ML20055H088

From kanterella
Jump to navigation Jump to search
Grants one-time Exemption from Requirement to Submit Rev 10 of Updated FSAR on 900720
ML20055H088
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/23/1990
From: Varga S
Office of Nuclear Reactor Regulation
To:
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20055H089 List:
References
NUDOCS 9007250187
Download: ML20055H088 (5)


Text

lvw $

n.s 3

W 7590-01

+

=,

,h{

UNITED STATES, NUCLEAR REGULATORY COMMISSION InJthe Matter of-

~

BALTIMORE GAS AND ELECTRIC Docket Nos. 50-317 iCOMPANY-and 50-318 (CalvertCliffsNuclearPower

)

. Plant, Units 1 and 2)

)

EXEMPTION I.

The Baltimore Gas and Elstric Company (BG&E/ licensee) is the holder of Facility -

Operating License Nos. DPR-53 and DPR-69, which authorizes operation of the Calvert Cliffs Nuclear Power Plant,' Units _1 and 2 (the facilities).

The licenses provide,.among other things, that.the facility is subject,to all rules, regulations

and' orders of the Nuclear _ Regulatory Commission (the Commission)'now.or hereafter z in-effect.

The facilities are pressurized water reactors located at the licensee's site in Calvert County, Maryland.

II.

10'CFR'50.71(e)(4) requires that licensees submit a revision of the Updated Final Safety Analysis-Report (UFSAR) no less frequently than annually,

.and shall reflect all changes tip to a maximum of 6 months prior to the date of filing._ This' regulation would require the submittal of Revision 10 of the Calvert Cliffs UFSAR by July 20, 1990.

9007250187 900723 PDR

(. DOCK O$000317 P

PDC

e a-o i

-III.

By: letter dated June 8, 1990, the licensee requested a one-time schedule exemption from 10 CFR 50.71(e)(4).

Specifically, the licensee requested that it be permitted to delay the annual update for Revision 10 from i

July 20, 1990, to October 20, 1990, which is a-three-month delay.

The Commissior may grant exemptions from the requirements of the regulationswhicn,pursuantto10CFR50.12(a),are: (1) authorized by law -

will not preseni an undue risk to the public health and safety, and are i

consistent with the common defense and security; and (2) present special circumstances.

Section 50.12(a)(2)(v) of 10 CFR Part 50 indicate's_that special circumstances exist when an exemption would provide only temporary relief from the applicable regulation and-the licensee has made good faith efforts to comply with the regulation.

IV.

a The requested exemption is administrative and would not affect plant equipment, operation, or procedures. The UFSAR contains the analysis, assumptions and technical details of the facility design and operating

. parameters. Until the UFSAR is annually updated, the recent changes are documented in the licensee's safety analysis reports (SAR) and in the Commission's Safety Evaluations (SE) for actions requiring prior approval.

Internal quality assurance audits and NRC inspections conducted in 1989

' identified weaknesses in the licensee's updating process for'the annual update of the UFSAR.

Weaknesses were noted in the methods for identifying

g

-.3 a

modifications which required updating and failure to incorporate safety evaluation reports, Generic Letters, and other material as described in 10CFR50.71(e).

The 11censee's subsequently initiated an investigation to determine the cause of the' lack of adequate administrative controls for the updating

. process. The lack of central oversight and adequate administrative procedures

-resulted in relying on individuals being responsible; thus, many required items were not included in the periodic updates of the UFSAR as required by the regulations.

The licensee has initiated corrective actions for the identified weaknesses which include centralized control utilizing an experienced consultant on a full-time basis for the short-term and increased supervisory involvement both in the short-term and long-term.

It'was determined that the Revision 10 update to the UFSAR would require additional interface with the responsible design engineers to ensure both completeness and quality of_the updates _to be~ incorporated in Revision 10.

The schedule extension is needed in the short-term, for the reasons I

discussed above, to assure adequate time is available to allow the licensee-to-provide a complete and quality update. The extended time also allows the

'long-term e'ffort to improve the update process, which is being pursued in 1

parallel, by utilizing the benefits of the lessons learned in the current L

. update effort.

Both the short-term and long-term effort are being handled i

L, primarily by the same individuals.

I L

L

I N ll bIM i '

g f

1

--4 e

The proposed exemption constitutes a three-month delay in the annual-update'ofLthe UFSAR. The requested exemption is a temporary one and is necessary to assure both improvement in the completeness and quality of the Revision 10 update and future submittals. The additional time provided for the Revision 10 sabmittal allows the feedback necessary to assure that the final procedures used_for_ future submittals are workable, efficient, and result in a quality product.

The licensee has made a good faith effort to comply with the-regulations by initiating corrective actions, both short-term and long-term, to improve its.submittals when the deficiencies were identified both internally-and by the.NRC inspection process. 'Therefore, the exemption would only provide temporary relief from the applicable regulation and the extension would allow the time necessary for corrective action and would result in an improved update for Revision-10.- Thus, there are special circumstances present which satisfy 10CFR50.12(1)(2)(v).

V.

Accordingly, the Commission has determined, pursuant to 10 CFR 50.12(a),

that (1) an exemption as described in Section III is authorized by law, will not present an undue risk to trie public health and safety, and is consistent with the common defense and security and (2) in this case, special circumstances are present as described in Secticn IV. Therefore, the Commission hereby grants the following exemption:

Accordingly, the Commission hereby grants a one-time exemption, as described in Section III above from 10 CFR 50.71(e)(4) from the requirement to submit Revision 10 of the Calvert Cliffs UFSAR on July 20, 1990.

Revisien 10 shall be submitted by October 20, 1990.

l l

w

,1.

4 Pursuant to 10 CFR 51.32, the Commission had determined that.the granting of this exemption extension would have no significant effect on the quality of the human environment (55 FR 29920 July 23,1990).

A copy of the licensee's reouest for exemption dated June 8, 1990, is available for public inspection at the Commission's Public Document-Room, in the Gelman Building, Lower Level, 2120 L Street, NW, Washington,- D.C...and at the Calvert County Public Library, Prince Frederick, Maryland. Copies may be

-obtained u'pon written' request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.

20555, Attention, Director, Division of Reactor Projects 1/11.

-This Exemption is' effective upon issuance.

Dated at Rockville, Maryland, this 23 day of July 1990.

FOR THE NUCLEAR REGULATORY COMMISSION

+

M ven argh.Yrec Division of Reactor Pr ts - I/II 3

Office of Nuclear Reactor Regulation