ML20056C304

From kanterella
Jump to navigation Jump to search
Mod 2,revising Statement of Work to Reflect within Scope Change & Key Personnel Clause,To Support for Collection & Analysis of Occupational Radiation Exposure Data
ML20056C304
Person / Time
Issue date: 02/01/1993
From: Michael Scott, Young B
NRC OFFICE OF ADMINISTRATION (ADM), SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
References
CON-FIN-L-1384, CON-NRC-04-91-054, CON-NRC-4-91-54 NUDOCS 9305130222
Download: ML20056C304 (4)


Text

- - - _ _ - - - _ _-- _. _ _ _ _. _ _. _. _ _

1.CONIMAC440 COOL g

  • " ^ ' ' ' *

.(RACT AMENDMENT OF SOLICITATION / MODIFICATION OF 1

I;

2. AMLNOMLNT /Mooet eCAT eorv NO.
3. Lt FLCTIVt. DAT 4.
4. RLQUISITiON/ PURCHASE REQ. teO.

6.PROJE.CT #10. gf.ppug RES-91-054 dtd.11/20/92 RES-C93-004 Two (2)

F. ADMtNIS1LRLD DY Cf otAtr t'asn litm 6)

( 855ULO O V l

U.S. Nuclear Regulatory Commission Division of Contracts & Property Management Washington, DC 20555

(/)

SA. AMLNOMENT OF SOLICITATION two.

.NAME AND AODRL5S Cf CONT RACTOR (No atreet. cousaty & Seat and Zip Cedef e

~ Science Applications International Corp.

Attn: Brenda Young, Acting Contracts Mgr.

' ' " " ^ ' " " " " " '

301 Laboratory Road, P. O. Box 2501 Oak -Ridge, TfL 37831 10A. MOOaF acAT10N OF CONT RACT/OROCR NO.

Principal Investigator / Technical NRC 04-91-054

Contact:

X loa.DATw au sme sas Teleph'na No. (

)

8/5/91 lFACIUTY CODE CODE 11.THIS ITEM ONLY APPLIES TO AMENDMENTS OF sot.lCITATIONS 1

is a 'sended. O i.. es.

l b The above numbenzf sorcitation is amencied as set forth kt lam 14.The hour and date specined fo'r evesipt of Offers l

tended.

j Offers snust +~'-+ seeelpt of this amendment prior to the hour and dew speelfied in the solicletion or es amended.tv ene of the fo8 (e) By coswie6ne items 8 and 15.end retuming copies of the e..

4. 1t:Cbl By actaowse$oins receipt of thk --

W.=t on each copy of te offer l

submitted; er 6c) By separete letser or telegrera vehidi Ir*4ae e roterence to the soricitation and amendment nunters. FAILU 1

j MENT TO BE RECEtVED AT THE PLACE DESIGNATED FOR THE RECElfTOF OFFERS PRIOR TD setur.g.,.w.s esen wieorem or seter makes reserence to the sonsuson wid this amendm l

f 22 ACCOUNTING AND APPROPRtAT40N DATA (1/ seessdred) l L1384 B&R No.: 36019202400 B0C: 2542 31X0200.360

$100,000.00 13.THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS.

IT MODIFIES THE CONTRACWORDER NO. AS DESCRIBED IN (TEM 14.

"'"'""**^"'"^"'"'c"'

vi %5&T"#R No M neh'#f.""""^"" '

""*'Y""**'"" '""^"*'5 5'"

3.THE A80VC NUMBERCO CONTRACT /OR OCR 15 MOOtFtCD TO REFLECT THC ADMINtSTRATfvc CHANGES (such as chantes in appropristJon dear.escJ SCT FORTH $N ITEM 14.PUR$UANT TO Tt !C AUTHORITY OF FAR 43JC3(tr).

C.THis SUPPLEMENTAL AGREEMENT 45 ENTERCO 4NTO PURSUANT TO AUTHORt1 Y OFs 0.01HER t$pecify typt of mod 4ficetion and easthority)

X FAR 52.243 Changes-Cost Reimbursement, Alt. No.1, ( Aug. 87) 2 E.IMPORTANT: Contractor O is r,ot.

x i <eautrea to ion tais oocument.<e return

,,,;,,,,1s,,,,,;,,,,,,,,

le.Oc5CRieT.ON OF AucNoMcNT/MOOiFsCAT EON rorr ad <d arr ucrerction he. densa. tam-solicisetion/contr=csa Continued on pages 2 and 3 t

6 9305130222 930201 PDR CONTR I

NR C-04-91 --054 PDR l

Except es provided hereta, ass terms and conditions of the document referenced in Item SA or ICA, as heretofore changed. remains unchanged and in t j

end.nect.

