ML20056D507

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-334/93-15 & 50-412/93-16 on 930726-30.One non-cited Violation Identified
ML20056D507
Person / Time
Site: Beaver Valley
Issue date: 08/06/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20056D508 List:
References
NUDOCS 9308170018
Download: ML20056D507 (3)


See also: IR 05000334/1993015

Text

.i

/*L ~. s

bb

3

p

' Docket Nos. 50-334 MS06 Ug

50-412

Mr. J. D. Sieber

Senior Vice President

'

Nuclear Power Division

Duquesne Light Company

-'

Post Office Box 4

Shippingpon, Pennsylvania 15077 -

Dear Mr. Sieber:

SUBJECT: NRC Combined Inspection Nos. 50-334/93-15; 50-412/93-16 l

l

An announced safety inspection of the radioactive waste management and transponation

activities at your facility was conducted by Mr. J. Nick on July 26-30,1993. The results of

this inspection were discussed with you and your staff on July 30,1993.  ;

Areas reviewed during this inspection were imponant to health and safety and am discussed

in the enclosed inspection mpod. Tid findings are based upon inspector observation,

interviews of personnel, and review of records. Areas reviewed included storage of f

radioactive waste, mdioactive waste processing, transponation of radioactive materials,

staffing levels, staff qualifications, training, quality assurance, and relevant procedures.

Your radioactive waste management and transponation program was generally effective in ,

safely disposing of radioactive materials. Areas toured in your facility were well maintained t

and exhibited good housekeeping. The radioactive waste processing was performed by ,

qualified individuals with documented training and qualifications. The assurance of quality,

including audits and surveillances, was comprehensive and detailed. Improvements were

!

noted in the training for radiological controls technicians preparing and documenting

radioactive waste shipments. Minor weakness was noted in the calculation for curie content

of waste containers based upon dose rate measurements and isotopic content.

Within the scope of this inspection, one non-cited violation was identified regarding the  !

improper completion of shipping papers and is described in the attached inspection repon.

This violation was not cited due to its minor safety significance and because of your staff's

thorough efforts in instituting cormctive actions.

,

9308170018 930806 I '

PDR ADOCK-05000334 OFFICIALRECORDCOPY g p. p p.  ;

G PDR j

g jh 1 f qna

a La UV  ;

.

,

u.

--

,

c.:

s.

$ 0 6 1993,

[ Duquesne Light Company - 2

No response to this letter is required. Your cooperation with us in this matter is appreciated.

Sincerely,

MM%

JamesNy r f'

Facilities Radiological Safety .

and Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure:

Inspection Report Nos. 50-334/93-15 and 50-412/93-16

cc w/ encl:

' G. S. Thomas, Vice President, Nuclear Services

D. E. Spoerry, Vice President, Nuclear Operations

L. R. Freeland, General Manager, Nuclear Operations Unit

K. D. Grada,- Manager, Quality Services Unit

N. R. Tonet, Manager, Nuclear Safety Department

H. R. Caldwell, General Superintendent, Nuclear Operations

K. Abraham, PAO (2)

- Public Document Room (PDR)

I.ocal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

E

NRC Resident Inspector

Commonwealth of Pennsylvania

State of Ohio

.

OFFICIAL RECORD COP.Y

L.

...

4

Duquesne Light Company 3 MI6 13 ,

bec w/ encl:

Region I Docket Room (with concurrences)

W. Pasciak, DRSS -

I

bec w/ encl (VIA E-MAIL):

W. Butler, NRR

G. Edison, NRR

V. McCree, OEDO

i

.

,

i

.

,

RI:DRSS '

li

.(

DRSS

J. Nick e. Pasetak J. Joyner

V i

  • i

08/f/93 08/(g/93 08/(p/93

l

1

<

>

'

OFF! 1AL RECORD COPY