1
[
X Rocletdyne Division Rockwell international Corporation Rockwsli
~i C.J sM" International Telex 698478
-l ROCKETDYN CNPK e
i i
I July 9,1990 in reply refer to 90RC08721 m
- Mr. Charles -J. Haughney, Chief J
Fuel Cycle Safety Branch J
Division of Industrial and Medical 4
Nuclear Safety U.S. Nuclear Regulatory Commission Washington, D.C. 20555 1
Subject:
Financial Guarantee for the Decommissioning of the NRC Licensed Facilities at the Santa Susana Field Laboratory (SSFL)
Ref. 1:
Letter from P. D. Rutherford to.C. J. Haughney (NRC), " Financial Guarantee for the Decommissioning of NRC Licensed Facilities at the Santa Susana Field Laboratory (SSFL); May 21, 1990-Ref. 2:
Letter from Anthony J. Adduci (Dor BAN) to Philip D. Rutherford (Rockwell), " Decontamination anf acommissioning of Building 20 Hot Cell, Area IV, of Santa Suso Field Laboratory (SSFL)"
Dear _Mr. Haughney:
'This letter revises a similar letter on the same subject. (Reference 1).
Pursuant to the financial guarantee requirements of 10CFR70.25, DOE has' acknowledged responsibility for the D&D of Bldg. 20, and-has stated that L,
funding has been requested (see attached letter from DOE, Reference 2).
DOE l
has been supplied with a detailed cost estimate of tho' D&D, which formed the basis for the annual cost figures contained in the decommissioning plan i.
submitted to NRC on April 12, 1990.
L Rockwell understands from conversations with Merri Horn of your staff that the
'NRC is willing to accept' the referenced DOE letter as a letter of credit as provided in 10CFR70.25. We further understand that transmittal of this letter-prior to July 27, 1990 meets the requirements for timely submittal of L
financial guarantee.
Rockwcil is also currently procuring a similar letter of commitment from DOE covering other NRC licensed land and facilities at the SSFL which require decontamination. These are limited to the sodium disposal facility (burn pit) h and Buildings 9 (ISI development) and 5 (Uranium Carbide Fuel Pilot Plant).
l l
g71603579007o9 C
ALOCK 07000o 3 i
[-
PD V
[]lR9 k
6, 7-ip f
. 90RC08721
-July-9, 1990 L
Page'2 1
. Please' confirm' that this is an acceptable basis upon which to provide financial assurance, and contact.the undersigned at (818)'718-3413 if you have=
any questions.
-- Very truly yours, ROCKWELL' INTERNATIONAL Rocketdyne Division d[4h P. D._Rutherforc, Manager Nuclear Safety & Reliability Engineering PDR:dr Enclosure as stated 1
t t
1
' gy i
'~
l4 1r.
D(3
+
W O
@pe#.k CCPCrtmont of Encrgy.
bC San Francisco Operations Office-J
,. Q
~
.1333 Broadway g
gg c--R Oakland, California 94612' g
j j
%eg,,,ggggds L
i f
?
Mr.' Philip D. Rutherford 7LRocketdyne Division MailLStop 055-HB07
,6633 Canoga Avenue
+
1 Canoga Park, California 91303-p
SUBJECT:
- Decontamination and Decommissioning of Building-20' Hot
'n Cell Area IV of Santa Susana Field Laboratory -(SSFL)-
Dear Mr.' Rutherford:
~;
This - is in. reference to a letter from Mr.
R. _ Lancet of your org u 'zation concerning the Decontamination and Decommissioning
'(DLo if Building 20-at SSFL.
The letter asked-'if DOE:wouldtbe
,resps.ible 'for funding the D&D effort at -Building-2 0. -
By L.
.' accepting L this. financial responsibility, this would. satisfy 3the
.NuclearLRegulatory Commission (NRC)-licensing D&D requirements.
Building'20-Hot Cells were contaminated:by Atomic International
-(part of LRockwell International) in the performance of a DOE contract.
DOE has, acknowledged its responsibility; to ' D&D of
[
Building 20.
[
In. accepting the responsibility, DOE has placed in Contract:No. DE-o L
=AC03-89SF16021 in'the Statement of Work the direction'to Rockwell
'i B'
International to D&D Building 20 and has provided funding to-i b
perform the:D&D effort.
'Hbever, currently Rockwell has asked for a no-cost extension to their contract in order to prepare a cost estimate for the cost i
growth.of. the D&D ef fort. This indicates that the budget estimates which '. DOE - has' made for future years for this ' D&D effort will definitely be needed.
As to whether the funds will.be-available'on time - for an orderly D&D activity to take place, is' ' strictly : a function of (1) where the Department of Energy places this particular effort in the priority list with other D&D activities g
y and'(2) how Congress allocates funds to the various efforts of the DOE.
p 05343 2d 1
l l!
i t
=.
f t
'f i
,[/ [.. ',
4 ilip D. Rutherford, RDl 2-f;'~
' ;,j
-In summary, DOE - is responsible for. Building 20 D&D.
DOE has submitted budget requests ' for an orderly D&D; but the time and'
-' quantity of funds which will' actually flow to the project, and when
- all of the D&D will be. complete is at this point not known nor will-DOE. commit to a schedule date to complete.-
Sincerely,
~
- (
. 7 l
Anthony J. Adduci Project Manager Nuclear Energy Div;.sion i
1 e
1 9
i
.... -,.,..