|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:Written Event Report (30 or 60 day)
[Table view] |
Text
W$LFCREEK 'NUCLEAR OPERATING CORPORATION
. Ron Benham Manager Nuclear and Regulatory Affairs February 18, 2020 RA 20-0010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket No. 50-482: 30 Day Report for Violation of Fitness For Duty Policy in accordance with 10 CFR 26.185 To Whom It May Concern:
Pursuant to 10 CFR 26.719, "Reporting Requirements," part (c), "Drug and Alcohol Testing Errors," Wolf Creek Nuclear Operating Corporation (WCNOC) is submitting a 30 day report detailing an investigation into a testing error associated with the non-compliance of the WC NOC Fitness for Duty (FFD) Program requirements stated in 10 CFR 26.185, "Determining a fitness-for-duty policy violation."
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
Sincerely, Ron Benham RDB/rlt Attachment cc: S. A. Morris (NRC), w/a N. O'Keefe (NRC), w/a B. K. Singal (NRC), w/a Senior Resident Inspector (NRC), w/a
)OZL
- J5!Jf P.O. Box 411 / Burlington, KS 66839 / Phone
- (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
Attachment to RA 20-0010 Page 1 of 2 Fitness For Duty Policy Violation Inspection Results Identification of Error:
On December 16, 2019, a Fitness For Duty (FFD) urine test was performed. On December 19, 2019, the urine test was incorrectly determined to be negative by the Medical Review Officer (MRO).
On January 16, 2020, during the Wolf Creek Nuclear Operating Corporation (WCNOC) Vendor Quality Audit #25012 of Coffey County Medical Center a concern was noted by the audit team in review of MRO notes for urine test December 16, 2019-donor. A donor sample was positive for the presence of drugs or drug metabolites, but the result was marked as negative based on a medication prescribed to the donor. It was later determined that the medication prescribed did not break down to the metabolite detected.
Investigation:
A request was made by WCNOC for the MRO to re-evaluate their determination of the urine sample results on the December 16, 2019-donor specimen.
On January 17, 2020 the MRO provided an addendum for December 16, 2019-donor results:
Patient provided a urine drug screen on December 16, 2019 that came back positive of opioids, in particular, codeine. In light of this, the patient was contacted, and they said that they do take hydrocodone and their prescription did check out; however, this does not break down to codeine. Instead, it breaks down to hydromorphone and so this not an acceptable explanation for the positive opioid test. In light of this, this test will be determined as medically positive.
Based on the original specimen result determination of negative, this individual was granted unescorted access on December 19, 2019. On January 20, 2020, WCNOC received the MRO addendum for the December 16, 2019-donor specimen. Upon receipt of this information, this donor's unescorted access was denied. A review of plant access badge reader logs determined the individual entered the protected area once between December 16, 2019 through January 20, 2020. No vital areas were accessed during this entry.
On January 22, 2020, the MRO's qualifications were terminated, and a request was made to Coffey County Medical Center for the MRO to re-qualify as an MRO due to this event.
Cause:
The MRO made an incorrect decision to change the result of a urine drug test from positive to negative based on a what they believed to be a legitimate medical explanation. The break down of the prescription was incorrectly determined by the MRO. During the investigation, an opportunity for improvement was identified for WCNOC to strengthen the program when medically negative results are identified by the MRO.
Attachment to RA 20-0010 Page 2 of 2 Corrective Actions:
- MRO qualifications were terminated. Training and re-qualification was requested by the licensee.
- Unescorted access was denied for the donor of the December 16, 2019-donor specimen due to a positive FFD test result.
- A process will be implemented between WCNOC and the MRO for the reporting of non-negative FFD test results indications.
- For extent of condition, a review was performed of the last two years FFD test results.
This two year period covers the timeframe since the last audit.
- New requirements will be added to the MRO checklists as follows:
- 1) A face-to-face meeting will occur between the MRO and the individual when the FFD test result returned is positive for opiates.
- 2) A verification will ,be required by a second MRO to confirm the *medically non-negative break down is accurately classified as positive or negative.
- 3) A medical synopsis will be sent to the licensee for all non-negative FFD results that are deemed possible misuse or abuse of prescription drugs.