..e Jul. 2 31990 SGTB:MGL
_71-9033 L-s Amersham Corporation
. ATTN:
Ms. Cathleen H. Rougnan l:
!i 140. North Avenue Burlington, MAE01803 w
Dear.Ms..Roughan:
This refers to your application' dated December 1, 1989, as supplemented April ~
l 24, 1990, reauesting an amendment to Certificate of Compliance No. 9033 forL 1
the Model No. 660 package.
1 In connection with our review, we need the information identified-in the enclosure to this letter.
'This information should be provided within 30 days from the date of this ~
]-
L, letter. ~ Additional information requested by this letter should be submitted in the form of revised pages.
If you have any questions regarding this matter; we would be pleased to meet with you and y w r staff, t
Sincerely,
.l 9
ll Criginal Signed by ct1ARLESE. MACDONALD 3
Charles E. MacDonald, Chief Transportation Branch i
Division of Safeguards and Transportation, NMSS j
Enclosures:
As stated Distribution:
2, y fMRClile1Centerc' NMSS r/f c
K NRC PDR-SGTB r/f
.CEMacDonald DKasun a
~
i CRChappell' MGarcia ERichardson DHuang MMessier N0sgood
. Regions (5)
-State Health Official 0.FC...: S.G.T.B.,7/f g :SGTB _
- SGTB g...: S. G. T. B........: S.
- SGTB A
NAME;Mggtc!g.,,;p,uggg,,,,,;NQsgggd,,,,iERichgrdsgn;C...?BE911.lCE.gc.gg,ld,
.DATE: 7//l /90 : 7/ fl /90 : 'l/13/90:
/
/90 : 7 //d /90 : 7 /3 7 /90 0FFICIAL RECORD COPY F
9007240358 900723 0
.C PDC L
m n
~
j,g n
Enc 1 to ltr dtd:
JUL 2 31990 DRAWING Drawing No. 66025 should be revised as follows:
a.
The drawing should specify the standards and procedures that will.be used for fabricating, welding, and inspecting the package.
If the> standards
.and procedures to be used are in M11-W 6858, a copy of this specification should be t'ncluded in the application, and referenced in'the drawing.
. The drawing s'hould show the size, type, and location of the welds, I
b..
c.
Drawing'No. 66025, Rev. C,. consists of three sheets. However, sheet.No.
I contains references to sheet No. 4. This discrepancy should be corrected.
The drawing should specify-the material that will be used for the shell d.
of the modified Model No. 660 Gamna Ray Projector shippin? aintainer. Note there appears to be a discrepancy between the drawing en Ge text of the application.
STRUCTURAL 1.
Clarify whether the test unit was fabricated from the new shell material.
If not, show that the package is adequate with the new shell material.
.2.
Specify the gross weight of the te:;t unit.
OPERATING PROCEDURES 1.
Revise the operating procedures to include the specific tests.or measurements that will be made prit.c to each shipment of an empty package to assure that the package is empty. The tests or measurements shculd be capable of detecting the presence of a source-assembly, even if the cable (pigtail) has'been removed or shortened.
-n o