ML20056B687

From kanterella
Jump to navigation Jump to search
Forwards Summary of Technical Repts Re Integrated Primary & Secondary Containment Leak Rate Test Results.W/O Encls
ML20056B687
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/23/1970
From: Mayer L
NORTHERN STATES POWER CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20056B688 List:
References
NUDOCS 9102080359
Download: ML20056B687 (1)


Text

-

~

2 MSP NORTHERN STATES POWER COMPANY Minneapolis, Minnesota 55401 December 23, 1970 E* N "

'I I'

D e

.6

't s

Dr. Peter A. Morris, Director

[

Q (1

B Division of Reactor Licensing

-[ q%[ /,

United States Atomic Energy dommission

' /Sp Washington, D.C.

20545 j

8

'jc(Q>/~ %

A

Dear Dr. f.brris:

N elsE ifi&

MOUTICELLO IUC' F R GENERATING PLANT Docket No. LO- ' License No. DPR-22 Primary and Secondary Containment Leak Rate Test Results An Integrated Primary Containment Leak Rate Test and a Secondary Containment Leak Rate Test have been completed recently at the f!cnticello Nuclear Generating Plant. Three copies of the two summary technical reports Integrated Primary Containment Leak Rate Test Performed July,1970 Secondary Containment Leak Rate Test Perfortred August,1970 are hereby submitted in accordance with the reporting requirements of section 6.6.E.3 of Appendix A, Technical Speci fication, of the Provisional Operating Li cense DPR-22.

Yours very truly, 0

L.O. Mayer Manager of Power Production LOWeaf

~

/

'b d

DOCKETED

'g U%EC b JAN131971 k

9102000359 701223

~

WAllSECTics[

REGULATORY CF ADOCK 05000263 Q

CF DOCKET CLEEE 6

L