Summary of 900531 Meeting W/Epri,Numarc & Std Plant Vendors Re EPRI Advanced LWR Requirements Document for Evolutionary Lwrs.List of Attendees Encl
ML20056A500
Person / Time
Issue date: 08/02/1990
From: Kenyon T
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
PROJECT-669A NUDOCS 9008080042
Download: ML20056A500 (4)


Text

M=

TC j

j b-UNITED STATES

?

/i NUCLEAR REGULATORY COMMISSION.

'E WASHINGTON, D. C. 20555

%,y.

-August 2, 1990-

' Project'No. 669 APPLICANT:

Electric Power Research Institute PROJECT:

ALWR Requirements Document

SUBJECT:

SUMMARY

0.e MEETING TO DISCUSS THE EPRI ALWR REQUIREMENTS DOCUMENT On May 31,' 1990, representatives of the NRC, EPRI, NUMARC, and standard plant vendors met to discuss the status of the review of the EPRI ALWR Requirements Document for evolutionary light water reactors (LWRs). A list of attendees is enclo,ed.

EPRI indicated that'they felt the technical meetings that they have had with the staff during the last two weeks have been very fruitful toward giving them an understanding of the staff's positions on the open issues in the draft

- safety = evaluation report on Chapter 5 of the Requirements Document and the positions taken in SECY-90-016 " Evolutionary LWR Certification Issues and their Relationship to Current Regulatory Requirements." The applicant further indicated that they requested the meeting with the Connission on June 4,1990 because they wanted to make sure the Connission understood EPRI's )ositions on the matters in SECY-90-016 before the Connission voted on them. T1e staff-

' stated that it attempted to correctly state the positions of EPRI and the vendors in SECY-90-016 and during:its earlier meeting with the Commission.

-EPRI then stated that they are trying to obtain an industry-wide agreement on the resolution of licensing issues, but that they do not want to stand in the way of the certification of individual designs.

EPRI indicated that they are concerned that the staff may eliminate the " regulatory margin" built into design fectures offered in the future designs-by deciding to require those features in the design.

EPRI wants to be able to take credit for certain features currently not required by the NRC's regulations and regulatory policies,;but does not desire these features be made into NRC requirements.

The staffJindicated that it makes an integrated judgement on the safety of a

'desig'n based not on al1~ the features that are offered in a design, but rather upon those features that the Connission determines are required.

The staff has not adopted all the EPRI requirements because they do not fit into the staff's view of what is required for integrated safety. Many of the EPRI requirements are' good features to have in a design, but are not required for the plant to comply with the staff's safety requirements and policies. However, those items for which the staff requested the Connission to approve in SECY-90-016 are features that' the staff think appropriate to require even if the EPRI Requirements Document did nct exist.

c y

u h

h g6 HE gg' g con, 1FO s

..mem...

e 5% =

nc u1

' August 2,1990 EPR1: ended the discussion by stating lthat it believes that the staff.need not impose additional requirements on the ALWR designs'because the utilities will

. ensure the. vendors will include advanced features in these designs.

Original signed by T. Kenyon Thomas J. Kenyon, Project Manager.

Standardization Project-Directorate

..F Division of Reactor Projects - III,.

IV, V, and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next paget

' DISTRIBUTION:

vCentral File

'NRC POR F. Miraglia, 12G18 J. Partlow, 12G18 D.,Crutchfield 13A2

-W.-Travers,;11B19 PDS. Reading l T.-Kenyon1 OGC,.15B18 E.: Jordan, MNBB-3701 ACRS'(10),.Phillips J;. Taylor, EDO,17G21 T. Speis, NLS156 T. Murley, 12G18

M.' Slosson,
14E4 M. Taylor, EDO, 17G21 J.-.Scinto 0GC, 15B18 T. Cox, 12E4 D. Scaletti P.~Shea 1

=T. Hsia L.: Donate 11'

,T. Wambach s

'PDS:L$g P

D:PDS Tkej:y n:cw

.PSheat Chiller fdl/90-g/yj/90.

7/U/90 Document Name: MANAGEMENT /EPRI MTG

SUMMARY

1 y.

w Y$li

r- -

< t.

\\

. -* ALNR Utility Steering Connittee _

EPRI i

Project No. 669 cci Hr. E.-E. Kintner-ALWR Utility Steering Connittee GPU Nuclear: Corporation One Upper Pond Road Parsippany, New Jersey 07054

-Mr. William Sugnet

~ Nuclear Power Division Electric Power Research Institute P.O. Box 10412 Palo Alto, CA.94303 l

l I

\\

i t

l.

i 1.

\\

1:

l l

.l l

l l

l l

l l

le

\\

l

?

l

.I E

'y tl

  • *I.
  • ENCLOSURE Meeting Attendees Review Status of EPRI ALWR Requirements Document May 31. 1990 Narre Organization W. Rasin NUMARC G. Vine EPRI J. Trotter EPRI-E. Kintner Chairman of the EPRI Utility Steering Com.

W. Sugnet EPRI C. Brinkman CE J. Taylor NRC/EDO T. Speis

- NRC/RES-W. Travers

~ NRC/NRR/ADSP T. Mwley NRC/NRR

- F. Miraglia NRC/NRR C. Miller NRC/NRR/PDS T. Kenyon NRC/NRR/PDS J. Partlow NRC/NRR/ADP M. Slosson NRC

- M. Taylor

- NRC/EDO J. Scinto NRC/0GC T. Cox NRC/NRR/PTSB.

D. Scaletti NRC/NRR/PDS J'

og,

6

%