Text
r.
.e
p**IGo
,,
NUCLEAR REGULATORY COMMISSION
g
}E.
I
RE GION IV
-
e . ( 72
e
l
- .
'
f
611 RY AN PLAZA DRIVE. SUITE 400
4
- 3
ARLINGTON TEXAS 76011 8064
e
gj
MR 241993
i
i
e
Dockets:
50-445
50-446
Licenses: NPF-87
NPF-88
,
r
.
[
,
TU Electric
ATTN:
W. J. Cahill, Jr., Group Vice President
I
Nuclear Engineering and'0perations,
.
Skyway Tower
.
400 North Olive Street, L.B. 81
Dallas, Texas
7c201
SUBJECT: NRC INSPECTION REPORT 50-445/93-11; 50-446/93-11
'
This refers to the inspection conducted by Mr. D. N. Graves, and the
.
t
inspectors identified in the enclosed report, of this office, on January 31
through March 6, 1993. The inspection included a review of activities
t
authorized for the Comanche Peak Steam Electric Station, Units 1 and 2,
!
facility. At the conclusion of the inspection, the findings were discussed
with you and those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within.
these areas the inspection consisted of selective examinations of procedures
-
and representative records, interviews with personnel, and observation of
i
activities in progress.
It was identified that, during a maintenance repair activity, inadequate
i
procedural controls resulted in damage to a valve actuator housing in the
residual heat removal system. This occurrence was in violation of Criterion V
of Appendix B to 10 CFR Part 50. However, this violation is not being cited
=
because the criteria in paragraph VII.B.2 of Appendix C to 10 CFR Part 2 of
the NRC's " Rules of Practice" were satisfied. This violation was an isolated
.
i
occurrence and the licensee staff took prompt and effective actions to correct.
the problem.
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy
of this letter and its enclosure will be placed in the NRC's Public Document
t
,
Room.
,
,
Rul;e
,
Q
v'
'l
. .
2 1
.,
, _ _ _
_
-.
-
m
.
t
f
..
l
!
.
.TU Electric
-2-
i
l
,
Shculd you have any questions concerning this inspection, we will be pleased
,
to discuss them with you.
l
!
Sincerely,
t
A. Bill Beach,. Director
i
Division of Reactor Projects
!
,
'
Enclosure-
Appendix - NRC Inspection Report
50-445/93-11; 50-446/93-11 w/ attachment
j
!
cc w/ enclosure:
TU Electric
ATIN:
Roger D. Walker, Manager of
Regulatory Affairs for Nuclear
!
Engineering Organization
Skyway Tower
i
400 North Olive Street, L.B. 81
i
Dallas, Texas 75201
l
- !
Juanita Ellis
- ;
President - CASE
l
1426 South Polk Street
Dallas, Texas 75224
-
!
GDS Associates, Inc.
Suite 720
i
1850 Parkway Place
Marietta, Georgia 30067-8237
j
!
TU Electric
!
Bethesda Licensing
j
3 Metro Center, Suite 610
!
Bethesda, Maryland 20814
!
!
Jorden Schulte, and Burchette
ATTN: William A. Burchette, Esq.
(
Counsel for Tex-La Electric
!
Cooperative of Texas
j
2025 Thomas Jefferson St., N.W.
i
Washington, D.C.
20007
i
!
+
)
i
!
,
[
_ .
__
_.
.
.
-
- __
.
- _ .
_
.
1
..
s
!
!
-
.
TU Electric
-3--
,
i
!
i
i
!
'
Newman & Holtzinger, P.C.
!
ATTN: Jack R. Newman, Esq.
j
1615 L. Street, N.W.
!
Suite 1000.
Washington, D.C.
20036
,
Texas Department of Licensing &. Regulation
f
ATTN:
G. R. Bynog, Program Manager /
Chief Inspector
Boiler Division
1
P.O. Box 12157, Capitol Station
j.
!
l
Honorable Dale McPherson
!
County Judge
,
P.O. Box 851
-i
Glen Rose, Texas 76043
f
i
1
Texas Radiation Control Program Director
-i
1100 West 49th Street
.
l
3;
I
Owen L. Thero, President
Quality Technology Company
.;
P.O. Box 408-
201 West 3rd
'
' Lebo, Kansas 66856-0408
i
,
f
i
+
"I
!
>
.
<
4
.I
i
i
l
'
t
!
!
l
i
i
!
-i
!
!
!
!
t
. :.
-
.-.
. , ,
-
.--
.~,
,-
_
.
-
.
TV Electric
-4-
PAR 2 41993
bcc to DMB (IE01)
i
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector (2)
Section Chief (DRP/B)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
A. Bill Beach, D:DRP
i
i
f
'
I
i
l
r
I
i
t'
t
!
RIV: SRI:DRP/B
RI:DRF /B
RI:DRP/S
PE:DRP/B
PE:DRP/A
C:DRP/A
. ,(
DNGraves:rwg
RMLattfi
GEWerneNf TReis N
KMKennedy [WDJohnson k
i
-
03/n/930
03 /.tf-/93
03/4v/93
03 /'f.U93
_/
03/u./9d? 03/7z/93r'\\
RE:DRS/MSb C:DRS/Mh) NRR:RfIBC:DRP/B bDD:DRP b D:DRP [ [
!
DLKelley {l
DAPower's
SKMalN
LAYandellf TPGwynn
.JBBeach
'~
03h zj93 . .
03/2L/93
03/It/Sb
03 /2.t/ 93
03/2' /93
- 03/M/93
Illini
4 Wry
!
!
.
-
.
C.
,
l
i
TU Electric
-4-
MAR 2 41993
l
!
I
bcc~ to DMB..(IE01)
.!
-
,
bcc distrib..by RIV:
l
J. L. Milhoan
Resident Inspector (2)
!
Section Chief (DRP/B)
i
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
t
DRSS-FIPS
RIV File
!
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
l
A. Bill Beach, D:DRP
j
i
!
e
!
!
i
i
I
,
i
i
i':
i
i
!
!
l'
RIV: SRI:DRP/B
RI:DRF/B
RI:DRP/B
PE:DRP/B
PE:DRP/A
C:DRP/A-
.at
w,
RMLattfi
GEWerneNf TReis N
KMKennedy [WDJohnson Y
DNGraves:r a
l 03/'42/93
03/g/9h3 03/27/93t'\\ 03/gf93)
03/ W 93
03/4v/93
RE:DRS/MSff,
C:DRS/MS) NRR:RflBC:DRP/B[,
DD:DRP b D:DRP @ I
DLKelley hi
DAPoweds
SKMal M
LAYandellf TPGwynn
.JBBeach
03/2,J93Crk
03/2L/93
03/tt/h
03/2t/93
03/? /93
j03/M/93
%
4%
-l
l
l
l
<
.
.
.
. -
-
_
f