Text
F#
~ 7; P y;
p
. <f a3 e
ye-ire v
~.
h
,- 4 :
x Lp t
7:
OPERATING DATA REPORT.
M,t..
4 DOCKET No.
"sn-un -
f D All:.luly 2L 1990 COMPLETED liY n41^1 "arsour s
,g TELEPilONE W C W 1-7384 i
. OPI.R ATING STATUS N" '" '
' l. Unit Name:
Davls-hne #1 June 1990
- 2. Reporting Period:.
z
- 3. Licenwd Thermal Power (MWt P 2772 I
J 4J Nameplate Rating (Gross MWeli 925 g
- 5. Design Electrical Rating (Net MWe):
906
?
- 6. Maximum Dependable Capacity (Gross MWe):
0'A 7 Maximum Dependable Capacity (Net MWe);
A74 8, if Changes Occur in Capacity Ratinn (items Number 3 Through 7) Since Last Report.Giie Reasone n
- 4. Power Lesel To Which Restricted. lf Any (Net MWe n
~ 10. Reawns for Rntrictions. lf Any:
I 1
This Month Yr..t o.Dat e Cumulatise
.p
- 11. Ilours in Reporting Period 720.0 4.343.0 1040472
- 12. Number Of flours Reactor Was Critical:
0.0~
608.8 54.763.4
- 13. Reactor Resene Shutdown flour,
.0. 0 0.0-5,393.7 1
. l4. Ilours Generator On Line 0.0 608.8 52,809.'2-
- 15. Unit Resene Shutdown flours 0.0 0.0-1,732.5-l
- 16. Gross Thermal Energy Generated (MWil) 0.0
- 1.603,325 126,567,245 17fGross Electrical Energy Generated (MWil) 0. 0_, _,
536.477 41,886,778 lb. Net Electrical Energy Generated (MWH) 0.0 508,740 39,295.898 L
i-
- 19. Unit Service Fac;nr 0.0 14.0 50.5 20.- Unit Asailabihty f actor 0.0 14.0-52.2-
.s
- 21. Unit Capacity Factor (Using MDC Net) 0.0-
-13.4
_43.0 l
22; Unit Capacity Factor (Using DER Net) 0.0 12.9 j1.5
' 23. Unit Forced Outage Rate 100.0 35.6
-28.8 l
- 24. Shutdowns Scheduled Oser Nest 6 Months IType. Date,and Duration of Eacht:
1 g.,
Y
'. Q _,
i 25.-if Shut Down At End Of Report Period.lstiniated Date of Startup:
.luly 5, 1990
- 26. Units in Test Status tPrior to Commercial OperationU Forecast Achiesed q
I' INillA L CRITICAL.lTY h
INI TI A L ELECTRICITY -
COMMERCI A L OPER ATION l
9008090276 900723 ADOCKOSOOpg6 i.
gon7 3 DR.
m,
~
~
~
i
,y terr semxzers Ara PoecR mEDucTross g
D00GT Mo. ' 50-3 44
~4(
U
' MtIT MME Davis-Gesse 01 ;
OnTE-July 23. I990.
CDMr1ETED ST Silal Sarsour REPOPT MONTH June 1990 TEzZrnme (419 321-73:4 "u
[4 Ym{
cause & corrective Licensee a_
c.
f 3I f
T Event 5}
- 0
^ct**" **
e h
j j.h Report 0 o
Prevent securrence
'8 3
90-02-01 S
120 C
4' NA NA NA The unit outage which began on January 26, 1990 was still in progress through the end of June 1990.
4 90-06-05 S
399 C
4 NA
.NA NA The outage was extended ~ longer than g
anticipated to complete planned and' scheduled work.
5 90-06-16 F
201 11 4'
NA
'NA NA The outage was extended longer to l-repair RC2 and RC11 valves.
See Operational Summary for further details.
I F: Forced Reason:
Method:
- Exhibit G - Instructions for Properation of Data-5: Schedsled h-Equipment Failure (Emplain)
' 1-ftenual Entry Sheets for Licensee Event Report (IER) d-Maintenance or Test 2-Manual Scram File ( N 161)
C-Reft 211ng 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training & License Emacia,* ion Previous Month Exhibit I - Same source F-Admiristrative 5-toed moduction
- Report challenges te Power operated Relief valves G-operational Error (Explain) 9-Other (Explain)
(Patt7s e and Pressurizer Code Fafety Yalves (PCSTs)
B-other (Explain) a
.u