16A. NAME AND TIT LE OF CONT RACTtNG OFF BCER (Type or print) 15A.NAME AND TtTLE OF SIGNER ff7pf orprint)

Mary Lynn Scott, Contracting Officer l

l ISEL NT RACT OR/Of f 15C.DATE SIGNED 168. UNtT E0 51 AT E5 0F A CR8CA 16C. DATE 56GNLD

/'")

/n/hu/M//Wl//Me-fh t L-M JAN 151993 cv j

(sitaetere prog'se(tiertago signf (synetdre of Contractic.s Officerf

~

v *"

STANDARD FORM 30 (RCv. lo.e31 30-305 NSN 754041152-80 0 er.mn,m,,,

Modification No. 2 Contract No. NRC 04-91-054 Page 2 of 3 The purpose of this modification is to revise the statement of work to reflect a within scope change, revise the Key Personnel clause, increase the contract ceiling, provide incremental funding, and authorize contractor-acquired property. Therefore, the contract is modified as follows:

(1) Attachment No.1, " Statement of Work, Modification No. 2", is hereby incorporated into and made a part of Section C.1 of the contract. This effort shall be performed in accordance with the contractor's proposal dated December 16, 1992 and December 21, 1992.

(2) Section B.3, " Consideration and Obligation", is hereby modified to reflect an increase of $94,087.00 in the contract ceiling amount and an increase of $100,000.00 in the amount obligated to the contract.

Therefore, paragraphs a.,

c., and d. are modified to read as follows:

a.

The total estimated cost to the Government for full performance of this contract is $1,019,501.00, of which the sum of $941,282.00 represents the estimated reimbursable cost, and of which $78,219.00 represents the fixed fee.

c.

The amount currently obligated by the Government with respect to this contract is $800,000, of which the sum of $737,327 1

represents the estimated reimbursable cost, and of which $62,673 represents the fixed fee.

For further provisions on funding, see the LIMITATION OF FUNDS clause incorporated in Section I.

d.

It is estimated that the amount currently allotted will cover l

the cost of performance of the contract through December 5, 1993.

l (3) Subsection H.1, Key Personnel, is modified to delete Reginald Gotchy l

and insert in lieu thereof Laurence F.. Friedman, CHP.

l l

(4) Section H is hereby modified to incorporate the following Subsection:

l I

H.9 CONTRACTOR-ACQUIRED PROPERTY Other provisions of this contract notwithstanding, the contractor is hereby authorized to acquire the following property within the limits set forth below, subject to the terms and conditions of the GOVERNMENT PROPERTY clause incorporated by reference, for use in direct performance of the contract.

Title to this property shall vest in the Government.

Modification No. 2 Contract No. NRC 04-91-054 Page 2 of 3 Item Description Quantity Not to Exceed GBF Winchester disk drive upgrade kit for expansion of RZ-5X-CA/C3, RZ-5X-FA/F3, and RZ5X-HA/H3 1 each

$2,518 Extended Warranty, Months 13 through 24

$ 743 Hardware Installation

$ 708 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

i

,. y..

ATTACHMENT NO. 1 STATEMENT OF WORK NRC 04-91-054 Modification No. 2 1.

Provide NRC project officer with a draft revision to the REMIT software users manual which incorporates the comments received by NRC during beta testing as deemed appropriate by the NRC project manager. This task shall be completed no later than 1 month from the initiation of this modification. This task should require approximately 1.5 person-months of technical effort and 1 person week of clerical effort.

2.

Provide NRC project officer with REMIT version 2.0 which corrects all errors and incorporates all comments received by NRC during beta testing as deemed appropriate by the NRC project man =pr.

Th1s task shall be completed no later than 1.5 months from the initiation of this modification. This task should require approximately 2 person-months of programmer effort.

3.

Foll aing receipt of NRC project officer comments on the draft, provide flRC project officer with a final camera ready REMIT users manual for publication as a NUREG/CR. This task shall be completed no later than 2 weeks from the date NRC project officer comments are received by contractor. This task should require approximately 0.5 person-months of technical effort and.25 person-weeks of clerical effort.

4.

Provide technical support to software users for one year following release of the software and the users manual to licensees.

This task should require approximately 1 person-month of technical effort.

~

I l

l