Text

,4 1

a

,s jp* ".

~, " W UNITE D ST ATES j' 'fg, # ]$:c i NUCLEAR REGULATORY COMMISSION

[

%.. *. ;- j wassiNotou. o. c. rosss

%. ',',. /

Jmo 3 a Applied Management Systems, Inc.

ATTN: ~ John Perkins 6116 Executive Boulevard, Suite 440 Rockville, Maryland 20852-4906

[

Dear Mr. Perkins:

Subject:

Task Order No. 014 Entitled, " General System Maintenance", Under

,c' Contract No. NRC-33-89-132.

-In'accordance with the task order procedures of the subject contract, this E

letter definitizes Task Order No. 014.

This effort shall be performed in accordance with the enclosed Statement of Work and the contractor's

~

proposal for this. Task Order No. 014 dated June 14, 1990, incorporated herein by reference.

Task Order No. 014 shall be in effect f rom June 18, 1990 through October 31, 1991 with a total cost ceiling of $1,427,889.38, The amount of 6

$1,347,065.45 represents the total estimated reimbursable costs and the amount of $80,823.93 represents the fixed fee.

- The amount presently obligated with respect to this task order is 5450,000.00 of which $424,528.30 represents the total estimated reimbursable costs and the amount of $25,471.70 represents the_ fixed fee, This obligated amount may be unilaterally increased from time to time by

'the Contracting Officer by written modification'to this task order.

The obligated amount shall, at no time, exceed the task order ceiling.

When

.and if the amount (s) paid and payable to the Contractor hereunder shall equal' the obligated amount, the Contractor shall not be obligated to continue performance of the work unless and until the Contracting Officer shall increase the amount obligated with respect to this task order.

Any work undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk.

The Contractor shall comply with the provisions of 52.232 Limitation of Funds for

- this incrementally funded task order.

1 Accounting Data for this Task Order No. 014 are as follows:

L B&R No.:

010-20-63-250 FIN No,:

D1391-0 APPN No.:

31X0200.010 Obligated Amount: $450,000.00 o

l i

9007130007 900620

~

PDR CONTR NRC-33-89-132 PDC j

+

+

^

?" N w

p:# ge *'

u,

. ;y -s e-1 i

.g.

1

'u It is' estimated that the funds provided by this modification are. sufficient' l

1 to. cover performance through September 30, 1990.

The issuance 'of, this task order does not amend any terms or conditions of L

E the subject contract, k

.Your contacts during the course of'this task order are:

Technical ~ Matters:

Alan Dolleck j

Project Officer (301) 492-4928-

. Con 6 actual' Matters:

Edna Knox-Davin Contract Administrator (301) 492-4731 i

Please indicate your acceptance of this Yask-Order No 014 by having an.

official, authorized.to bind your organization, execute.three copies'of this document-in the space provided and return two copies to the Contract Administrator. You should retain the third copy for. your records '

Sincerely,-

3 2 y?L.

L'(,

[-

Sharon Bell, Contracting Officer

-Contract Administration-Branch No. 2 Division of Contracts and Property Management-Office of Administration

[

p

Enclosure:

1 L

As stated F

/

/

s

.j A

'C t

L'AMG VAsslM.7 TITLE

/

+

lif70/90

+

!DATE I

I-i 1

N

~,

i.-

~

rage 4a i '

, /p..g',

UNITED STATES I~

N NUCLE AR REGULATORY COMMISSION W A$ Mise 0708d O. C. 20644 Tast Oreer Numoer

'%,,,,,.*j g

NRC-33-89-132 g

To Be Completed By APPLIED MANAGEMENT SYSTEMS. INC.

Task Manaoer_

TASK ORDER RE00EST TOR PROPOSAL l

Task Order '

Title:

General systom Maintenanco

/

System Number /Name:

User Contact / Phone /0rganization: Alan Dn1tock

/ _ YM094

/

IPM Requested Period of Performance: from 7 /P /90 Through 10/31/91 TAC #:

Af>$P8A STATEMENT OF WORK This task order consists of general maintenance activities to be assigned by the Project Officer as the need artses.

Activities to be performed under this task order shall consist of, but not be limited to, the following:

1.

Correcting progam problems as required to keep the system operating.

2.

System and prograni enhancements to make the system operate more efficiently or to meet the chtaging needs of the user.

3.

Updating of system and program documentation and procedures.

oew requirements 4.

Implenentation of modifications necessary as the resul:

imposed by policy or regulation.

5.

Computer programming, as required, to implement approved modifications.

The contractor shall provide maintenance support as specifled in the above

~

activities for the systems listed in attachment. (as well as new systems that become operational during the life of the task order), shown along with the anticipated laber category and hours that may be required.

Contractor shall perform maintenance duties under this task uMer both on site and off site, as required.

M.

hJ Date

/

8

-Task Manager Signature s

r l

l

F Page Ib

'o' UNITED ST ATES

~ I'! 5

'g NUCLE AR RECULATORY COMMISSION f

W!=$HtNCT ON,0. C. 20$$$

a t

i.

  • /'

Task Oroer riumoer NRC-33-89-132 14 l

To Be Completed By APPLIED MANAGEMENT SYSTEMS, INC.

Project Officer Task. Order

Title:

General System Maintenance System Number /Name:

_/

SCHEDULE OF _DELIVERABL,E_SS ltem Quantity form Date of Delivery

  • I (if applicable) i 6

AS SPECIFIED BY THE PROJECT OfflCER i

i p

i

  • Number of working days following effective date of Task Order Project Officer Signature

. /.

