to NO 93-0149 I

1 OPERATIlU DATA PIPORT D0uu:.T 10.

50-482 NOLF CREEK GENERATI!G STATIO4 NOLF CREEK NUGIAR OPERATIIG CCEPORATIQi DATE 08-06-93 CQ4PLETED BY M.-Williams TELEPHONE 316-364-8831 OPERATIIG STA'IUS i

i 1.

Reporting Period:

July, 1993 Gross Hours in Reporting Period: 744 l

2.

Currently Authorized Power level (MNt): 3411 Max. Depend. Capacity (MNe-Net): 1131 Design Electrical Rating (IMe-lbt):

1170 3.

Iber Invel to Which Restricted (If Any)(MNe-Net):

N/A l

4.

Reasons for restriction (If Any):

N/A

'Ihis Month Yr. to Date Cumulative 5.

Number of 1 burs Reactor was Critical 744.0 3,386.9 54,689.4 6.

Reactor Reserve Shutdown Iburs 0.0 0.0 339.8 7.

Hours Generator on Line 744.0 3,328.6 53,980.4 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross 'Ihernal Energy Generated (MWH) 2,535,510 11,219,795 176,748,930 F

10. Gross Electrical Energy Generated (MNH) 877,256 3,902,997 61,495,614
11. Ibt Electrical Energy Generated (MWH) 841,042 3,713,881 58,660,010
12. Reactor Service Factor 100.0 66.6 78.9
13. Reactor Availability Factor 100.0 66.6 79.4
14. Unit Service Factor 100.0 65.4 77.9
15. Unit Availability Factor 100.0 65.4 77.9
16. Unit Capacity Factor (Using MDC) 99.9

-64.6 74.8

j
17. Unit Capacity Factor (Using Design MWe) 96.6 62.4 72.3
10. Unit Forced Outage Rate 0.0 0.0 6.1
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): N/A
20. If Shut Down at End of Report Period,- Estinated Date of 'Startup:

N/A Wolf Creek Generating Station Monthly Operating Report July 1993 Page 2 of 5

l 1

l Jittachment 1 to 10 93-0149 I

AVERAGE DAILY UNIT IDER LEVEL Dot.ht.T 10. _50-482 NOLF GEEK GEtERATIIG STATION NOLF CREEK NUCLEAR OPERATIIG CmPORATION DATE 08-06 -

OWPIETED BY M. Williams TELEPHONE 316-364-8831

. MONIH July, 1993 DAY AVERAGE DAILY POWER ILVEL DAY AVERAGE DAILY POWER LEVEL

-)

(MWe-Ibt)

(MNe-lbt)

)

1 1129 17 1130 2

1132 18 1129 3

1132 19 1128 1

l 4

1134 20 1126 i

l-l 5-1136 21 1127

]

6 1137 22 1130 7

1138 23 1128 j

G 1137 24 1128 9

1136 25 1127 y

10 1134 26 1125'

'11 1134 27 1126 i

'12 1134 28 1126 13 1132 29 1126 14 1132 30 1127 15 1132 31 1125

-i 16-1130 1

Wolf Creek Generating Station Manthly Operating Report July 1993 Page 3 of 5 i

. to WO 93-0149 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.

50 482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 08-06-93 COMPLETED BY M. Williams REPORT MONTH July. 1993 TELEPHONE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /C0ttfENTS No Date St SCHEDULED (HOURS)

(1)

OR REDUCING POWER (2)

SUlttARY:

The unit operated at or near 100% power throughout the month of July.

'1)

REASON: At EQUIPMENT FAILURE (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.

MANUAL SCRAM C: ' REFUELING ~

G: OPERATIOFAL ERROR (EXPLAIN) 3.

AUTOMATIC SCRAM D: REGULATORY RESTRICTION ~

H: OTHER (EXPLAIN) 4.

CONTINUED 5.

REDUCED LOAD 9.

OTHER Wolf Creek Generating Statien Monthly Operating Report July 1993 Page 4 of 5

iAttA t 1 to NO 93-0149 NOLF CREEK NULLEAR OPERATIIG CORPORATICN NOLF CREEK GD4ERATI!G STATICH E

/?)lt UNIT 10.1 cf f E.

MONIH July, 1993

SUMMARY

OF OPERATIIG EXPERIDCE Idstal below in chronological sequence is a sunnary of operating experiences for this month Valch required load reduction or resulted in significant non-load related incidents.

DATE TIME EVDir l

July 1, 1993 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% power.

j July 31, 1993 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100% power.

l 1

Wolf Creek Generating Station Manthly Operating Report

' July 1993 Page 5 of 5

_ - _ _ _ _ _ - _