ML20056C198

From kanterella
Jump to navigation Jump to search
Mod 5,adding Proposed Changes to Indirect Rates,Under Subsection G.19a) for FY92 93 to, Rulemaking & Regulatory Analysis Support for Requirements Involving Physical Mod to NRC Licensed Facilities
ML20056C198
Person / Time
Issue date: 04/02/1993
From: Camp B, Mattia M
NRC OFFICE OF ADMINISTRATION (ADM), SCIENCE & ENGINEERING ASSOCIATES, INC.
To:
References
CON-NRC-04-89-051, CON-NRC-4-89-51 NUDOCS 9304260240
Download: ML20056C198 (2)


Text

_-- ~ ~

-.. ~....... _.......... _ _ _ _ _ _

J a.cOro RAci so cooC pac 0 o,.

,c,_,

j g

2

/WENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

4. REQUEST T DON /l*VHCMASE kEQ. NO.
6. PROJECT NO. Gt appanicab&e)
3. EF F LCT 8 vE DATL

'2. AMENDMENT / MOO 4I 4CA18ON f*0.

MR 0 21993 ADM RFPA dtd 2/R/o1 five (5) j mMumm n um un w o coggl

(_.55uCD eu cogg U.S. Nuclear Regulatory Commission

))

Division of Contracts & Property Management Washington, DC 20555 M

9A. AMENDMENT OF SOLICIT AT 40N NO.

'a. NAME AND ADDRESS OF CONT RACT064 pie esmrt. county.Esase end E.l? Codef Science and Engineering Associates, Inc.

6100 Uptown Bl vd., N.E.

Albuquerque,~ New Mexico 87110

,,,,,,,,, coy,,,cyo,,c, HO.

PrLeinal Imrestigator/ Tach,f eal X

.NRC-04-89-051

Contact:

Mr. Bon bmn loa. D AT w (ssa n u aas Telap h No. (505)

RR4 '/100 5/2/89 lFACIUTY CODE 11.THIS (TEM ONLY APPLIESTO AMENDMENTS OF SOLICITATIONS CODE b The abow numbere:f monettetkri k amended as set forth in team 14.The Offers must 9 = 1 '-; receipt of this amendment grior sa the hour and dew spec innded.

E F YOUR ACKNoWLEDG.

submitted; or 6cl By esperste letter or telegram whict Includes a esterence es Wie soEdtetion and amen (e) By conipleting itens 8 and 15.ard retumho MAY ftESULT MENT TO BE RECEfVED AT THE PLACE DESIGNATED FOR THE REC t

t or i

i d i r to the operinne hourand date specified.

o.

.',ed secs teleprom or letter makes referonos to the sondtetion and this

"... and s ecom wo pr o seteor

12. ACCOUNTsNG AND APPROPRAAT BON DATA 61/*etadred)

N/A 13.THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDE fT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

(EptttfJ essmeettyf TMC CNANGES $ET FORTH $N ST EM 14 ARE 4AAOC 4N THE f

A. 7H45 CNANGE ORDER 85 e55UEO PURSUANT TO:

Oi TRACT ORDER NO.GN $ TEM 10A, h

t W.,; effk*.

S.THE ASOVE NUMBERED CONTAACT/ ORDER t$ MOOtFf EO TO REFLECT THE ADMINtSTRATIVE CH er,..pmes dear,escJ SCT FORTH BN ITEM 14.PUR$UANT TO THE AUTHORITV OF FAR 43.103(h).

C.THt5 SUPPLEMENTAL AGREEMENT $5 ENTLRED ANTO PURSUANT TO AUTMORETY OFs D.OTNER (Epecify type er smoddfacehom and entf6erity)

X Section 1.1 FAR Clauses 52.216-7 Allowable Cost and Payment E.IMPORTANT: Contractor " is fot. O i., oir.<ito.i ntsis e ment.exir torn -

<Oc es to in is.oina Qui =.

As.'# %'

14. OE5CRiPT eon OF AMENOMENT/MoDir Car:ON acc ' ' *y tactaresion w --. - " "sas -~s e--+ erect eenvees e==cser (SEE ATTACHED PAGE) 0 fy

)

9304260240 930402 Qk

[

PDR CONTR NRC-04-89-051 PDR d e la fests force Catcept es prowleed herek. ett terms and conditions of the document referenced la item S A or 10A, as her

/

16 A.hAME AND llTLE OF CONT RACTING OF FICER G7pe'er PriaU ena eneet.

ISA.hAME AND TITLL OF 54GNER G7ter erprint) q p g Ma tia g rac ~i Officer Ma g

if>C.OATE $tGNEL AbC.DATE SeGNT.D 16 8.

N_

59A 09:46 4t@

iba CONT RACT OR/OF F EftOR

\\

gy d'h(ma;inte of CosMecung OTlacer)

Garnetare o(person authorized to sign)

STANDARD FORM 30 mEv.10 83 30805 esce,i dg G NSN 754041 152-6070 e meaart

e O

Modification No. 5 Contract No. NRC-04-89-051 page 2 of 2 The purpose of this modification is to add proposed changes to indirect rates. Accordingly, the contract is hereby modified to read as follows:

Under subsection G.1(a) - INDIRECT RATES (MAR 1987), add the following rates for FY92 (10/1/91 - 9/30/92) and FY 93 (10/1/92 - 9/30/93):

Applicable

" Category Rate Cost Base Time Regular Fringe Benefits -

33.3% Direct Labor 10/1/91-9/30/92 Onsite Overhead -

82.2% Direct Labor 10/1/91-9/30/92 M&S Overhead -

1.8% Subcontractor 10/1/91-9/30/92 Costs G&A 13.5% All Costs 10/1/91-9/30/92 Before G&A Except Subcontractor Costs Applicable Category Rate Cost Base Time Regular Fringe Benefits -

35.8% Direct Labor 10/1/92-9/30/93 Onsite Overhead -

84 % Direct Labor 10/1/92-9/30/93 M&S Overhead -

1.8% Subcontractor 10/1/92-9/30/93 Costs G&A 12.4% All Costs 10/1/92-9/30/93 Before G&A Except Subcontractor Costs" ALL OTHER TERMS AND CONDITIONS OF THE CONTRACT REMAIN THE SAME.

- -