ML20056C936
| ML20056C936 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 07/23/1993 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Carns N WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20056C937 | List: |
| References | |
| GL-89-08, GL-89-8, NUDOCS 9307300112 | |
| Download: ML20056C936 (5) | |
See also: IR 05000482/1993018
Text
.
> R P f c t,f
UNIT E D ST AT E S
&
NUCLEAR REGULATORY COMMISSION
+
,
i
{ ff
REGION IV
$
f
611 RY AN PLAZA DRIVA SUITE 400
5, # ~ ( .j
[
AR LINGT ON, T E X AS ?49118064
- . . . . . "
July 23, 1993
,
Docket: STN 50-482
License: NPF-42
,
Wolf Creek Nuclear Operating Corporation
ATTN: Neil S. Carns
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
SUBJECT:
HRC INSPECTION REPORT 50-482/93-18
This refers to the inspection conducted by Mr. L. D. Gilbert of this office on
June 7-11 and 21-25, 1993. The inspection included a review of activities
authorized for your Wolf Creek Nuclear Generating facility. At the conclusion
of the inspection, the findings were discussed with you and those members of
your staff identified in the enclosed report.
Areas examined during the inspection are idcntified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, and interviews with personnel. The results of
this inspection are documented on page 1, in the enclosed report.
It is our understanding that, during the exit meeting conducted on June 25,
1993, Mr. T. Riley, Supervisor, Regulatory Compliance, made the following
commitments.
To update the response to Generic Letter 89-08 within 45 days from the
exit meeting to address the upgraded long-term erosion / corrosion
monitoring program; and
'
To complete clarifications to Quality Control Procedure QCI 12.1-503,
" Ultrasonic Examination for Component Wall thinning," by September 15,
1993.
If your understanding of these commitments differs from ours, please contact
me immediately.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
f
9307300112 930723
ly
[g.a
ADOCK 05000482
O
i
.
1
-
l
.
-
'
.
~
Wolf Creek Nuclear Operating
-2-
Corporation
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
'
Sincerely,
a:
Director
Division of Reactor Safety
Enclosure:
Appendix - NRC Inspection Report
50-482/93-18
T
cc w/ enclosure:
Wolf Creek Nuclear Operating Corp.
ATTN: Otto Maynard, Vice President
Plant Operations
P.O. Box 411
Burlington, Kansas 66839
Shaw, Pittman, Potts & Trowbridge
ATTH: Jay Silberg, Esq.
2300 N Street, NW
Washington, D.C.
20037
Public Service Commission
ATTN:
C. John Renken
Policy & Federal Department
P.O. Box 360
-
Jefferson City, Missouri
65102
U.S. Nuclear Regulatory Commission
ATTN: Regional Administrator, Region III
799 Roosevelt Road
Glen Ellyn, Illinois 60137
Wolf Creek Nuclear Operating Corp.
ATTN: Kevin J. Moles
Manager Regulatory Services
,
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Commission
ATTN:
Robert Elliot, Chief Engineer
Utilities Division
1500 SW Arrowhead Rd.
Topeka, Kansas 66E04-4027
1
..
.
.
.
Wolf Creek Nuclear Operating
-3-
Corporation
Office of the' Governor
>
State of Kansas
Topeka, Kansas 66612
Attorney General
1st Floor - The Statehouse
-
Topeka, Kansas 66612
<
Chairman, Coffey County Commission
Coffey County Courthouse
Burlington, Kansas 66839-1798
Kansas Department of Health
and Environment
l
Bureau of Air Quality & Radiation
,
Control
'
ATTH: Gerald Allen, Public
Health Physicist
Division of Environment
Forbes Field Building 321
Topeka, Kansas 66620
i
l
i
.
.
i
1
i
'
.
%
i
I
__ __ __
.
.
.
Wolf Creek Nuclear Operating
-4-
Corporation
i
bec to DMB (IE01)
,
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/A)
DRSS-FIPS
<
Section Chief (RIII, DRP/3C)
RIV File
i
SRI, Callaway, RIII
MIS System
Lisa Shea, RM/ALF, MS: MNBB 4503
Project Engineer (DRP/A)
,
Section Chief (DRP/TSS)
D. Powers
L. Gilbert
,
i
.
I
.
,
i
\\
1N
[
j
n
,s
RIV:RI:MSO[
C:MS
XIk
AD}hSRS/
AD:DRP # h
D:D b
!
LGilbert/lbl*
DPowers
IBa d
PGwynn
S[C/lNns
07/b9/93
07/13/93
A7/ /93\\
07/D/93
Oh3'
/
\\
.
_ _ _
__.
_
__
'
. [ ,. -
i
.
I
Wolf Creek Huclear Operating
-4-
Corporation
-
'
bec to DMB:-(IE01)'-
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector
y
Section Chief (DRP/A)
DRSS-FIPS
Section Chief (RIII, DRP/3C)
RIV File
!
SRI, Callaway, RIII
MIS System
Lisa Shea, RM/ALF, MS: MNBB 4503
Project Engineer (DRP/A)
Section Chief (DRP/TSS)
,
D. Powers
L. Gilbert
,
?
'
!
,
P
5
.
I
r
'
,
,
\\
[
n
,3
- /If!
ADhRS[
AD:DRP Nf'
D:D b
RIV:RI:M5jk
C:MS
,
LGilbert/lbh*
DPowers
IBa.d
PGwynn
kCdNns
,
07/bl/93
07/13/93
L I / /93 \\
07/1) /93
Ohf[
'
/
\\
290NG
-
j
.