Corrected Monthly Operating Rept for June 1990 for Point Beach Nuclear Plant Unit 2
ML20055H782
Person / Time
Site: Point Beach 
Issue date: 06/30/1990
From: Krause C
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20055H779 List:
References
NUDOCS 9007300058
Download: ML20055H782 (1)


Text

.sR~~~-

e - --

A

' ~%

2 Q_

7 -Q g

.~.).~b:'}-

[.. g.

~

~"

r

'g ;r -

.\\=

f r-

-~

OPERATING ~ DATA REPORT

- DOCKET NO. 50-301.

~

DATE-July 24, 1990-(revised).

COMPLETED BY?

_C. W.-KRAUSE TELEPHONE 4141221-2001 --

~

OPERATING STATUS

~'

~

'~ "~

1. UNIT NAME: POINT 15EACH NUCLEAR PLANT UNIT 2 NOTES
2. REPORTING' PERIOD:

JUNE'1990

.jF

3. LICENSED THERMAL POWER (MWT):.1518.5
4. NAMEPLATE RATING (GROSS MWE:

523.8

5. DESIGN ELECTRICAL. RATING (NET MWE):

497.

6; MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

509.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

485.

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

NOT APPLICABLE I

10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 720 4,343

-157,032

12. NUMBER OF HOURS REACTOR.WAS CRITICAL 720.0 4,343.0 137,688.8-
13. REACTOR RESERVE SHUTDOWN HOURS 0.0

'O.O 216.7

14. HOURS GENERATOR ON LINE 720.0 4,343.0 135,548.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0-1302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,080,806 6,562,863' 193,146,399
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 372,160 2,260,480 65,585,700 ~
18. NET ELECTRICAL ENERGY GENERATED (MWH) 355,720 2,163,144 62,501,754
19. UNIT SERVICE FACTOR 100.0 100.0 86.3
20. UNIT AVAILABILITY FACTOR 100.0~

100.0

'86.5

21. UNIT CAPACITY FACTOR (USIF., MDC NET) 101.9.

102.7 81.3

22. UNIT CAPACITY FACTOR (tGING DER NET) 99.4:

100.2 80.1

23. UNIT FORCED OUTAGE P'.TE O.0 0.0 1.2
24. SHUTDOWNS SCHEDULER, OVER NEXT.6 MONTHS (TYPE, DATE,.AND DURATION OF EACH):

FORTY-TWO DAY REFUELING AND MAINTENANCE OUTAGE ' STARTING OCTOBER 5, 1990.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED'DATE OF STARTUP =.NOT' SHUTDOWN DATA RFDnRTRn AND FACTORS CALCULATED AS REQUESTED'IN NRC LETTER DATED SEPTEMBER 22, 1977 9007300038 900724 ii PDR 'ADOCK 05000301 R-P,DC....., -

-.