e EO Docket No. 50-341 The Detroit Edison Company ATTN:
D. R. Gipson Senior Vice President Nuclear Generation 6400 North Dixie Highway Newport, MI 48166
Dear Mr. Gipson:
In a telephone conversation between Mr. Dennis P. Ockerman, Plant Training Manager, and Mr. Dell R. McNeil, Principal Examiner, arrangements were made for the administration of licensing examinations at the Fermi Power Plant.
The written and operating examinations are scheduled for the week of December 6, 1993.
Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards," (ES-201, Attachment 4) during the week of November 15, 1993.
To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by August 16, 1993. Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examinations being rescheduled.
The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.
In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.
In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original simulator performance Jata (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.
Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers.
If the 9307260158 930720 PDR ADOCK 05000341 V
[)
F 'W
~
1 JUL 2 0 1333 The Detroit Edison Company 2
applications are not received at least 30 days before the examination date, a postponement may be necessary.
Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This request is covered by Office of Management and Budget (0MB) Clearance Number 3150-0101, which expires October 31, 1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Managemert, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to l
the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NE08-3019, Office of Management and Budget, Washington, D.C.
20503.
Thank you for your consideration in this matter.
If you have any questions regarding the examination procedures and requirements, please contact Dell McNeil at (708) 790-5550.
Sincerely, OrTcTm T Mrv i Ey ;h-y A. my Mark A. Ring, Chief Operations Branch cc: John A. Tibai, Supervisor of Compliance P. A. Marquardt, Corporate Legal Department OC/LFDCB Resident Inspector, RIII James R. Padgett, Michigan Public Service Commission Harry H. Voight, Esq.
Michigan Department of Public Health Monroe County Office of Civil Preparedness T. G. Colburn, LPM, NRR D. P. Ockerman, Plant Training Manager R. M. Gallo, Branch Chief, OLB M. P._Rhil]ips, Section Chief, DRP
/
, 7 bec:
PUBLIC -
Rilf RIII RIII l
l
$w 3p Q
McNeil/cg Jorda,n ing 07/g/93 07/7 /93 07/1o/93 0
i
.