. -. ~ _
-'-*n
_ _ _ ~ _ _
414 Nicollet Mall :
-I Minneapohs, Minnesota 55401 1927 Telephone (612) 330 5500
)
July 10, 1990 Monticello Technical Specifications Section 6.7.A.3 i
4 US Nuclear Regulatory Commission Attn: Document Control Desk e
Washin5 ton, DC 20555 l
MONTICELLO NUCLEAR GENERATING PLANT ~
l-Docket No. 50 263 License No. DPR-22 4
1 Monthly Operating Report
~t June 1990 t
-Attached is the Monthly Operating Report for June 1990 for the Monticello
- Nuclear Generating Plant.
L-i.
I Thomas M Parker l
Manager j
Nuclear Support Services TMP/mkl.'
. menpsmnnw, =,,
.jp{reetor,[ Office [ofiResource' Management /cl],_
l l
c:
Regional Administrator-III, NRC NRR Project Manager, NRC
- NPC ' Resident Inspector MPCA i.
Attn: J W Ferman
. Attachment 9007190007 900630 PDR ADOCK 05000263
'R PDC J
- e. - - -
-~
i
_ OPERATING _ DATA REPORT r
p.
DOCKET NO.
50-263 DATE -
7-2-90 COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
! Notes 3
- 1. Unit Name :
Monticello 2.. Reporting period -
JUNE 3.-Licensed Thermal Power (MWt):
1670
- 14. Nameplate Rating (Gross MWe):
569
- 5. Design Electrical Rating (Net MWe):
545.4
- 6. Maximum Dependable Capacity (Gross MWe): __564
,7.: Maximum Dependable Capacity (Net MWe):
536 1-
' 8 '. If Changes Occur in Capacity Ratings'(Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A 1
-l THIS' MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 720 4343 166560
- 12. Number Of Hours Reactor Was Critical 720.0 4343.0 132198.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
. 14. Hours Generator On-Line 720.0 4343.0
--129678.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.JGross Thermal Energy Generated (MWH) 1201241 7210976 197582503 17.. Gross Electrical Energy Generated (MWH) 402282 2431243 66864115
- 18. Net Electrical Energy Generated (MWH)
- 384799
- 2338785
- 63940105
- 19. Unit Service Factor
- 100.0%
100.0%
77.9%
- 20. Unit Availability Factor-
- 100.0%
100.0%
77.9%
- 21. Unit Capacity Factor (Using MDC Net) 99.7%
100.5%
- 71. 6 % -
22.- Unit Capacity Factor (Using DER Net)
~~ 98.0%
98.7%
70.4%
i
~-
- 22. Unit Forced Outage Rate 0.0%
-0.0%
3.9%
- 24. Shutdowns Scheduled Over Next 12 Months TType,-Date, and Duration of Each) l
__NONE l
,~25.
If Shut Down At End Of Report _ Period, Estimated Date Of Startup:N/A l 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved l
INITIAL-CRITICALITY I
INITIAL ELECTRICITY l
COMMERCIAL OPERATION L
l l
l' l
l.
1 I
1 I
a, NARRATIVE
SUMMARY
-OF= OPERATING: EXPERIENCE.
i.
p DOCKET NO.-
50-263 DATE 17-2-90 i
COMPLETED-BY H.
H.-Paustiani TELEPHONE 612/295-5151; a
- MONTH JUNE lm 6.1-90
'to.
' Power operation..
6-30-90' i
t r
i g=
t t
l,
-i l
l t
li L
i Note: Power' operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
l-D i
t
?-
4 -
- l. ' 3. :
' AVERAGE DAILY UNIT. POWER LEVEL r
DOCKET NO.- 263 UNIT Monticello DATE 7-2-9 0 ' -
COMPLETED BY-H.
H.
Paustian TELEPHONE 612/295-5151-MONTH JUNE-'
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) j 1
537 17-534 2
538-18 534 l
3
.538 19 535 4
540 20 532
.5 543 21 531 6
542 22 536 7
540 23 535 18 541 24 527 9
540 25 530-10-538 26 528
~11-537' 27 529-i
.12
- 532 28 531
.t 13' '
532 29 526
-14 537 30 527 15-536 16 530 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
i
,7
o
.~.
i
~
. UNIT SHUTDOWNS AND POWER REDUCTIONS-D00TT NO. 50-263
[ NIT NAME Monticello DATE 07-02 '
COMPLETED BT H. H. Paustian REPORT MONTH June-TELEPHONE 612/295-5151 -
Duration Reason Method LER-System Cause & Corrective No.
Date Ty(pe (hours)
(2) of No.
Code e
Action to 1)
Shutdown (4)
(5)
- Prevent Recurrence
-(3)
None 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-05)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License' Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) ip,
4--er*--
--'p---
"g.s+-b
+d'a^fv'e w
A#
-(=---
,4--ve-.
y yipr
(
m' T'
-y ar-Fg"'~-
y g