Monthly Operating Rept for Jul 1993 for WCGS
ML20056D628
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/31/1993
From: Maynard O, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-93-0149, WO-93-149, NUDOCS 9308170215
Download: ML20056D628 (7)


Text

- -

1 1

J WOLF CREEK

~

' NUCLEAR OPERATING CORPORATION Otto L Maynard August 11, 1993 Vce President Plant Operatrcins l WO 93-0149 U. S. Nuclear Regulatory Commission ]

ATTN: Document Control-Desk 1 Mail Stat!.on P1-137 "i '

Washington, D. C. 20555

Subject:

Docket No. 50-482: July, 1993, Monthly 1

Operating Report l

Gentlemen: ,

1 Attached is the July, 1993, Monthly Operating Report for Wolf Creek ..

Generating Station. This submittal is being made in accordance with the i requirements of Technical Specification 6.9.1.8. q Very truly yours, ._

l 4- /

i Otto L. Maynard i Vice President Plant Operations OLM/jan Attachment cc
W. D. Johnson (NRC), w/a-J. L. Milhoan _ (NRC) , w/a G. A. Pick (NRC), w/a W. D. Reckley . (NRC) , w/a -

.. j

1. !

I 4

1 ii h ,l PO. Box 411/ Burhngton, KS 66839 / Phone. {316) 364-8831 -

I  :

- 9308170215 DR ADOCK930731 05000482 i ' An tavat opportunny cmpiover u T/scevn '. .

('I

' _g PDR k

j-

.j

i

. Attachnent 1 to NO 93-0149 -1 l

l I

I I

1. 1 l l NOLF CREEK NUGEAR OPERATIIG CORPORATION i

NOLF CREEK GENERATIIG STATION

}OmILY OPERATIIG REPORT 1

Matmi: JULY YEAR: 1993 j Docket Ib.: 50-482 ,

1 1

Facility Operating License No.: IFF-42 j Report 16.101 1

4 1

l Prepan3d bf: -l Merlin G. Williams

'l I

-1 1

I I

L 1 -

. Attachnnnt'l to No 93-0149  ;

i SUMVM Y

'1he follcwing report highlights the operating experience of Wolf Creek Generating Station for the nanth of July,1993. 'Ihis report is being  ;

provided pursuant to 'Dechnical Specification 6.9.1.8.

I. SLFFARY OF OPERATIIG EXPERIDCE l '1he unit operated at or near 100% guer throughout the nonth of July. .

II. MAJOR SAFETI REATED MAINIDWCE ACTIVITIES No unjor safety related nalntenance activities were perfonted during the  ;

nonth of July.

I l

l l

l s

i I

i l  !

i 1

,. Wolf Creek Generating Station  :

Monthly Operating Report .!

July 1993 Page-1 of 5  !

l

\

l

'I;

3 Attachnent 1 to NO 93-0149 I 1

OPERATIlU DATA PIPORT D0uu:.T 10. 50-482  :

NOLF CREEK GENERATI!G STATIO4 ,

NOLF CREEK NUGIAR OPERATIIG CCEPORATIQi DATE 08-06-93 CQ4PLETED BY M.-Williams TELEPHONE 316-364-8831 OPERATIIG STA'IUS i i

1. Reporting Period: July, 1993 Gross Hours in Reporting Period: 744 l
2. Currently Authorized Power level (MNt): 3411 Max. Depend. Capacity (MNe-Net): 1131 Design Electrical Rating (IMe-lbt): 1170 -
3. Iber Invel to Which Restricted (If Any)(MNe-Net): N/A l
4. Reasons for restriction (If Any): N/A  !

'Ihis Month Yr. to Date Cumulative

5. Number of 1 burs Reactor was Critical 744.0 3,386.9 54,689.4
6. Reactor Reserve Shutdown Iburs 0.0 0.0 339.8  ;
7. Hours Generator on Line 744.0 3,328.6 53,980.4
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross 'Ihernal Energy Generated (MWH) 2,535,510 11,219,795 176,748,930 '

F

10. Gross Electrical Energy Generated (MNH) 877,256 3,902,997 61,495,614
11. Ibt Electrical Energy Generated (MWH) 841,042 3,713,881 58,660,010
12. Reactor Service Factor 100.0 66.6 78.9  !
13. Reactor Availability Factor 100.0 66.6 79.4
14. Unit Service Factor 100.0 65.4 77.9
15. Unit Availability Factor 100.0 65.4 77.9
16. Unit Capacity Factor (Using MDC) 99.9 -64.6 74.8 ;j
17. Unit Capacity Factor (Using Design MWe) 96.6 62.4 72.3
10. Unit Forced Outage Rate 0.0 0.0 6.1
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): N/A
20. If Shut Down at End of Report Period,- Estinated Date of 'Startup: N/A .

Wolf Creek Generating Station Monthly Operating Report July 1993 Page 2 of 5

l 1 l .

Jittachment 1 to 10 93-0149 I

AVERAGE DAILY UNIT IDER LEVEL Dot.ht.T 10. _50-482 -l I

NOLF GEEK GEtERATIIG STATION NOLF CREEK NUCLEAR OPERATIIG CmPORATION DATE 08-06 -

OWPIETED BY M. Williams TELEPHONE 316-364-8831

. MONIH July, 1993 DAY AVERAGE DAILY POWER ILVEL DAY AVERAGE DAILY POWER LEVEL -)

(MWe-Ibt) (MNe-lbt) )

I 1 1129 17 1130  !

2 1132 18 1129 3 1132 19 1128 1 l

4 1134 20 1126 i l- l l 5- 1136 21 1127

]

6 1137 22 1130 7 1138 23 1128 j G 1137 24 1128 '

9 1136 25 1127 y

10 1134 26 1125'

'11 1134 27 1126 i

'12 1134 28 1126 13 1132 29 1126 14 1132 30 1127 15 1132 31 1125 l

-i 16- 1130 1

Wolf Creek Generating Station Manthly Operating Report July 1993 Page 3 of 5 i

. to WO 93-0149

  • UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50 482 .

WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 08-06-93 COMPLETED BY M. Williams REPORT MONTH July. 1993 TELEPHONE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /C0ttfENTS No Date St SCHEDULED (HOURS) (1) OR REDUCING POWER (2)

SUlttARY: The unit operated at or near 100% power throughout the month of July.

'1) REASON: At EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: ' REFUELING ~ .

G: OPERATIOFAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION ~ H: OTHER (EXPLAIN) 4. CONTINUED

5. REDUCED LOAD
9. OTHER Wolf Creek Generating Statien Monthly Operating Report July 1993 Page 4 of 5

iAttA t 1 to NO 93-0149 NOLF CREEK NULLEAR OPERATIIG CORPORATICN NOLF CREEK GD4ERATI!G STATICH E

UNIT 10.1

/?)lt MONIH July, 1993 cf E. f

SUMMARY

OF OPERATIIG EXPERIDCE ,

Idstal below in chronological sequence is a sunnary of operating experiences for this month Valch required load reduction or resulted in significant non-load related incidents.

DATE TIME EVDir l

July 1, 1993 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% power. j July 31, 1993 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100% power.

l 1

Wolf Creek Generating Station Manthly Operating Report

' July 1993 Page 5 of 5

_ - _ _ _ _ _ - _