ML20056C274

From kanterella
Jump to navigation Jump to search
Mod 18,deobligating All Excess Funds Under Contract,To Development of Nuclear Reactor Plant Data Bank
ML20056C274
Person / Time
Issue date: 12/24/1992
From: Michael Scott
NRC OFFICE OF ADMINISTRATION (ADM), ZERO ONE SYSTEMS, INC. (FORMERLY TECHNOLOGY DEVELOPME
To:
References
CON-FIN-B-7077, CON-NRC-04-80-215, CON-NRC-4-80-215 NUDOCS 9305130085
Download: ML20056C274 (2)


Text

,. coni aAc1.o cooc

.c.

. ^ ".

M

  • NT OF SOLICITATION / MODIFICATION OF CONTftACT AMhDME y

%,_c, N o.

-,-ccuvc Og s amois.v.O-RCnAse aco.NO.

AomOom1,-oo.:.Cm.OuNO.

DEC M Eighteeri 08) 7.^O uiN'Sicu m <w <u =

  • n **a3*

cogg [

e..ssow ev coggl I

U.S. Nxlear-Regulatory Cannission Division Of Contracts & Pruprty brugeient

~

~

Washington, DC 20555 SA. AMENDWiCNT OF SOUCR Ah0N NO.

KNAME AND ADORE 55 OF CONT RACTOR (No sem(. county, &hu sad MP OMrJ g

7Iro-OneSystems,Inc.

,a.OAiwesEnsun) 2431 Mission College Blvd.

Santa Clara, CA 95054-l toA. MOOie: CANON OF cont RActsORoa NO.

Principal Irwestigator/ Technical NRC-04-80-215

Contact:

v, ' w na ~

sea.OATtD ass e.,e ae)

Tel-9 m No.

G og) abba nun l

09-01 -80 lFACluTYCODE f

CODE 11.THIS ITEM ONLY APPLIESTO AMENOMENTSOF SOLICfTATIONS b as not es.

is The et' Eve siumbered soEchstion is amended as est forth in Itasa 14.The hour and doce speoIfied for sessipt et Offers One,s.o.st%.oosi,t is ndment rto e r.nd*e.e e, medin ee es nor..mo ded.hrone e.e e med ds:

emples et th's amendmenc ed ey acknoueledgingionalpaet thisamendmenteneessiese W(el av eempletime tennis e and 15.and eensmine.hich inchafes a seierence to the easielteSon and a MENTTO DE REGWED ATTHE PtACE DESIGNAT1lD FOR TIE REGIPTOF OFFE er 6d By esperate lateer er seingrems esteer,preetded sede selegram or letter anskas eviesence to the soEdtetion 1

22. ACODUNTING AND APPROPR4AT80N DATA (ff segasked) -

f mm m m.m MA AM 11 FTM % 97077 PM Nn. 60140109 13.THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS /OADERS, (T MOOfFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN (TEM 14.

i aerme.fD) THE CHANGC5 SCT FORTH GN 81CM 14 ARE MADC IN THE CO 45 4550E0 PUR$UANT TOs $

g A. tnt 5 CHANGC OROCRTRACT OROCR NO.8N 8 TEM 20A.

i 3.THC ABOVE NUMcCRCD CONTR ACT/OROCR t$ MOO 4Ff ED TO REFLCCT THC ADMINtSTRATf.vC CH a;.;;cedosidest.ascJ SCT FORTH SN 8TCM 34, PURSUANT TO TNC AUTHORITY OF FAR 43.3 3(e).

f C. THis SvPPLEMENTAL AGREEMENT 85 ENTERED $NTO PUR$UANT TO AUTHORtTY OFs 0.0TNCR (Speetly type el nosodifeceUon and euhor1ity)

Unilateral Modification based on the fact that the contractor cannot be located x

E.IMPORTANT: bwitractor b isnot. O is,.2oireo so ionist.oocument.no,.< Urn cogie.ioia,issu.n ovric r m 1 0c5CReenON OF AutNOucNTiuGOsf scAx.ON <Organu<s by vcreacno. ua stnn.inesudsne eeuesuuonicontwe a.wact m.ua

)

see page 2 of 2' 1

t

\\

h 9305130085 921224 v

i PDR CONTR NRC-04-BO-215 PDR 4....M.... ;

............... _.,_ o... _._,......_.......eA A...

...o,o.............

16A. N AME AND TtiLE OF CONT RACTING Of f ICER (Type or PrinQ v

..a enses.

13 $A. NAME ANO18100 06 5sGNLR (Type orp.ir Q

)

Mary Lynn Scott

16C.DATE SIGNi A bC. OATL 5tGNLD 30B. UNt1 LO ST ATi_5 0F AMijRtCA 158, CON 1 R AC10H/ oft L ROR a gf h f

O A_

4 gy

,s..-.,.C-.

- 011.,

as,,....,,,,.-...........,

STANDARD FOntA 30 (REV. so-a )

30105-f45N 754o41 157-f.07o

~~. ~

IT"NNN,,,,

s.

a 4

Contract No. NRC-04-80-215 Modification No. 18 Page 2 of 2 l

The purpose of this modification is to deobligate all excess funds

~

under this contract. The contractor has completed all requirements required by the Government at a total cost of $1,905,480.34.

The i

Government has paid the contractor $1.905,480.34 for all services i

rendered.

Accordingly, the following action is taken ARTICLE III - CONSIDERATION AND PAYMENT, Section A. Estimated Cost.

Fixed Fee. and Oblication is revised to decrease the obligated amount by

$28,841.11 from

$1,934,321.45 to

$1,905,480.34.

Therefore, paragraph 3 is revised to read "3.

Obligation of Funds.

The amount presently obligated by i

the Government with respect to this contract is

$1,905,480.34."

g All other terms ar i conditiono, including the ceiling amount of this contract, remm n unchanged.

A summary of obligations for this contract, from award date through the date of this action is given below:

Total FY 80 Obligation Amt.

$100,000.00 i

Total FY 81 Obligation Amt.

$400,000.00 Total FY 82 Obligation Amt.

$390.490.00-Total FY 83 Obligation Amt.

$498.479.00 Total FY 84 Obligation Amt.

$419,702.00 Total FY 85 Obligation Amt.

$ 30,000.00 Total FY 86 Obligation Amt.

$ 95,G50.45 Total FY 93 Deobligation Amt.

$ 28,C41.11

?

Cumulative Total of NRC Obligations $1.905.480.34.

l l

This modification deobligates funds in the amount of $28,841.11.

l 1

f f