Forwards SE Re Util 930316 Transmittal of Reload Safety Evaluation Process for Substitution of Single Stainless Steel Filler Rod for Failed Fuel Rod in One Fuel Assembly. Proposed Approach Acceptable
ML20056D489
Person / Time
Site: Byron Constellation icon.png
Issue date: 07/27/1993
From: John Hickman
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20056D491 List:
References
TAC-M86018, NUDOCS 9308160372
Download: ML20056D489 (2)


Text

-

July 27, 1993

. Docket No. STN 50-454 Mr. D. L. Farrar Manager, Nuclear Regulatory Services Commonwealth Edisor. Company Executive Towers West III, suite 500 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Farrar:

SUBJECT:

BYRON UNIT I, CYCLE 6 FUEL ASSEMBLY RECONSTITUTION (TAC NO. M86018)

By letter dated March 16, 1993, Commonwealth Edison Company transmitted their reload safety evaluation process for the substitution of a single stainless steel filler rod for a failed fuel rod in one fuei assembly for Byron Station Unit I.

We have reviewed your letter describirg tne reload safety evaluation process and find that the proposed approach is acceptable for the Cycle 6 fuel reconstitution as discussed in the enclosed safety evaluation.

Should you have any questions or comments, please contact me at (301) 504-3017.

Sincerely, Original signed by:

John B. Hickman, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w' enclosure:

See next page DISTRIBUfl0N:

l NRC & Local PDRs PDIII-2 r/f l

J. Roe J. Zwolinski J. Dyer C. Moore J. Hickman 0GC ACRS (10)

B. Clayton RIII R. Jones Docket File Y?? %} E5biSt SE rfA RDIII-2 OFC PM:PDIII-2 bK lCJEcw lD:PDIII-2 l

l l

i NAME XMbOR'E lIMCKMAN lJDYER g l

l DATE lQ/g93 l 7 /;z7/93 l7 /2'l/93 l

ql 9308160372 930727 f

PDR ADOCK 05000454 61 P

PDR l

g

r f

Mr. D. L. Farrar By"on Station Commonwealth Edison Company Unit Nos. I and 2 cc:

l Mr. William P. Poirier, Director Ms. Lorraine Creek Westinghouse Electric Corporation Rt. 1, Box 182' Energy Systems Business Unit Manteno, Illinois 60950 Post Office Box 355, Bay 236 West Pittsburgh, Pennsylvania 15230 Douglass Cassel, Esquire 17 East Monroe Street, Suite 212 Joseph Gallo, Esquire Chicago, Illinois 60603 Hopkins and Sutter 888 16th Street, N.W.

Mrs. Phillip B. Johnson Suite 700 1907 Stratford Lane I

Washington, D.C.

20006 Rockford, Illinois 61107 Michael I. Miller, Esquire Attorney _ General Sidley and Austin 500 South 2nd Street One First Natit nal Plaza Springfield, Illinois-62701 Chicago, Illinois 60690 EIS Review Coordinator Mr. Edward R. Crass EPA Region V Nuclear Safeguards and 230 S. Dearborn Street Licensing Chicago, Illinois ~60604 Sargent & Lundy Engineers 55 East Monroe Street Illinois Department of Chicago, Illinois 60603 Nuclear Safety Office of Nuclear Facility Safety U. S.' Nuclear Regulatory Commission 1035 Outer Park Drive Byron Resident Inspectors Office Springfield, Illinois 62704 4448 North German Church Road Byron, Illinois 61010-9750 Commonwealth Edison Company Byron Station Manager-Regional Administrator, Region III 4450 North German Church Road U. S. Nuclear Regulatory Commission Byron, Illinois 61010 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Chairman, Ogle County Board l

Post Office Box 357 Oregon. Illinois 61061 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 i

4 l