m f
'JUL 2 31990 DISTRIBUTION:
'NAC'F/s,run(RRSS/SGTB r/f i
'CMabDdriald """ RChappell ERichardson HWLee BWhite yarcia SGTB:HWL 71 5971 General Electric Company ATTN: Mr. G. E. Cunningham P.O. Box 460 Pleasanton, CA 94566
Dear Mr. Cunningham:
This refers to your application dated June 21, 1990, requesting renewal of Certificate of Compliance No. 5971 for the Model No. IPO.200 package.
Since
+
an application was submitted et least 30 days prior to the expiration of the Certificate of Compliance, the Certificate of Compliance will not be deemed to have expired until the application has finally been determined.
In connection with our review, we need the information identified in the enclosure to this letter.
This.information should be provit'.ed within 90 days from the date of this letter. Additional information requested by this letter should be submitted in the form of revised pages.
If you have any questions regarding this matter, we would be pleased to meet '.<ith you and your staff.
Sincerely, Original S16ned by atamms z. ECDONALD B
Charles E. MacDonald, Chief Transportation Branch Division of Safeguards and Transportation, NMSS
Enclosure:
i L
As stated 1
O C 3,1 l
0 RJ y i
//
1/.1 a
{
0FC: SGTB
- 5GTBffW 5GTB((#C7) :5GTB >
- 5G
- 5GT f
HAME:HWLee/1g 'r &..... Q............J k'rdson :RChappell Q............
,.f..
- MGarcia /.BWhite
- ERich'a
- Cf nhld:
h //7 90 BAN
'/9b
//h90 7 /7 90
/ 90 1
900;250320 900723 i
0FFICIAL RECORD COPY 0713-[cb 5971 LTR TO MR. GE CUNNINGHAM ADOCK
{DR
71-5971 JUL 2 81990 Encl. to ltr dtd.:
OPERATING PROCEDURES Specify the method used for leak checking the package if the drain 1.
line is permanently closed and sealed.
The Certification Drawings No.129D4756 and No.129D4758 should
- 2.
be updated to the latest revision.
Justify that the procedure given in item no. 6,p, Chapter XVIII, Section K, is adequate to remove all water from the cask cavity.
3.
The leak check requirements for an empty package given in items no. 5.j, 7.1 and 8.s, Chapter XVIII, Section K, are not consistent 4.
with the cask cavity leak requirement given in item no. 4.d, Chapter XVIII,Section I.
Clarify this inconsistency.
Revise the operating procedures to tddress the installation of a lock wire and seal as referenced in Section 3(a) of the Consolidated.
5.
Safety Analysis Report.
MAINTENANCE PROCEDURES Chapter XVIII, Section Z requires visual inspection of the cask lid bolts for damage resulting in greater than 0.025 inch reduction.
1.
Justify that a reduction of this magnitude is detectable by visual inspection.
L-