ML20055J359

From kanterella
Jump to navigation Jump to search
Notification of 900803 Meeting W/Westinghouse in Rockville, MD to Discuss Approach to Control Room Design & Technologies Used in AP-600 Design.Draft Agenda Encl
ML20055J359
Person / Time
Issue date: 07/30/1990
From: Donatell L
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC, Office of Nuclear Reactor Regulation
References
PROJECT-676A NUDOCS 9008020145
Download: ML20055J359 (4)


Text

~

p # U'%,,

l t

g

. [*i.ic[ i A

UNITED sT AT Es NUCLEAR REGULATORY COMMISSION 5?

.- 8 WASHINGTON, D. C. 20$bb s %. ?/ /

July 30. 1990 f

Project No. 676

[

MEMORAl(DUM FOR:

T. Murley B. Grimes P. McKee 1

F. Miraglia F. Congel A. Thadani W. Russell, ADT J. Roe Acting Chief. EAB J. Partlow ADP C. Grimes J. Dyer, EDO D. Crutchfield B. Boger F. Gillespie S. Varga G. Laines W. Bateman G. Holahan M. Virgilio T. Cox C. Rossi B. D. Liaw J. Zwolinski J. Richardson E. Butcher W. Travers l

THRU:

Charles L. Miller Director CM F Standardization Project Directorate Division of Reactor Projects - !!!,

IV, Y and Special Projects FROM:

Loren F. Donate 11 Project Manager Standardization Project Directorate Division of Reactor Projects - !!!,

!Y, Y and Special Projects

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING 11EETING WITH WESTINGHOUSE ELECTRIC CORPCRATION TO DISCUSS THEIR APPROACH TO CONTROL ROOM DESIGN AND TECHNOLOGIES USED IN THEIR AP-600 DESIGN (SEEENCLOSEDAGENDA)

DATE & TIME:

August 3, 1990 9:30 a.m. - 4:15 p.m.

LOCATION:

One White Flint North 11555 Rockville Pike i

Rockville, MD 20852 Room 14-B-11 i

1 g80 5 90073o 676 PDC

\\

l e

  • 2*

July 30, 1990 l

i l.

PARTICIPANTS *:

NRC WESTINGHOUSE R. Correia R. Beck R. Eckenrode L. Hanes F. Coffman J. Carrear l

L. Donate 11 J. Cox l

l j

Maf 9lgnedBy:

Loren F. Donate 11, Project Manager Standardization Project Directorate l

l Division of Reactor Projects - III, IV, Y and Special Projects I

l

Enclosure:

As stated cc: See next rage

  • Meetings between NRC technical staff and applicants or licensees are open for

{

interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to *0 pen Meeting Statement of NRC Staff Policy,"

43 Federal Register 28058,6/28/78. However, portions of this meeting may be closed to the public to protect Westinghouse Electric Corporation proprietary l

information. Members of the public who wish to attend should contact L. F.

I Donate 11at(301)492-1141.

)IST EBUTION:

i incen riley RLandry NRC PDR EChelliah PDS-Reading JWachtel 1

DScaletti LDonatell OGC THsia EJordan TKenyon Receptionist, White Flint TWambach ACRS(10)

RCorreia GPA/PA REckenrode VW11 son FCoffman i

NGret:m PShea PDS:t PDS:P P

P[

CMiller(/#j D:PDS PShea LDor DSca tti:cw 7 /3D/90

/33/90

/

0 g / 0/90 3

Document Naine: DH MTG W/ WEST. 8/3 j

i

Project tio. 676 Westinghouse Electric Corporation AP-600 cc: Mr. W. J. Johnson Nuclear Safety Departrent Westinghouse Electric Corporation Water Reactor Division j

Box 355 Pittsburgh, Pennsylvania 15230 Nr. B. A. McIntyre Advanced Plant Safety and Licensing Westinghouse Electric Corporation j

Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 Ms. R. K. Beck Advanced Plant Safety and Licensing Westinghouse Eltctric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 i

Hr. M. D. Beaumont Nuclear Technology Systems Division Westinghouse Electric Corporation One Montrose Metro 11921 Rockville Pike Suite 350 Rockville, Maryland 20852 Mr. D. F. Giessing Division of Nuclear Regulation and Safety Office of Converter Reactor Deployiunt, NE-12 Office of Nuclear Energy Washington, D.C.

20545 Mr. S. M. Modro EG&G Idaho Inc.

P. O. Box 1625 Idaho Falls, Idaho 83415 9

-.n...

,.n,

+

t.

'o S

ENCLOSURE i

DRAFT AGENDA i

WESTINGHOUSE /NRC MEETING HUMAN FACTORS IN THE AP600 CONTROL ROOM DESIGN AUGUST 3, 1990 PURPOSE: PROVIDE THE NRC WITil AN AWARENESS OF THE WESTINGHOUSE APPROACH TO CONTROL ROOM DESIGN AND TECHNOLOGIES USED IN THE AP600 t

l 1.0 NRC INTRODUCTION - Rich Correia 9:30 - 9:45 i

1.1 NRC Objectives for the Meeting 2.0 WESTINGHOUSE INTRODUCTION - Rita Beck 9:45 - 10:00 2.1 Evolutionary of Westinghouse Control Room Design 2.2 Human factors Incorporated in Design Process 2.3 Extrapolation from SP/90 Design 3.0 STATE OF THE ART IN HUMAN FACTOR - Lew Lanes 10:00 - 12:00 3.1 Definition of State-Of-The-Art 3.2 Human Factors in Conventional Control Room (NUREG-0700DCRDR)

^

3.3 AP600 4.0 LUNCH 12:00 - 12:45 l

5.0 HUMAN FACTORS ENGINEERING - John Carrera 12:45 - 2:45 5.1 Control Room Design Overview 5.2 Control Room Design Process 5.3 Control Room Design 5.4 Control Room Design Validation 5.5 Locations Outside Control Room 5.6 Control Room Design Review 6.0 AP600 WORKPLAN FOR DESIGN CERTIFICATION - J. Cox 3:00 - 3:45 7.0 WRAPUP - Brian McIntyre 3:45 - 4:15 e

v

-w

-w a

ee-

-r

---f'T==-e+we w

g r'w--*

e

+r--

pw e

---m-e-p-

ew A'-'-

1-9-


-