ML20055H752
| ML20055H752 | |
| Person / Time | |
|---|---|
| Site: | 05000113 |
| Issue date: | 07/24/1990 |
| From: | Cusanovich M ARIZONA, UNIV. OF, TUCSON, AZ |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9007300010 | |
| Download: ML20055H752 (2) | |
Text
~
34
![,,
4 T H E' : U N I V E R S I T Y_
O F 1A RIZO N A
{l y
~
~ -
T U C S O N, A R I Z O N A 85721 cot 1EGE OF ENGINEERING AND MINES DiPARTMt NT of NUCLLAR AND ENERoY rNotNEEklNo July 24,1990
- Document Control Desk -
U.S. Nuclear Regulatory Commission; Washington, D.C. 20555
Reference:
- Docket No. 50-113
.F Facility License No. R-52
Subject:
Availability of Funds for Future Decommissioning of the University of
~ Arizona ' Research Reactor as Per the: Reporting Requirements of
~
LGentlemen:
Certification is herein submitted by the University of Arizona (Licensee) that a request will
- be'made to the Arizona Board of Regents to appropriate funding from the Arizona State Legislature for the decommissioning of the University of Arizona' Research Reactor (UARR) at some future :
-date when a decision for final shutdown must be made.
As partC thd license renewal applicatica for the.UARR submitted to the NRC October 17
- 1988, an _ estimated cost of $450,000 in 1985 voltan, was projected to restore the UARR site to a
. condition of unrestricted use level.' This co".t is based on the contract cost of decommissioning the
~
x Virginia Tech Research. Reactor and et Northrop Corporation TRIGA Reactor as given by Chem Nuclear Systems, Inc.
.Using the Consumer Price Index from " Economic Indicators", published by the United States
' Government Printing Office, the decommissioning cost for the UARR as of April,1990 is estimated to be 5538,000. Ilowever, the projected cost escalation of a unit volume of low-level radioactive waste may exceed the Consumer Price Index and require further consideration when estimating the future cost of decommissioning the UARR.
Sin ' rely, i
Dr. Michael A. Cusanovich Vice President for Research and Dean of Graduate College C
Dr. ' Jack Cole, Provost l
cc:. The University of Arizona l[j0
-o 9007300010 900724
,PDR.ADOCK 05000113 Sl I'
PDC h
ai, 4,
m, p,f c ;t e w~.
?Q4,j?
. Dr. Ernest T. Smerdon, Dean r" I College of Engineering and Mines The University of Arizona
! Dr. Steve Crow -
Interim Department Head' Nuclear and Energy Engineering Dept.
Harry J. Doane.
i Reactor Supervisor University of Arizona Research Reactor -
(
b?
- Subscribed and sworn to before me by -b<4,<.43 /munu.a,.;
this
- J,f day of b2-
,'1990.
(/
- s p:
$dN Y//
Notary Pubtf My~ commission expires a hfi#gt /voj.
^
e v
t'(-
3
_ i; s t
i i
?
- h
')
' /.
.ti n
Wl
--z_
'E(
I{;'
l-j t
,