ML20056A760
| ML20056A760 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/06/1990 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20056A761 | List: |
| References | |
| NUDOCS 9008090161 | |
| Download: ML20056A760 (5) | |
Text
..
1 4
o' 7590-01 g;
LMIED STATES NUCLEAR REGULATORY COMMISSION NORTHEAST NUCLEAR ENERGY COMPANY DOCKET NO. 50-423 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR' HEARING The U.S. Nuclear Regulatory Comission (the Comission) is considering issuance of.an amendment to Facility Operating License No. NPF-49, and issued to Northeast Nuclear Energy Company, et al (the licensee), for operation of the Millstone Nuclear Power Station, Unit 3, located at the licensee's site in New London County, Connecticut.
The proposed amendment would modify Technical ~ Specification (TS) 3/4.8.1, "A.C. Sources", to include provisions to eliminate the fast, cold, repetitive starting of-the diesel generators. Additional changes in TS 3/4.8.1 and its Bases have been proposed regarding instrumentation and test standards.
In addition, TS 3/4.8.2, "D.C. Sources" would be changed to clarify the remedial measure for inoperability of the required full capacity battery chargers.
Prior to issuance of the proposed license amendment, the Comission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Comission's regulations.
By. September 12, 1990
, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceed-90o8090161 900806.
PDR ADOCK 0500 3
F
i' i
~ *.e,
ing and who wishes-to participate as a party in the proceeding must file a
~
~ written request for a' hearing and a petition for leave to intervene.
Requests for a hearing and petitions for leave to intervene shall be filed in accordance with the Comi:> ion's " Rules of Practice for Domestic Licensing Proceedings" in 1-10 CFR Part 2.
Interested persons should consult a current copy of 10 CFR 2.714 which is av m ble at the Comission's Public Document Room, the Gelman Building, a
2120 L Stron, N.W., Washington, D.C. 20555 and at the Local Public Document Room located at the Learning Resources Center, Thames Valley State Technical i
College, 574 New London Turnpike, Norwich, Connecticut 06360.
If a request for a hearing or petition for leave to intervene is filed by the above date, the Comission or an Atomic Safety and Licensing Board, designated by the Comission i
L or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
As required by'10'CFR 2.71t, a petition for leave to intervene shall set
-forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with n
particular reference to the following factors:
(1) the nature of the petitioner's I
right under the Act to be made a party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the p
proceading; and (3) the possible effect of any order which may be entered in the proceeding on the petitioner's interest. The petition should also identify the specific aspect (s) of the subject matter of the proceeding as to which
^lg m.n petitioner wishes to intervene. Any person who has filed a petition for leave to intervene,or who has been admitted as a party may amend the petition without requesting leave of the Board up to fifteen'(15) days prior to the first pre-
-hearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.
Not later than fifteen (15) days prior to the first prehearing conference-scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter.
Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted.
In addition, the petitioner shall provide a brief explanatior, of the bases of' the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in i-proving the contention at the hearing.
The petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to e tablish those facts or expert opinion. Petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the amendment i
under consideration. The contention must be one which, if proven, would entitle the petitioner to relief. 'A petitioner who fails to file such a supplement which satisfies these requirements with respect to at least one contention will not be permitted to participate as a party.
o
.i 4
4 o
1 Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including'the opportunity to present evidence and cross-examine witnesses, t
A request for_a hearing or a petition for leave to intervene must be filed 1
with the Secretary of the Commission, U.S. Nuclear Regulatory Comission, Washington, D.C. 20555, Attention: Docketing and Services Branch, or may be delivered to the Comission's Public Document Room, the Gelman Building, 2120 L Street, N.W. Washington, D.C. 20555, by the above date. Where petitions are filed during the last ten (10) days of the notice period, it is requested that the petitioner promptly so inform the Comission by a toll-free telephone call-to Western Union at 1-(800)325-6000(inMissouri 1-(800)342-6700).
The p
Western Union operator should be given Datagram Identification Number 3737 and the following message addressed to John F. Stolz:
petitioner's name and telephone number; date petition was mailed; plant name; and publication date and page number of this FEDERAL REGISTER notice. A copy of the petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Comission, Washington, D.C. 20555, and to Gerald Garfield, Esquire, Day, Berry & Howard, Counselors at Law, City Place, Hartford, Connecticut 06103-3499, attorney for the licensee.
Nontimely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained absent a determination by the Comission, the presiding officer or the presiding Atomic Safety and Licensing Board that the petition and/or request should be granted baseduponabalancingofthefactorsspecifiedin10CFR2.714(a)(1)(1)-(v) and2.714(d).
l
,,t..:
e.
If a request for a hearing is received,-the Commission's staff may issue the amendment after it completes its technical review and prior to the completion of any required hearing if it publishes a further notice for public comment of its proposed' finding of no significant hazards consideration in accordance with 10 CFR 50.91 and 50.92.
For further details with respect to this action, see the application for amendment dated March 28, 1990, which is available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, N.W., Washington, D.C. 20555, and at the Local Public Document Room, the l
-Learning Resources Center, Thames Valley State Technical College, 574 New London Turnpike, Norwich, Connecticut 06360.
Dated at Rockville, Maryland, this 6th day of August, 1990.
FOR THE NUCLEAR REGULATORY COMMISSION Joh3 F. Stolz.Dir tor-
.Prbject Directorate I-4 I
vision of Reactor Projects - I/II.
Office of Nuclear Reactor Regulation 1
I-l i
l l
l l
L l^
r --.-
m m-m.--..- -
-