N.

Date

\\

c s-3,

, l,, % a

?

e T.O.l14-PersonnelEstinatesbySysten SYSTEN LABOR ESTIMATED

-SYSTEN ACRONYM-' CATE00RY BOURS NUSER SYSTEM XAME

.... ~...

1208 Tech.AssignmentControlSystes TACS SSA 1000 SSA 690 PA 1000 SA 800 SP 770 JP 1000 1213 Manteer Systes MPS PA 100 l

1215 PlahtSpeelficBackfitSysten PSBS SA 40 1216

. Safety Issues Management Systen SIMS CONS 1600 9370 Colacrsion CONS 400 1217 InternationalProgransExport laport Licenso IPELTS SSA 40 1234 Work Ites Track..ng Systes WITS SSA 2000 1236 Operator LicensLn Tracking Systen OLTS SSA 100 1238 ASLBP Management ysteps Support AAMS PA SO i

RegilityControlSystes-lesourceUti11ationReport RRUS-PA 50 1240 Fac FACS PA 50

-1 1242-1246 Allega non Management Systes AMS SSA 30

~

LicensngTrackingSystes SSA 1240 Servic s and Training Information' LTS 1266 1267 Systes STIS SSA 40 l

1289 LicensefeeReportingSysten FEES SSA 200 SA 75 1297' legulatoryInformationTracking Systes RITS SSA 100 SSA 60 SA 100 PA 70 SP 100 1296 legulatoryInformationTracking Systen liMSS =

RITS SSA 100 SSA 100 SA 100 PA 100 CAB SA 40 SP 100

'Ceneral Le 3001 Full Time E [Ivalency ITE SA 200 3005-3022 Contracts I ornationSystem CIS PA 40 SA 80 3031J BoldinaActi'onSysten.

EAS SA 10

-j 3035 Controller Bud t SYS./Ezecution CBS SSA 10 3036 Administrative t Control ABC PA 300

,3110 Personnel Budget C trol-PBC SA 205 r

3436 Regional Budget Control-IBC PA 200 1

.1206 TechnicalAssistanceItogras Support Systen TAPSS SA 10 1207 LicenseReportingSysten IDRDS SSA 10 b

f i

1 l

('

.,i -

b f & *4

  • c',

s L.

.7.O.I14-PersonelEstimatesby'Systes i

- SYSTEN'

. SYSTEM 11BOR ESTIKATED

' llDBER '

SYSTEN NAME ACRONYM CATEGORY BOURS Y

1210

NationtiStandardsCoenittee?

Participation NSCS SP 30 1212.

-SealedSourceandDevice

-SSDS FA

'40 t

L 1221 Gen.LicenseDataBaseSysten CLDS SSA 240-B'.1 1251~

Off.ofInvestigationNgat.

Information OIMS SA 20 l

L;',

. v..

3003.'

'JutomatedPayrollSystes

, PAY SA,

1000 FA

.2000

[ fl, 3007" PropertyandSupplySysten PASS SA

-170-JP 400

<!X SP 100 '

i.

3100' AutomatedPersonnelSysten APS SA 600 4-t M

SP 1800 JP 600:

i 6

3200 IntegratedFinancialManagement InforeationSysten IrKIS SA 2000 SA 80

.j 1

.3300 CriminalHistorySystes CHS SA 150 SP 100 p

+

- L1201 -

LicensingManagementSystes.

. ths SSA 10-

{

l1204 Travel Info. Processing Systes ;

TRIPS SA 10 SA 10 g

m

-1205-

'!ppection Report Tracking Systes.. IRTS<.

SA 10 1225:

TimesharingAccts.Ngat.Systen TAMS t

-1 1228'.

NXSS Case liork Systes '

CASE SSA 40 1239:

'VeterTrackingSystes

-VTS SSA 1990-1241~.

localPublicDocumentRoomSystes LPDR SA 10 1245 AutomatedInformationDocumentation Systen AIDS SA 10' j

'1263 Open Ites Management Systes OIMS SSA 10 H'

1265:

transportApprovalPackage l

Information Systen TAPIS SA 10-

='

Progran,peratingPlanSysten NPS SA 10 O

1291

.g n

.( ' "

1:

h

,2

+

'~ p I

f I'

e I

I 2

3

')

i

/

,4

T.O.l14-PersonelEstimatesbySysten SYSTEM SYSTEM IABOR ESTIMATED NUMBER SYSTEMEAME ACR0hTM CATEGORY E0l'RS 2001 ActionItes,TrackingSysten AITS SA 10 3002 Telephone Directory Systen TEL SP 1000 SA 10 3017 ACRS Ixciment Control Systen px SA 10

.ProectManagementSystes FMS SA 10 j

3096 3060 ASLBP-TextMgst. System ATM SSA 760 SSA 400 SA 10 3120-AgencyTrainingSystem ATS SSA 390 SSA 200 SSA 200 SA 190 3456 ConsissionCalendaringSysten CCS SA 2000 NetworkAdcinistration SSA 2000 EUDOCS Potent.al PA

  • S00 SSA total hours = 12000.00 SA total hours = 8000.00 PA total hours = 4000.00 SP total hours = 4000.00 JP total hours = 2000.00 Consultant h s=

2000.00 TotalBours=

32000.00 ed e

3 1