Provides Reasonable Assurance That Funds Will Be Available for Decommissioning Research Reactor.Rept on Cost Estimates Encl
ML20055E036
Person / Time
Site: University of Missouri-Columbia
Issue date: 06/29/1990
From: Mcgill J
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20055E038 List:
References
NUDOCS 9007100307
Download: ML20055E036 (4)


Text

~~

t r ~

.W, - ( * ,, .'
g -<

'; b a t Office of Vice President for -

Administrative Affairs UNIVERSITY OF MISSOURI

'?g 215 University Hall  !

Columbia, Missouri 65211 Q, , Telephone (314) 882 3611

'A, l

l June 29,1990

l. <

/J -

I

. Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission .

u Mail Station PI 137 l Washington, DC 20555.  ;

,.o I

- ATTENTION: Document Control Desk i j

REFERENCE:

Docket 50-186  ;

University of Missouri Research Reactor -

l 1 License R 103

SUBJECT:

Report required by 10CFR50.33(kX2) providing reasonable assurance that'  !

funds will be available to decommission the University of Missouri j Research Reactor. j

.i Dear Sir; i

The Curators of the University of Missouri, a state government entity, as holders of heense ,

R-103 for the University of Missouri Research Reactor (MURR), submit this statement ofintent as the mechanism that provides reasonable assurance that funds will be available to decommission :

the MURR when necessary. In conformance with 10CFR50.75(eX2)(iv), this statement ofintent assures that the University of Missouri'will request appropriation of funds for decommissioning sufliciently in advanen of decommissioning to prevent delay of required activities.

As required by 10CFR50.75(eX2Xiv), a cost estimate for decommissioning the MURR is enclosed. This estimate of the total cost of decommissioning is $9.0 million with a 25%

- contingency included. This estimate was developed using the methodology of the Battelle Pacific

. Northwest Laboratories (PNL) report Technoloev. Safety and Costs of Decommissionine

- Reference Nuclear Renenrch and Test Renctors (NUREG/CR-1756). The reference costs from NUREG/CR-1756 have been acUusted to be specific to the MURR Facility. These costs are associated directly with decommissioning and do not reflect costs which may be incurred during , glp .

transition from a dynamic operating facility to the point of beginning decommissioning.

D

, . . ~ ,

" / 0 900710030t'900629 r 07 f

PDR ADOCK 05000186 (,

P PDC . , , , , .

~.}

b

. ; .. ~

[c .. m '.. .

t -. .- ,.

-41 Page 2 June 29,1990 10CFR50.75(d) specifies that licensees acUust their cost estimates for decommissioning

. periodically over the life of the facility. The University of Missouri will use the decommissioning inflation formula provided in 10CFR50.75(cX2) to adjust the decommissioning cost estimate for MURR at five year intervals. These cost adjustments will be retained with the decommissioning records required by 10CFR50.75(g)(3).

If there are any questions regarding this report or the cost estimate prepared by MURR staff, please contact Walt Meyer, Reactor Manager, or J.C. McKibben, Associate Director at 314/882-4211.

I certify that I am the Vice President for Administrative Affairs for the Curators of the University of Missouri and, as such, am authorized by the Board of Curators to execute contracts,,

-other instruments and agreements, as indicated in Section 70.0100. of the Collected Rules and Regulations for the University of Missouri, a copy of which is enclosed.

N

$MES T. MCGILL lce President for Administrative Affairs Enclosures (2) xc: Administrator, Nuclear Re .tlatory Commission, Region III (with enclosures)

Judson Sheridan, Vice Provost for Research and Dean of Graduate School (with enclosures)

Edward D. King, Risk and Insurance Management (with enclosures)

J.S. Morris, Interim Director, University of Missouri Research Reactor (with enclosures)

r- ap < < . ,

TColiscted Rules & Regulttl2ns th 9, 70,010  :

University of Missouri t #

Chapter: Execution of Instruments

?

i

-S172.390, R.S.Mo.-1959; Bd. Min. 4-11-58, p. 12,512; Amended L 5-20-77, p. 37,690 and-3-28-80,.p. 38,100; Revised-Bd. Min 6-14-85..

l 70.010 GENERAL EXECUTION OF CORPORATE OR BOARD INSTRUMENTS i

A. ALL INSTRUMENTS -- All instruments affecting The I l Curators of the University of Missouri, the Board of-

- Curators of the University of Missouri, or the l University generally shall be executed on behalf thereof as provided in:this section unless execution thereof shall have otherwise been specifically provided for and directed by 'the Board. .

l-B. REAL ESTATE

1. Any of the lands donated by the Atlantic & Pacific Railroad Company to the State of Missouri by deed i dated the sixteenth day of February, 1871, and all L other lands conveyed by corporations or individuals L to the State of Missouri for sale in aid of the state university, may be sold and conveyed by the j

' board of curators, and deeds of conveyance to same '

shall be execut'ed by the president of the board, y signed by him, w.ith the seal of the corporation l attached thereto, and attested by the secretary of j u the board; and provided further, that any )

L conveyances of such lands heretofore made by'said L

board in accordance with:the provisions of this section shall divest the State of Missouri of all title to the same and vest said title in the

. grantees, their heirs and assigns forever.

2. Instruments conveying title to real estate owned.by i The Curators of the University of Missouri shall, I L upon approval of same by the Board of Curators, be L executed in the name of The Curators-of the j l University of Missouri and signed by the President i of the University or his/her designee, with the corporate-seal affixed, attested by the Secretary, h

L C. ALL CONTRACTS, OTHER INSTRUMENTS AND AGREEMENTS -- All I contracts'and other instruments and agreements of The Curators of the University of Missouri shall be executed in the name of The Curators of the University l of Missouri and signed by the President thereof, the l President of the University, the Vice President for  ;

Administrative Affairs, or such other officer as may be specifically designated by the Board, and the l

l- Print Page: 12/86 Page 1 of 2

.4 *- , ,

e v .Colle'cted Rul:s & Regulations Continued 70 olo .

  • University of Missourl

!j

[

. Chapter: Execution of Instruments- D C. continued corporate seal may be affixed, attested by the (

Secretary. The named officers may, by written '

authorization, delegate special authority to- sfgn specific-instruments on their behalf to the Chancellor of-each campus. The named officers and the Chancellors receiving delegation ~from such officers may, by specific written authorization, delegate to one or more designees all or partial authority to sign instruments on their behalf,.such written authorization to be-filed with the President, Vice President for Administrative-Affairs and Secretary of The Board of Curators.

D. AGREEMENTS BINDING ON BOARD -

1. Any instrument heretofore or hereafter executed in conformity with this Section 70.010 shall have the same force and validity as if executed by the President of the Board; g 2. No contract or other instrument or agreement which '

has not been duly authorized by The Board-of j Curators and executed in the manner herein provided I or in a manner specifically provided and. directed l l by the Board shall be binding upon The Curators of k I

the University o,f-Missouri.