1
-z
/
j x
T.
University-of-Wisconsin
.t NUCLEAR REACTws 1.ABORATORY ADDRESS
. DEPARTMENT OF NVCLEAR ENGINEERING AND ENGINEERING PHYSICE MFCHANICAL ENGINEERING BUILDlHO PHONE (608) #62 3397 1613 UNIVERSITY AVENUE MADISON 63Fotk16iR -
Re: 10CFR.Pt-50.75 July 19, 1990
'O ' S. Nuclear-Regulatory Commission ATT:- DOCUMENT CONTROL DESK Washington,- DC 20555 lSUBJCCT:
License R-74, Docket 50-156; 10CFR Part 50.75 Decommissioning Funding Plan The following information is submitted in response to the requirements of 10CFR Part 50.75 for a decommissioning funding
_ plan.
This letter includes a document _ indicating the decommissioning cost estimate and the means used to escalate the cost;untillthe expiration date of the current operating: license.
Also included by reference is a copy of-a submission under
-License 50-156/SNM-116 dated July 16, 1990 and signed (on behalf
'of the Regents of the University of Wisconsin) by C.J.-Stathas,
~GeneraliCounsel~and Ansistant Trust Officer, in which the University of-Wisconsin indicates that,-as a state agency, the funds for decommissioning will be obtained'wben needed.
.The estimate is based on decontamination of the facility and.
returningsit-to unrestricted use within a-three-year period. The funding required-is estimated as $1.2 million in the' year 2000.
Sincerely, f'evY R. J..Cashwell, Reactor Director RJC/cke
Enclosure:
UW Nuclear Reactor Decommissioning Cost Estimate Letter signed by C.J.
Stathas c:.
U.S.
NRC, 799 Roosevelt Rd., Glen Ellyn, IL'60137 f
$S gjdd2
}{90072'60245900739DR/-ADOCK=05000156' i
r 6ll PDC
j A
UNIVERSITY OF WISCONSIN NUCLEAR REACTOR DECOMMISSIONING COST ESTlilATE The cost analysis that follows is based on NUREG/CR 1756, Technology, Safety and-Costs-of Decommissioning Reference Nuclear Research and Test Reactors,-
including its companion documents.
Cost Category Reference UWNR Estimated Estimated-1981 $
1981 $,
Disposal of radioactive materiale.
Neutron activated material; 16,610 10,800 Reduced by 35% due to larger distance:from core to shield (2.4 m diameter yi 2.0 m) and UWNR wall not completely surrounding core.
Also reduced because UWNR core is 1.2 m above pool bottom vs. 0.46 m.
Contaminated materials 60,600 30,300
- Reduced by 50% due to smaller building size, with cooling system and auxiliary equipment compactly housed in one area. Half the assumed rubble volume in reference reactor is outside-the reactor building.
In addition, pool concrete is well protected against contamination at UWNR due to liner and epoxy coatings.- Finally, the contamination level at UWNR is extremely-low-even the estimate above would require a major fuel rupture to produce enough contamination to require the
-expenditure indicated.
Radioactive Wastes 9,620 9,620 The' number from the reference document is used unchanged.
Total Disposal Costs 86,290 50,720
+--.-_-.mamm_..a--u_
m
.g M
i 1
N;- f.
z
/
Staff Labor-530,570 265,285 q
.Our analysis o the work force required for vu,z. facility is 6.8 man-years yL. the 12.6 man-year estimate in the reference document.~
r Y
Even this.is high, considering,that t
the facility.has been sperated, upgraded, maintained, health physics services provided,etc. with a
_ considerably smaller _ staff than indicated for decontamination.
In addition, many of the items
- indicated as chargeable. in the
' referenced-documentcare normal university overhead duties not borne-specifically for the project in question.. Therefore, the final estimate:is 50% of the value in the.
reference.
Energy'.
13,790 13,790 The'value used-in the reference document
-1 is used unchanged.
t
~ Special Tools,and Equipment 21,150 21,150:
The value used in the reference is used
-unchanged.
={
Miscellaneous: supplies 6,210 6,210
.The value used in the reference is used unchanged.
Nuclear Insurance 4,620 4,620 The value used.in the reference is used unchanged.
. License Fees 13,950 0,000 m-It is assumed that the university will remain exempted from the NRC licensing-fees, so this ' item is zero for UWNR.
1-j
- Subtotal 676,580.
361,775 y
- Contingency (25%)
169,150 90,445 TOTAL 845,730 452,220 7
t t
2 of 3 i
1 V
e 4
Yv.'
,\\
Note:. Cost of spent fuel shipment assumed.to-be paid per current contract
.with US DOE. Cost for' facility demolition and site restoration is not included, since it is_ expected that, once the reactor is decontaminated, the
. site uill be used for other university activities.
Assuming the decommissioning begins in June, 2000 when the present operating license-expires, the cost. identified above should be increased by 5%'per i
year. The 5% figure-is based on the_ preponderance;of' salary in-the estimates T
-above'and recent history on-pay rates for academic staff and civil: service employees of the university.
Therefore, in the next 20 years.the prices above are expected to escalate by 'a factor of 2.65; LTherefore, the. decommissioning cost of: the University of Wisconsin Nuclear Reactor is expected-to' be $1.2 million in the year 2000.
.3-5!