Text
-..................
g w
JUL 12 1990
.SGTB:NLO.
Amersham Corporation
-ATTN: Ms. Cathleen M. Roughan 40 North-Avenue Burlington, MA 01803
Dear Ms. Roughan:
This refers to your application dated August 14, 1989,- as supplemented May 4, 1990, requesting renewal of Certificate of Compliance No. 9028 for the Model No. 684 package. In connection with our review of your May 4,1990, supplement,
. e need the information identified in the enclosure to this letter.
w This information should be provided within 90 days from the date of this letter.
The additional-information requested by this letter should be submitted in the form of revised pages to the application.
If you have any questions regarding this matteri we would be pleased to meet
-with you and your staff.
Sincerely, Original Signed by.
Q1ARLES E. MACDONE Charles E. MacDonald, Chief Transportation Branch Division of Safeguards and Transportation, NMSS
Enclosure:
As stated Distribution:
a"NRC0FCud?
PDR NMSS r/f SGTB r/f CMacDonald RChappell CWithee N0sgood 0FC: SGTB $
- SGTByf[:SGT
- SGTB
...........................)g.,......
g
'%\\.............
NAME:N0sgood-
- CWith e
- RChappell :CMa anald:
bkhE h)h)hb h)l N hb $ h)f5)hb I hh 5)hb $
OFFICIAL RECORD COPY
[Ok7jggg29007,12
_+e c
k 072o 02e o r'e PDC E\\ l
.e t'
\\
71-9028 JUL 12 '199)
. Enclosure-to ltr dtd:
OberatinaProcedures-
- 1.
Section 7.1 -
-Item 6c,Ecorrect USD to USA.
}?
Item 9, include Iridium 192 in the contents.
~
Clarify how item 11 differs from item 6.
1'l Clarify when the procedure applies to each individual package, or to. crates and outer packages.
.l!.
2.
Section'7.3 -
For shiament of an empty package, include specific tests or measurements which s1ould be used to assure that the package is erpty.
The tests or measurements must be able to detect unauthorized source assemblies and source assemblies where the connecting cable (pigtail) has been removed or-shortened.
Clarify when the. procedures are for individual packages, crates and outer packages, or both.
Item 4a, note that a shipment -is not exempt from all of 49 CFR Part 175 3
when transported by aircraft.