1

[

X Rocletdyne Division Rockwell international Corporation Rockwsli

~i C.J sM" International Telex 698478

-l ROCKETDYN CNPK e

i i

I July 9,1990 in reply refer to 90RC08721 m

- Mr. Charles -J. Haughney, Chief J

Fuel Cycle Safety Branch J

Division of Industrial and Medical 4

Nuclear Safety U.S. Nuclear Regulatory Commission Washington, D.C. 20555 1

Subject:

Financial Guarantee for the Decommissioning of the NRC Licensed Facilities at the Santa Susana Field Laboratory (SSFL)

Ref. 1:

Letter from P. D. Rutherford to.C. J. Haughney (NRC), " Financial Guarantee for the Decommissioning of NRC Licensed Facilities at the Santa Susana Field Laboratory (SSFL); May 21, 1990-Ref. 2:

Letter from Anthony J. Adduci (Dor BAN) to Philip D. Rutherford (Rockwell), " Decontamination anf acommissioning of Building 20 Hot Cell, Area IV, of Santa Suso Field Laboratory (SSFL)"

Dear _Mr. Haughney:

'This letter revises a similar letter on the same subject. (Reference 1).

Pursuant to the financial guarantee requirements of 10CFR70.25, DOE has' acknowledged responsibility for the D&D of Bldg. 20, and-has stated that L,

funding has been requested (see attached letter from DOE, Reference 2).

DOE l

has been supplied with a detailed cost estimate of tho' D&D, which formed the basis for the annual cost figures contained in the decommissioning plan i.

submitted to NRC on April 12, 1990.

L Rockwell understands from conversations with Merri Horn of your staff that the

'NRC is willing to accept' the referenced DOE letter as a letter of credit as provided in 10CFR70.25. We further understand that transmittal of this letter-prior to July 27, 1990 meets the requirements for timely submittal of L

financial guarantee.

Rockwcil is also currently procuring a similar letter of commitment from DOE covering other NRC licensed land and facilities at the SSFL which require decontamination. These are limited to the sodium disposal facility (burn pit) h and Buildings 9 (ISI development) and 5 (Uranium Carbide Fuel Pilot Plant).

l l

g71603579007o9 C

ALOCK 07000o 3 i

[-

PD V

[]lR9 k

6, 7-ip f

. 90RC08721

-July-9, 1990 L

Page'2 1

. Please' confirm' that this is an acceptable basis upon which to provide financial assurance, and contact.the undersigned at (818)'718-3413 if you have=

any questions.

-- Very truly yours, ROCKWELL' INTERNATIONAL Rocketdyne Division d[4h P. D._Rutherforc, Manager Nuclear Safety & Reliability Engineering PDR:dr Enclosure as stated 1

t t

1

' gy i

'~

l4 1r.

D(3

+

W O

@pe#.k CCPCrtmont of Encrgy.

bC San Francisco Operations Office-J

,. Q

~

.1333 Broadway g

gg c--R Oakland, California 94612' g

j j

%eg,,,ggggds L

i f

?

Mr.' Philip D. Rutherford 7LRocketdyne Division MailLStop 055-HB07

,6633 Canoga Avenue

+

1 Canoga Park, California 91303-p

SUBJECT:

- Decontamination and Decommissioning of Building-20' Hot

'n Cell Area IV of Santa Susana Field Laboratory -(SSFL)-

Dear Mr.' Rutherford:

~;

This - is in. reference to a letter from Mr.

R. _ Lancet of your org u 'zation concerning the Decontamination and Decommissioning

'(DLo if Building 20-at SSFL.

The letter asked-'if DOE:wouldtbe

,resps.ible 'for funding the D&D effort at -Building-2 0. -

By L.

.' accepting L this. financial responsibility, this would. satisfy 3the

.NuclearLRegulatory Commission (NRC)-licensing D&D requirements.

Building'20-Hot Cells were contaminated:by Atomic International

-(part of LRockwell International) in the performance of a DOE contract.

DOE has, acknowledged its responsibility; to ' D&D of

[

Building 20.

[

In. accepting the responsibility, DOE has placed in Contract:No. DE-o L

=AC03-89SF16021 in'the Statement of Work the direction'to Rockwell

'i B'

International to D&D Building 20 and has provided funding to-i b

perform the:D&D effort.

'Hbever, currently Rockwell has asked for a no-cost extension to their contract in order to prepare a cost estimate for the cost i

growth.of. the D&D ef fort. This indicates that the budget estimates which '. DOE - has' made for future years for this ' D&D effort will definitely be needed.

As to whether the funds will.be-available'on time - for an orderly D&D activity to take place, is' ' strictly : a function of (1) where the Department of Energy places this particular effort in the priority list with other D&D activities g

y and'(2) how Congress allocates funds to the various efforts of the DOE.

p 05343 2d 1

l l!

i t

=.

f t

'f i

,[/ [.. ',

4 ilip D. Rutherford, RDl 2-f;'~

' ;,j

-In summary, DOE - is responsible for. Building 20 D&D.

DOE has submitted budget requests ' for an orderly D&D; but the time and'

-' quantity of funds which will' actually flow to the project, and when

- all of the D&D will be. complete is at this point not known nor will-DOE. commit to a schedule date to complete.-

Sincerely,

~

- (

. 7 l

Anthony J. Adduci Project Manager Nuclear Energy Div;.sion i

1 e

1 9

i

.... -,.,..