ML20056C939

From kanterella
Jump to navigation Jump to search
Notification of 930817 Meeting W/Licensee in Bethesda,Md to Discuss Fuel Cycle Facility License Renewals
ML20056C939
Person / Time
Site: 07001201
Issue date: 07/27/1993
From: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Knapp K
FRAMATOME COGEMA FUELS (FORMERLY B&W FUEL CO.)
References
NUDOCS 9307300137
Download: ML20056C939 (2)


Text

H n

a b

July 27, 1993 Docket 70-1201 Ms..Kathryn S. Knapp B&W Fuel Company Commet cial Nuclear Fuel P1 ant P.O. Box 11646 Lynchburg, VA 24506-1646

Dear Ms. Knapp:

SUBJECT:

UPCOMING MEETING On August 17,1993, at 9 a.m., a meeting will be held in the Maryland Room at the Holiday Inn, located at 8120 Wisconsin Avenue, Bethesda, Maryland, concerning fuel cycle facility license renewals. The meeting will offer an opportunity to present and discuss a proposed approach for proceeding wilh the renewal of fuel cycle facility licenses while the NRC revises the applicable regulations and develops a Standard Review Plan (see enclosed Table of-Contents). We are interested in obtaining feedback from knowledgeable parties on our proposed approach, and therefore, would appreciate your attendance and participation at this meeting.

It is expected that the meeting will be attended by licensees, as well as other interested parties.

If you have any -

questions on this matter, please call Dr. Michael Tokar at (301) 504-2590 or me at (301) 504-2544.

Sincerely, original signed by Robert Pierson, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS

Enclosure:

As stated DISTRIBUTION:

Docket 70-1201 PDR/LPDR NRC File Center NMSS R/F FCLB R/F FCSS R/F LTenEyck JGreeves Region II Ovasnicki, RII Beveridge/ Cornell 1-23 VTharpe DAHoadley MLamastra 1:CEmeigh-A:\\LICENMTG]

0FC FCLB r b

FCLB _ [

FCLIA,8 Al

-FCLB N

NAME-VMpe MT(b Chei$h

-RP; eon

~

DATE 7/893 7/f;7/93 7t-f2/93 7/t/93 C = COVER E = COVER & ENCLOSURE N = NO COPY f.

OFFICIAL RECORD COPY hhh h1 PD DO 01 C

PDR j

TABLE OF CONTENTS

'I. ' Condit s of Operation i,

5 Introduction General Information 1.0 1.1 Facility and Process Description 1.2 Institutional Information Organization / Management Control and Oversight 2.0 -

2.1 Organizational Responsibilities and Authorities 2.2 Safety Comittees 2.3 Audits and Self-Assessments 2.4 Reviews of Design Changes 2.5 Human Factors

~

2.6 Investigations of Abnormal Events 2.7 Training and Qualification 2.8 Maintenance Program 2.9 Procedure Development / Approval x

2.10 Recordkeeping/ Reporting Quality Assurance Program 3.0 Integrated Safety Analysis Program 4.0 Radiation Protection Program 5.0 Nuclear Criticality Safety Program 6.0 Chemical Process Safety Program 7.0 Fire Protection Program B.0 Emergency Preparedness Prograw '

9.0 10.0 - Environmental Protection Program 11.0 - Decommissioning Program 11.1 Decomissioning Financial Assurance 12.0 - Safeguards Program 12.1 Material Control and Accounting (CAT I) 12.2 Material Control and Accounting (CAT II) 12.3 Material Control and Accounting (CAT III) 12.4 Physical Protection (CAT I) 12.5 Physical. Protection (CAT II/III) 13.0 - Waste Management Program

11. Safety Analysis Report 1

e