ML20056B729

From kanterella
Jump to navigation Jump to search
Forwards 6-month Operating Rept 1 for 701210-710630.W/o Encl
ML20056B729
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/05/1971
From: Duncanson R
NORTHERN STATES POWER CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9102080446
Download: ML20056B729 (1)


Text

'

NSP NORTHERN STATES POWER COF. PANY l

wiNNaa pou e. MIN N a soTA 58401

~

cf.

4

//

pFh 2

fygg g k

August 5, 1971 m -.

a 6

40ernga W 3ans y

Dr. Peter A. Morris, Director N

Division of Reactor Licensing United States Atomic Energy Comission Washington, D. C.

20545

Dear Dr. Morris:

Re:ph'c'v File C '

Y MONTICELLO NUCLEAR GENERATING PLANT 1

DOCKET NO. 50-263 LICENSE NO. DPR-22 SIX-fMfH OPERATING REPORT NO.1 Forty copies of the first six-month operating report of the Monticello Nuclear Generating Plant for t.he period of December 10, 1970 to June 30, 1971 are being sent to you under separate cover.

(

This report is required by Section 6.6.D.1 of Appendix A, Technical Specifications and Bases, to Provisional Operating License DPR-22 for

_l the Monticello plant.

i Yours very truly, WW R O Duncanson, Jr., P. E.

Gen. Supt. of Power Production-Mechanical Chairman - Monticello Safety Audit Comittee ROD /RLS/br (f

S

^

d DOCKETED us/IC A

S. AUG181971 *%

T3 REGULATORY Q

WL SECTION,

DOCKET CLERK > 6 fF1O2080446 710805

'r

- 103 o

ADOCK 05000263 l

O co CF v@

I

'